Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | luis construction L1 |
|---|---|---|---|---|
| 1.01 | Earthwork in excavation by mechanical means (hydraulic excavator) /manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m on plan) including dressing of sides and ramming of bottomS, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.
a) All kinds of soil | 484 | cum | 180.8 ₹87,507.2 Lowest |
| 1.02 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 37 | cum | 1,300.41 ₹48,115.17 Lowest |
| 1.03 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basaltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in:
All Works upto plinth level | 168 | cum | 5,740 ₹9,64,320 Lowest |
| 1.04 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basaltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in:
In retaining walls, return wall (any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 270 | cum | 6,162 ₹16,63,740 Lowest |
| 1.05 | Centering and shuttering including struttings, propping etc. and removal of formwork for:
a) Foundations, footings, bases for columns and mass concrete. | 198 | Sqmts | 250.6 ₹49,618.8 Lowest |
| 1.06 | Centering and shuttering including struttings, propping etc. and removal of formwork for:
Vertical surfaces such as retaining walls, return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets etc. | 484 | Sqmts | 278.2 ₹1,34,648.8 Lowest |
| 1.07 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge.
110 mm dia | 65 | Rmt | 290.96 ₹18,912.4 Lowest |
Tender Value
₹43.8 L
EMD Value
₹87,522
Closing Date
25 Nov 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Construction of Protection Wall for nallah in Survey No. 67/4 at Codal, Karapur of Village Panchayat Karapur Sarvan in Bicholim Taluka.
2025_WRD_26300_1
WRD/WDVI/PB/F.30/TN e 35/2025-26/698 line 3 Dated 12/11
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹87,522
23 Jan 2026
14 Nov 2025
26 Nov 2025
14 Nov 2025
25 Nov 2025
14 Nov 2025
Earthwork in excavation by mechanical means (hydraulic excavator) /manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m on plan) including dressing of sides and ramming of bottomS, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basaltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in: All Works upto plinth level
Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basaltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in: In retaining walls, return wall (any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Centering and shuttering including struttings, propping etc. and removal of formwork for: a) Foundations, footings, bases for columns and mass concrete.
Centering and shuttering including struttings, propping etc. and removal of formwork for: Vertical surfaces such as retaining walls, return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets etc.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. 110 mm dia
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.10 MB
BOQ_26749.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .