| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC CHOOTENI KAYYUR | ₹8.3 L | L1 | Accepted-AOC LOWEST RATE QUOTED |
| 2 | L2₹9.3 LRejected-AOC CHEKIDAPURATH HOUSE DOWNHILL | ₹9.3 L | L2 | Rejected-AOC HIGHEST RATE QUOTED |
| 3 | L3₹10.2 LRejected-Finance | ₹10.2 L | L3 | Rejected-Finance QUOTED HIGHEST RATE |
Tender Value
₹9.0 L
EMD Value
₹22,500
Closing Date
11 Mar 2026, 5:00 pmClosed
Executive Engineer,PMU Kasaragod
Office of Executive Engineer, Project Management Unit, KSEB Ltd, Kasaragod-671123
INSERTION OF HT POLES FOR SAFETY IN CHEEMENI FEEDER UNDER ELECTRICAL SECTION, KAYYUR
2026_KSEB_838992_1
21/25-26//EE/PMU/KSD dtd 21-02-2026
Open Tender
Electrical Works
90 days
Kayyur
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,124
₹22,500
19 May 2026
21 Feb 2026
13 Mar 2026
23 Feb 2026
11 Mar 2026
25 Feb 2026
23 Feb 2026 - 11 Mar 2026
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km)
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.
Renewing one 1.8m Channel cross arm on the 11kV Pole including dismantling and conveyance.
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Dismantling one section fuse from structure and bringing back to section store.
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite.
Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Insertion of one HT A type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1413501.xls
BOQ • 0.27 MB
TenderDocument.pdf
Tender Documents • 0.40 MB
BIDDERDETAILS.pdf
Other Document • 0.07 MB
Download all tender documents and submit your bid