| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | R1₹7.1 LAccepted-AOC | R1 | Accepted-AOC Lowest amount quoted by the R1 bidder hence accepted the bid and also submitted the required security deposit and valid bod | |
| 2 | R1₹71.3 LRejected-Finance | R1 | Rejected-Finance R2-Highest amount quoted bidder |
Tender Value
₹7.1 L
EMD Value
₹17,900
Closing Date
14 Nov 2019, 5:00 pmClosed
Assistant Executive Engineer, KIP RB Sub Division
Assistant Executive Engineer, KIP RB Sub Division No.26,Karunagappally
Rectification of Canal
2019_Irrig_302848_2
16/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Kunnathoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,600
Yes
online
₹17,900
Yes
16 Jan 2020
7 Nov 2019
16 Nov 2019
7 Nov 2019
14 Nov 2019
7 Nov 2019
Amount
Scheme 1: Rectification work of Thrikunnapuzha North Minor 2 between chainage 155 m and 200 m
od37148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Scheme 2: Rectification work of Thrikunnapuzha North Minor 2 between chainage 200 m and 270 m
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
15.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Scheme 3 : Rectification work of Thrikunnapuzha North Minor 2 between chainage between 270 m and 320 m
od37148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od37451/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to line and levels including proper compacting, curing, watering etc complete with all leads and lift etc complete as per specification or as directed by departmental officers at site
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 4 : Rectification work of Thrikunnapuzha North Minor 2 between chainage between 320 m and 370 m
od37148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od37463/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 5 : Rectification work of Thrikunnapuzha North Minor 2 between chainage between 370 m and 420 m
od37148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od37463/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 6 : Rectification work of Thrikunnapuzha North Minor 2 between chainage between 420 m and 510 m
od37148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
od37463/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37351/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
G GOPAKUMARAN PILLAI
Bidder Name
RAMAN PILLAI N
G GOPAKUMARAN PILLAI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_439208.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .