Loading…
Loading…
Tender Value
₹66.5 L
EMD Value
₹67,000
Closing Date
1 Oct 2026, 6:00 pm4d left
EXECUTIVE ENGINEER SALINITY CONTROL DIVISION Jam-Khambhalia
Construction Of Protection Wall At Left Bank of Sindhani River At Village Bakodi Ta. Kalyanpur Dist. Devbhumi Dwarka
345586
Tender Notice No. 10 of 2026-27
Open
Civil - All
Works
Devbhumi Dwarka
4 documents required · 4 mandatory
₹2,400
Executive engineer, salinity control division jam-khambhaliya
₹67,000
17 Sept 2026
17 Sept 2026
17 Sept 2026
1 Oct 2026
17 Sept 2026
BILL OF QUANTITIES
(A) Percentage rate tender (Upto INR 50 Cr.)
Name of work :- Construction Of Protection Wall At Left Bank of Sindhani River At Village Bakodi
Ta. Kalyanpur Dist. Devbhumi Dwarka..
Quantitie Total
s estimate Uni Amount
m Item of Work Figures
but may t according to
1 Care & diversion of river/creek incl. required dewatering 1.00 Job. 1% of
during construction of earthen dam, C.O.T. and allied Estimate
works as prescribed and directed etc. complete
2 Providing motorable service road during construction 0.080 Km. 13190.00
period as directed with necessary earth work, jungle
cutting and maintenance as required etc complete.
3 Jungle clearance (Ganda Baval etc) of Light/heavy dence 1200.00 Sqmt. 3.80
(work done by manually or by machinery ) including
grabbing of & removing the roots & girth completely from
the ground & back fill with earth & making surface good as
directed including depositing & removing the material
away from the site of work at own risk and cost as and
where directed etc completed for following.
(a) Light density
4 Excavation in all sort of strata and formations incl. 2330.00 Cum. 79.00
depositing the unused full excavated stuff as and where
directed incl. sorting and stacking useful materials as
directed up to 200 m. lead and all lifts etc. complete incl.
dewatering.(A) IN OVERBURDEN INCL. HARD MURRUM
5 Providing, cutting, bending, binding and fixing in position 4.48 MT. 76574.00
as per drawing .TMT BAR , reinforcement for R.C.C. works
and anchor bars incl cost of black annealed 16 to 18 BWG
M.S.. Wire etc.complete with all lead and lift.
6 Prov. & Laying in position controlled cement concrete 1231.00 Cum. 4369.00
using cement , sand and crushed metal coarse aggregate
by machine mix incl. necessary formworks, compaction by
mechanical vibrator, curing as directed with all lead & lift
etc complete. Excluding cost of steel
FOR .Training Wall, Side Wall, and General Purpose
(A) Concrete Grade M-15 and MSA-40mm (Graded)
7 Providing and fixing in position 100/110 mm dia PVC Pipe 300.00 Rmt. 358.00
weep holes in the retaining walls/sidewall/abt. etc.
8 Providing and laying graded filters of sand, gravel/metal 220.00 Cum. 530.00
and over size metal ( 100 to 150 mm) behind the
retaining wall & wing walls as directed as per approved
drawing with all lead and lifts etc complete.
9 Earthwork / Back filling with selected earth brought from 2740.00 Cum. 141.00
out side borrow area or from excavated useful material
incl. watering ramming, Compaction with pneumatic
temping and all lead and lift etc complete.
10 Providing & filling in Contraction Joints with 12mm thick 90.00 Sqmt. 702.00
bitumen sheet of approved quality as directed.
Amount Put to BID 66,50,999.13/-
Rupees Sixty –Six Lakh Fifty Thousand Nine Hundred Ninety-Nine And Thirteen Paisa Only
I/We am/are willing to carry out the work at… ............... % above/below percent (Should be written in figures and
words) of the estimated rate mentioned above. Amount of my /our tender works out as under :
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work asdirected by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input
rate mentioned in all the tender.
Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
FP Wall Bakodi Final SBD.pdf
BOQ FP Wall Bakodi.pdf
2.2 GENERAL Tech.Specif. FP Wall Bakodi.pdf
2.3 Tech.Speci. FP Wall Bakodi.pdf
Tender notice10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .