Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹6.2 L
Closing Date
7 Jul 2026, 5:00 pm6d left
GM JAL
Sector-5, Noida
Strengthening of Sewerage (Connect the Sewer line of Sector-144, 5percent Abadi to main deep sewer line in Sector-144) Noida.
2026_NOIDA_1165411_1
17/SM-JAL-III/2026-27
Open Tender
Civil Works - Others
270 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹6.2 L
1 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling manualy/by mechanical means i/c stacking of servisable material and disposal of unserviceble material within 50 mtr. lead as per direction of E/I. bituminous road. | 5,500 | Sqm. | 164.91 | ₹9,07,005 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kines of soil. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 16,983 | Cum. | 136 | ₹23,09,688 |
| 3Extra for every additional lift of 1.5 or part thereof in all kind of soil. | |||||
| 3.01 | a) 1.50 - 3.00 m | 9,600 | Cum. | 15.8 | ₹1,51,680 |
| 3.02 | b) 3.00 - 4.50 m | 8,000 | Cum. | 31.6 | ₹2,52,800 |
| 3.03 | c) 4.50 - 6.00 m | 5,700 | Cum. | 47.4 | ₹2,70,180 |
| 3.04 | d) 6.00 - 7.50 m | 3,300 | Cum. | 63.2 | ₹2,08,560 |
| 4Centring and shuttering i/c strutting, propping etc. and removal of form for all heights. | |||||
| 4.01 | a) Foundation, footings, bases of columns etc. for mass concrete. | 461 | Sqm. | 181.64 | ₹83,736.04 |
| 5 | Cemnet concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all material, labour, Tools & plants etc. required for proper completion of the work. | 107 | Cum. | 5,820 | ₹6,22,740 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
TD17.pdf
Tender Documents • 1.66 MB
BOQ_2185758.xls
BOQ • 0.29 MB
C17.xls
Additional Documents • 0.03 MB
Download all tender documents and submit your bid