Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC Order is placed | |
| 2 | L2₹7.8 L+₹1.0 L (15.0%)Rejected-Finance | L2 | Rejected-Finance L2 Hence rejected | |
| 3 | L3₹10.3 L+₹3.5 L (51.0%)Rejected-Finance PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | L3 | Rejected-Finance L3 Hence rejected. | |
| 4 | L4₹13.2 L+₹6.3 L (92.6%)Rejected-Finance TP 479 KULANGARAYIL THODIYOOR NORTH P O VENGARA KARUNAGAPALLY KOLLAM 690 523 | KARUNAGAPALLY | KOLLAM | KERALA | 690523 | L4 | Rejected-Finance L4 Hence rejected. |
Tender Value
₹8 L
EMD Value
₹20,000
Closing Date
14 Jul 2021, 2:30 pmClosed
MD, MRCMPU Ltd.
MD, MRCMPU Ltd., Peringolam P.O., Kunnamangalam, Kozhikode -673571
Supply, erection, testing and commissioning of pipelines for steam, water and air utilities including accessories for the expansion of Peda/Palada production plant at Wayanad Dairy, Kalpetta
2021_KCMMF_427206_1
MRU/ENGG/WYD_OT-PIPE/2021-22
Open Tender
Miscellaneous Works
Item Wise
45 days
Wayanad Dairy
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,600
Yes
₹20,000
Yes
21 Sept 2021
24 Jun 2021
15 Jul 2021
24 Jun 2021
14 Jul 2021
24 Jun 2021
Steam line erection
Supply and erection of Non IBR Steam lines-MS pipes Class 'C' (Heavy) 'ERW' quality as per IS 1239 (Rate should be inclusive of same quality bends, tees, reducers, MS flanges #150, gaskets, bolts, nuts, etc, wherever necessary)(Tata/Jindal make)
Fixing of Piston Valves for Steam lines, Flanged/Screwed, #150 (NON IBR) ((Forbes Marshall/Steamlok make)
100 NB (Flanged)
80 NB (Flanged)
65 NB (Flanged)
50 NB (Flanged)
15 NB (Screwed)
Fixing of Pneumatically Operated PID controlled Pressure Reducing Valve, 65NB with Condensate Pot, Pressure Transmitter and Controller. Make: Forbes Marshall/Steamlok. End Connection: Flanged #150, NIBR Steam Flow: 1200 kg/hr Steam inlet pr: 4 barg Steam outlet pr: 2.5 barg
Fixing of Y- Type Strainer, 80NB Make: Forbes Marshall/Steamlok. End Connection: Flanged # 150, NIBR
Fixing of Non IBR approved Steam Trap Assembly Consisting of Piston Valves : 2 Nos. (inlet and Bypass), Thermodynamic Steam Trap:1 No. & Interconnecting Pipes, End Connections: Flanged #150, Size 15 NB (Forbes Marshall/Steamlok make)
Fixing of 15NB Air vent (Forbes Marshall/Steamlok make)End Connection: Screwed BSPT, Non IBR
Fixing of Safety Valve Make: Aira Pressure Setting: 3 barg End Connection: Screwed BSPT, NonIBR
Fixing of Ball valve, 25NB Make: Aira / Unison MOC: SS304, Medium: Steam End Connection: Screwed BSPT, NonIBR
Fixing of Pressure guage with Syphon Dial Size: 100 MM, Range: 0-6 barg End Connection: Screwed BSPT, 15NB
Supply, Fabrication and fixing of pre fabricated compressed pipe section thermal insulation (min. 60kg/m3 density) and clading with 26SWG SS sheet for steam lines.
Removing and re-fixing of Steam mixing battery, 20 NB
Water line and air line erection
GI coated IS 1161-1968 Medium thick Steel Pipe including all fittings such as bend,tees,fanges, consumables for cutting, welding consumables for water and air lines
Cast Steel Ball Valves for feed water line and air line
Supply, Fabrication and erection of structural supports/ platforms for Steam lines and Water lines and welding consumables and painting .
HIND ERECTORS
ESSEN ENGINEERING WORKS
Devi Engineering Works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .