| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹53.2 LAccepted-AOC PO KETEKIBARI DISTT SONITPUR TEZPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | 1 | Accepted-AOC L1 AND REASONABLE | |
| 2 | 2₹62.5 L+₹9.2 L (17.4%)Rejected-Finance 622 A STREET NO 3 FIRST FLOOR SHAKTI NAGAR BATHINDA 151001 PUNJAB | BATHINDA | PUNJAB | 151001 | 2 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | VARNI BUILDERS L1 | Truly Technos LLP L2 |
|---|---|---|---|---|---|
| 0.00SCHEDULE 'A' PART-I (B/R PORTION) | |||||
| 1.00 | Carry out Site inspection and Survey to MAFI- PS-I and MAFI- PS-II including to and from and loading boarding of equipment required to carryout works of "back feed" system at AF Station Tezpur. | 1 | Each Job | 8,850 ₹8,850 Lowest | 80,000 ₹80,000 |
| 2.00 | Provision of "back feed" with auto function & Integration of ACB 4 pole 1000 Amps-02 Nos in MAFI PS-I VCB 3 pole 630 Amps electrically and mechanically operated -12 Nos (MAFI PS-I- 06 Nos & MAFI PS-II- 06 Nos) to suit emergency power feed up to MAFI PS-2 including selection & supply of various control cable, laying, termination, testing in complete with conformance to interlock suitability for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge. | 1 | Each Job | 4,48,500 ₹4,48,500 | 3,10,000 ₹3,10,000 Lowest |
| 3.00 | Provision of Interlocks (Only) to limit the auto ops in existing ACB4 pole 1000 Amps-02 Nos in MAFI PS-I VCB 3 pole 630 Amps electrically and mechanically operated -12 Nos (MAFI PS-I- 06 Nos & MAFI PS-II- 06 Nos) to suit emergency power feed up to MAFI PS-2 with selection of various control cable including laying, termination, testing for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge.
Note: Interlocking system contain PLC controlled breakers of HT Incomer VCB and LT commercial ACB along with two numbers DG incomer ACBs will be interlocked electrically so that operations of these breakers will occur only one at a time. This interlocks will protect the supply collision in system failure/malfunctioning.
1. UV coils of ACB’s and trip circuit of VCB will be interlocked to avoid force full manual operation.
2. Breaker closing circuits will be interlocked electrically so that only one breaker will operate at a time. | 1 | Each Job | 6,19,500 ₹6,19,500 | 6,10,000 ₹6,10,000 Lowest |
| 4.00 | Development/installation/testing of PLC software for monitoring & control of 7 VCB's,(06 Nos at PS-I and 01 Nos at MRS) ACB's, 750 KVA DG (02 Nos) operations at PS-1 to have emergency power feed up to MAFI PS-2 automatically by use of control over existing switchgear for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge.
Note: Programming software details, make and validity
1. PLC Programming software : CX-Programmer
2. Make : Omron
3. Version : Version 9.7 or Higher
4. License Validity : Life time Validity
5. HMI Programming software : NB Designer
6. Make : Omron
7. Version : Version 1.7 or Higher
8. License Validity : Life time Validity | 1 | Each Job | 7,08,000 ₹7,08,000 Lowest | 7,45,000 ₹7,45,000 |
| 5.00 | Testing, decommissioning & re-commissioning of existing MAFI-1 PS transformer- 02 Nos,(630 KVA -01 Nos in MAFI PS-I & 200 KVA-01 Nos in MAFI PS-II) VCB’s 14 Nos 630 Amps (total 12 Nos at PS-I & II and 02 Nos at MRS), ACB’s 1000 Amps 4 pole of both substations including rearrangement (if required) in terms of position / place to suit updated power flow arrangement complete all as specified and directed by Engr-in-charge. | 1 | Each Job | 6,19,500 ₹6,19,500 Lowest | 11,60,000 ₹11,60,000 |
| 6.00 | Development of scheme wirings / scheme diagrams/cable schedule for each station to suit integration program and preparation / conduct of scheme test protocolscomplete all as specified and directed.
Note: Contractor should submit Schematic diagram for this project in hard copy as well as in soft copy to authorized officials and one copy will be displayed at the project site. | 1 | Each Job | 3,54,000 ₹3,54,000 | 2,85,000 ₹2,85,000 Lowest |
| 7.00 | Health Check & Repair functions for transformer- 02 Nos,(630 KVA -01 Nos in MAFI PS-I & 200 KVA-01 Nos in MAFI PS-II) 11 KV VCB's 14 Nos (total 12 Nos at PS-I & II and 02 at MRS) , Interconnection Cabling tests and termination, 1000 Amps ACB's, bus coupler's including addition of remote control facility, U/V facility, Enhancement of aux contacts (if required) with extension of control wiring within equipment in complete to suit Original MAFI Concept complete all as specified and directed.
Note : Health check should be as follow
A. Inspection for abnormal temperature variation and cooling system of T/F.
B. Check against transformer oil level/ temperature. Top up with dry oil, if necessary.
C. Check T/F for any oil leakage from bushings, breathers etc.
D. Check for any abnormal sound or excessive chattering. If any investigate and repair.
E. Examine relays and alarm contacts and their operation, fuses etc. Check for relays functioning clean or
replace the contacts.
F. Earth resistance measurement of the (a) T/F body, neutral and other body parts.
G. Oil test for dielectric strength, Dehydrate or replace the oil, if necessary.
H. In case of fan & pump cooled T/F, Lubricate all bearings, check gear box. Examine Contacts, Check
Manual control and interlocks. Replace burnt or worn out contacts or other parts.
J. Insulation resistance comparison in 70 degree temperature with the initial values available at
commissioning time.
K. Check and arrest leakage/seepage of oil from main tank to OLTC tank
L. Check for proper earthing of transformer body top cover with main body to reduce eddy current loss.
M. After completion of the project the contractor shall have to arrange training to the officials/ persons/operators available at site without any extra cost to the depot. A certificate in this respect shall be provided against the said training to 08 personals of MES/User rep. | 1 | Each Job | 4,90,000 ₹4,90,000 Lowest | 12,00,000 ₹12,00,000 |
| 8.00 | Excavating in Trenches not exc. 1.50 mtr wide and not exc. 1.50 mtr in depth, Taking Out and Laying of Cables, etc. and getting out in Soft/ Loose Soil, complete all as specified and as directed. | 664.2 | CUM | 650 ₹4,31,730 | 250 ₹1,66,050 Lowest |
| 9.00 | Returning, Filling in, including Spreading, Levelling, Watering and Well Ramming in Layers not exc. 250mm in Soft/Loose Soil, complete all as specified and as directed. | 495.75 | CUM | 120 ₹59,490 | 100 ₹49,575 Lowest |
Tender Value
₹68.3 L
EMD Value
₹1.3 L
Closing Date
24 Mar 2026, 6:00 pmClosed
CWE AF Borjhar
HQ CWE AF Borjhar Military Engineer Services PO Airport Borjhar Guwahati Assam 781015 Tele 0361 2841626
PROVN OF BACK FEED FOR POWER RING AND SPECIAL REPAIR/REPLACEMENT OF HT CABLE AND CONNECTING ACCESSORIES OF HT POWER RING AT AF STN TEZPUR
2026_MES_753996_1
9114 CWE(AF)/TEZ/ 2025-2026
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Tezpur
As per tender documents.
8 documents required · 8 mandatory
₹1,000
GE (AF) Tezpur
₹1.3 L
Yes
5 Jun 2026
24 Feb 2026
26 Mar 2026
24 Feb 2026
24 Mar 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | SCHEDULE 'A' PART-I (B/R PORTION) | - | - | - | - |
| 1 | Carry out Site inspection and Survey to MAFI- PS-I and MAFI- PS-II including to and from and loading boarding of equipment required to carryout works of "back feed" system at AF Station Tezpur. | 1 | Each Job | - | - |
| 2 | Provision of "back feed" with auto function & Integration of ACB 4 pole 1000 Amps-02 Nos in MAFI PS-I VCB 3 pole 630 Amps electrically and mechanically operated -12 Nos (MAFI PS-I- 06 Nos & MAFI PS-II- 06 Nos) to suit emergency power feed up to MAFI PS-2 including selection & supply of various control cable, laying, termination, testing in complete with conformance to interlock suitability for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge. | 1 | Each Job | - | - |
| 3 | Provision of Interlocks (Only) to limit the auto ops in existing ACB4 pole 1000 Amps-02 Nos in MAFI PS-I VCB 3 pole 630 Amps electrically and mechanically operated -12 Nos (MAFI PS-I- 06 Nos & MAFI PS-II- 06 Nos) to suit emergency power feed up to MAFI PS-2 with selection of various control cable including laying, termination, testing for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge.
Note: Interlocking system contain PLC controlled breakers of HT Incomer VCB and LT commercial ACB along with two numbers DG incomer ACBs will be interlocked electrically so that operations of these breakers will occur only one at a time. This interlocks will protect the supply collision in system failure/malfunctioning.
1. UV coils of ACB’s and trip circuit of VCB will be interlocked to avoid force full manual operation.
2. Breaker closing circuits will be interlocked electrically so that only one breaker will operate at a time. | 1 | Each Job | - | - |
| 4 | Development/installation/testing of PLC software for monitoring & control of 7 VCB's,(06 Nos at PS-I and 01 Nos at MRS) ACB's, 750 KVA DG (02 Nos) operations at PS-1 to have emergency power feed up to MAFI PS-2 automatically by use of control over existing switchgear for Normal & CATII modes of operation for specific direction of power feeds complete all as specified and directed by Engr-in-charge.
Note: Programming software details, make and validity
1. PLC Programming software : CX-Programmer
2. Make : Omron
3. Version : Version 9.7 or Higher
4. License Validity : Life time Validity
5. HMI Programming software : NB Designer
6. Make : Omron
7. Version : Version 1.7 or Higher
8. License Validity : Life time Validity | 1 | Each Job | - | - |
| 5 | Testing, decommissioning & re-commissioning of existing MAFI-1 PS transformer- 02 Nos,(630 KVA -01 Nos in MAFI PS-I & 200 KVA-01 Nos in MAFI PS-II) VCB’s 14 Nos 630 Amps (total 12 Nos at PS-I & II and 02 Nos at MRS), ACB’s 1000 Amps 4 pole of both substations including rearrangement (if required) in terms of position / place to suit updated power flow arrangement complete all as specified and directed by Engr-in-charge. | 1 | Each Job | - | - |
| 6 | Development of scheme wirings / scheme diagrams/cable schedule for each station to suit integration program and preparation / conduct of scheme test protocolscomplete all as specified and directed.
Note: Contractor should submit Schematic diagram for this project in hard copy as well as in soft copy to authorized officials and one copy will be displayed at the project site. | 1 | Each Job | - | - |
| 7 | Health Check & Repair functions for transformer- 02 Nos,(630 KVA -01 Nos in MAFI PS-I & 200 KVA-01 Nos in MAFI PS-II) 11 KV VCB's 14 Nos (total 12 Nos at PS-I & II and 02 at MRS) , Interconnection Cabling tests and termination, 1000 Amps ACB's, bus coupler's including addition of remote control facility, U/V facility, Enhancement of aux contacts (if required) with extension of control wiring within equipment in complete to suit Original MAFI Concept complete all as specified and directed.
Note : Health check should be as follow
A. Inspection for abnormal temperature variation and cooling system of T/F.
B. Check against transformer oil level/ temperature. Top up with dry oil, if necessary.
C. Check T/F for any oil leakage from bushings, breathers etc.
D. Check for any abnormal sound or excessive chattering. If any investigate and repair.
E. Examine relays and alarm contacts and their operation, fuses etc. Check for relays functioning clean or
replace the contacts.
F. Earth resistance measurement of the (a) T/F body, neutral and other body parts.
G. Oil test for dielectric strength, Dehydrate or replace the oil, if necessary.
H. In case of fan & pump cooled T/F, Lubricate all bearings, check gear box. Examine Contacts, Check
Manual control and interlocks. Replace burnt or worn out contacts or other parts.
J. Insulation resistance comparison in 70 degree temperature with the initial values available at
commissioning time.
K. Check and arrest leakage/seepage of oil from main tank to OLTC tank
L. Check for proper earthing of transformer body top cover with main body to reduce eddy current loss.
M. After completion of the project the contractor shall have to arrange training to the officials/ persons/operators available at site without any extra cost to the depot. A certificate in this respect shall be provided against the said training to 08 personals of MES/User rep. | 1 | Each Job | - | - |
| 8 | Excavating in Trenches not exc. 1.50 mtr wide and not exc. 1.50 mtr in depth, Taking Out and Laying of Cables, etc. and getting out in Soft/ Loose Soil, complete all as specified and as directed. | 664.2 | CUM | - | - |
| 9 | Returning, Filling in, including Spreading, Levelling, Watering and Well Ramming in Layers not exc. 250mm in Soft/Loose Soil, complete all as specified and as directed. | 495.75 | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_844526.xls
BOQ • 0.94 MB
9114tender.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .