Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹4.2 L+₹19,850 (4.98%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹9,191
Closing Date
16 Oct 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
GENERAL AMC 2024 25 Fully Comprehensive Annual Maintenance of Avanamcode 1A,Kurumassery, kadungalloor LI Scheme under Electrical LI section Aluva General Electrical Work
2024_Irrig_694401_11
PWD/BLDG/ALY/6816/2024-2025
Open Tender
Electrical Works
Item Wise
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹815
₹9,191
27 Dec 2024
8 Oct 2024
18 Oct 2024
8 Oct 2024
16 Oct 2024
8 Oct 2024
Amount
Overhauling
OD240465/2023-2024:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD240466/2023-2024:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD240590/2023-2024:Dismantling the above110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Lowering
OD240761/2023-2024:" Lowering down and erecting 5-10 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load "
OD240763/2023-2024:" Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load "
OD240764/2023-2024: Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD240765/2023-2024:Lowering down and erecting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and supplies
OD240479/2023-2024:Supply and providing 7W LED Bulb
OD240480/2023-2024:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD240481/2023-2024:Supply and providing of LED Indication lamps in panel board-blue colour
OD102272/2024-2025: Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providing suitable size insulated sockets at the termination points or soldered properly, providing numbering ferrules for the proper identification of the wiring, keeping the wiring firm by suitable tie/ tie mounts/ PVC duct etc as required.-1.50 sq mm single run with required sockets.
OD240482/2023-2024:Supply and providing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Colour
OD100194/2024-2025:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection. 30 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor,
OD100217/2024-2025:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection. 2 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Capacitor, Cylinderical Type, suitable for direct connection to motors.
OD95543/2024-2025:Charges for demolishing the existing damaged concrete foundation of 100 HP BB Motor at Avanamcode 1A using special tools and deposit the demolished concrete blocks outside the pump house
14.8:Providing and laying in position cement concrete 1 :3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required.
OD96821/2024-2025:Supply , installation, Testing and Commissioning of Phase Failure relay and UV release(LnT) in conjunction with existing LnT MCCB in the Panel board using 40A 4 pole Isolator, 3 Indicators and 3 Numbers of suitable Control Wiring to get complete protection against Single phasing, Under voltage, Over voltage etc.
OD97535/2024-2025:Supply and Installing 20 W LED Tube light.
OD97542/2024-2025:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6317 or its equivalent size
OD102255/2024-2025:Supply 185 A, 3 pole power Contactors (For 100 HP motor), AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC
OD102256/2024-2025:Supply 145 A, 3 pole power Contactors (For 80 HP motor), AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC
OD102261/2024-2025:Supply 4 CO 14 Pin relays Without lockable test button 230V 3A , L&T or Schneider make, giving connections etc. as required.
OD122005/2024-2025:supply and providing ABRO PUF -750 Multipurpose Expandable PU Foam insulation Sealant Spray.
AMC of motor pump sets
OD240456/2023-2024:Fully Comprehensive Annual Maintenance of up to 5HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD240452/2023-2024: Fully Comprehensive Annual Maintenance of 31-60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD103736/2024-2025: Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs , overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, base plate, pumpset and maintain the motor pump sets electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD240842/2023-2024: Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD240902/2023-2024: Fully Comprehensive Annual Maintenance of above 110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD240814/2023-2024: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD240816/2023-2024: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD240817/2023-2024:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD240818/2023-2024: Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
SHIJU M.T
Bidder Name
SHIJU M.T
GK INDUSTRIES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1083358.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .