Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-AOC DASPARA HABITATION OMPI NAGAR VILLAGE COUNCIL OMPI BAC GOMATI TRIPURA | OMPI | GOMATI | TRIPURA | ₹3.6 L | 1 | Accepted-AOC AOC |
| 2 | 2₹3.7 L+₹10,999 (3.06%)Rejected-Finance CHAINAITHANI USHABAZAR AIRPORT ROAD AGARTALA WEST TRIPURA PINCODE 799009 | AGARTALA | WEST TRIPURA | TRIPURA | 799009 | ₹3.7 L+₹10,999 (3.06%) | 2 | Rejected-Finance L2 |
| 3 | 3₹3.8 L+₹23,519 (6.54%)Rejected-Finance | ₹3.8 L+₹23,519 (6.54%) | 3 | Rejected-Finance L1 |
| 4 | 4₹4.3 L+₹72,619 (20.2%)Rejected-Finance VILL NORTH BRAJAPUR GRAM PANCHAYET P O BRAJAPUR P S CHARILAM DIST SEPAHIJALA TRIPURA | SEPAHIJALA | TRIPURA | ₹4.3 L+₹72,619 (20.2%) | 4 | Rejected-Finance L4 |
Tender Value
₹4.9 L
EMD Value
₹9,820
Closing Date
8 Jun 2026, 3:00 pmClosed
The Executive Engineer,Samagra Shiksha
o/o The Executive Engineer,Samagra Shiksha
Construction of Kitchen cum store at Silchara English Medium SB School, karbook, Gomati District under PM-POSHAN for the year 2025-26/2nd Call
2026_OSDDS_73324_1
07/EE/ENGG.CELL/SAMAGRA/26-27
Open Tender
Civil Works
Percentage
45 days
Karbook Block, Gomati District
Please refer Tender Documents
6 documents required · 6 mandatory
₹1,000
₹9,820
29 Jul 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in
depth, 1.5m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto
1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | 1 | Cum | 179.9 | ₹179.72 |
| 2 | Filling available excavated earth (excluding rock) in trenches,
plinth, sides of foundations etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 1 | Cum | 161.3 | ₹161.14 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with
sand (fine) from local quarry with all lifts including spreading in
horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | 1 | Cum | 9,295.7 | ₹9,286.4 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | Cum | 11,080.4 | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-1:2:4( 1 Cement: 2 fine sand :4 graded well burnt brick
aggregate 20 mm nominal size) | - | Cum | 12,591.1 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level
excluding the cost of centring, shuttering, finishing and
reinforcement-Lintels, beams, plinth beams, girders, bressumers and
cantilevers with wooden plank | - | sqm | 391 | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-Chajja | - | sqm | 531.3 | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 0.8 | Kg | 103.9 | ₹83.12 |
| 10 | First class brick work in foundation and plinth including cost of all materials as required complete: cement mortar (1:4) | 1 | Cum | 9,845.2 | ₹9,835.35 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74620.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
DNIeT.pdf
Tender Documents • 2.56 MB
BOQ_74620.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .