Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
27 Feb 2023, 2:00 pmClosed
Executive Engineer JPDCL ED-I Parade Jammu
Office of Executive Engineer JPDCL ED-I Parade Jammu
Job Contract Labour for Repair/Reclamation of Damaged Distribution Transformers of different capacities viz 25 KVA, 50/63 KVA, 100 KVA, 200/250 KVA, 300 KVA, 400 KVA, 500 KVA, 630 KVA at Workshop of Electric Division Ist JPDCL Parade Jammu
2023_PDD_204284_1
ED-I/e-NIT/01 of 2023-24 dt 06/02/2023
Open Tender
Repair and Maintenance Services
Item Rate
30 days
Parade Jammu
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,000
Executive Engineer JPDCL ED-I Parade Jammu
₹90,000
15 Jul 2023
6 Feb 2023
28 Feb 2023
6 Feb 2023
27 Feb 2023
6 Feb 2023
Amount
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 25KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils (upto 630 KVA)
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 50/63KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 100KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 200/250KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 300KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 400KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 500KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 630KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer .
The Trikuta Engineer
MAHA SHAKTI ELECTRICAL WORKS
M/s Wazir Agencies
suram singh contractor
MAHALAXMI TRANSFORMER INDUSTRY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .