Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Furnished all the documents. |
| 2 | Accepted-Technical | Accepted-Technical Furnished all the documents. |
| 3 | Accepted-Technical | Accepted-Technical Furnished all the documents. |
| 4 | Accepted-Technical | Accepted-Technical Furnished all the documents. |
| 5 | Accepted-Technical | Accepted-Technical Furnished all the documents. |
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
10 Aug 2026, 5:00 pmClosed
Chief Construction Engineer, R.W. Circle, Keonjhar
O/o C.C.E., R.W. Circle, Keonjhar
Construction of New Tahasil Office Building at Hatadihi in the District of Keonjhar for the year 2025-26.
2026_CERWI_137253_1
NCB 12-RWCKJR-2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
450 days
Keonjhar
4 documents required · 4 mandatory
₹10,000
₹3.8 L
Yes
10 Sept 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
28 Jul 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Earth work excavation in foundation in all kinds of soil within 50 m initial lead & 1.5 m initial lift including rough dressing & breaking clods to maximum 5 cm to 7 cm & laying in layers not exceeding 0.3 m in depth & as per the direction of the Engineer-in-charge. | 1,458.21 | cum | 241.48 | ₹3,52,121.26 |
| 2 | Supplying, filling in foundation and plinth with sand in layers not exceeding 23cum (9") thick including watering and ramming with the cost, conveyance, royality, taxes of all materials, labour, T & P required for the Work etc. complete as per specification and direction of the Engineer-in-Charge. | 4,147.46 | cum | 730.73 | ₹30,30,673.45 |
| 3 | Cement Concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2") size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming watering and curring etc. complete including cost and conveyance of all materials with all taxes and royalities and all labour with T & P required for the work etc. complete including dewatering if required as per specification and direction of the Engineer-in-Charge. | 275.66 | cum | 6,756.44 | ₹18,62,478.95 |
| 4 | Flyash brick masonry in C.M. (1:6) using brick of size 25cmx11cmx 8cm of crushing strength not less than 75kg/cm2 with dimentional tolerance plus minus 8% after immersing the bricks for six hours befour use incl.lowering, placing in position, watering and curing and cost, conveyance, royalties and taxes of all materials, cost of labour & T&P etc. complete as per the direction of E.I.C..(For foundation & plinth). etc all complete.
Foundation | 325.04 | cum | 5,678.53 | ₹18,45,749.94 |
| 5 | Ground Floor | 455.26 | cum | 5,711.53 | ₹26,00,231.92 |
| 6 | First Floor | 82.44 | cum | 6,089.75 | ₹5,02,039.34 |
| 7 | Head Room | 8.36 | cum | 6,524.71 | ₹54,546.58 |
| 8 | Cement concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 260.68 | cum | 7,947.83 | ₹20,71,840.32 |
| 9 | Double under reamed pile foundation with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel. | 27 | cum | 28,264.26 | ₹7,63,135.06 |
| 10 | Providing and laying RCC M-25 grade using 20 mm and downgraded size hard black broken granite stone chips of approved quality and from approved quarry including hoisting, lowering and laying concerete and compacting by using vibrators watering and curring for 4 weeks centering and shuttering and finishing the exposed surface smooth providing grooves of beads where necessary including cost, conveyance, royalities and taxes of all material and labour required for the work etc. complete excluding cost and conveyance of M.S. Rod or steel and binding wires of 18 to 20 guage and labour charges for straightening, cutting etc of the M.S. rods or tor steel and tying grills and placing in proper position as per specification and direction of the Engineer-in-charge. work with minimum compressivee strength in work test of 150kg/cm2 in 15cm cum cubes at 28 days cost and conveyance of M.S. Rod or steel and binding wires of 18 to 20 guage and labour charges for straightening, cutting etc of the M.S. rods or tor steel and tying grills and placing in proper position as per specification and direction of the Engineer-in-charge.
Footing | 215.87 | cum | 6,811.06 | ₹14,70,303.52 |
stage.html
html • 0.17 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.39 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_603553.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .