| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC Below Rate |
| 2 | L2₹3.6 LRejected-AOC NO 21B VAIYAPURI NAGAR 2ND CROSS KARUR | KARUR | KARUR | TAMIL NADU | 639002 | ₹3.6 L | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | SRI KRISHNA TRADERS L2 | NALLUSAMY P L1 |
|---|---|---|---|---|---|
| 1.00 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete. | 50 | Hrs | 918 ₹45,900 | 909 ₹45,450 |
| 2.00 | Towards the Cost Hire charges for engaged 7.5Hp Oil Engine for bailing out Sewage Water including cost of fuel Charges, Loading & Unloading Charges and other incidental charges etc., complete as directed by departmental Officers . | 26 | Hrs | 444 ₹11,544 | 439 ₹11,414 |
| 3.00Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | |||||
| 4.00 | First 2.40 m | 109 | M3 | 371 ₹40,439 | 367 ₹40,003 |
| 5.00 | Second 1 m | 28 | M3 | 546 ₹15,288 | 541 ₹15,148 |
| 6.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 97 | M2 | 1,094 ₹1.1 L | 1,082 ₹1.0 L |
| 7.00 | Removing the burst R.C.C. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete. (excluding cost of sound pipe and jointing materials and earth work) | 15 | Nos | 4,159 ₹62,385 | 4,117 ₹61,755 |
| 8.00Supplying and fixing GI / UPVC / PVC specials of approved quality and brand including all labour and material charges etc., complete | |||||
| 9.00 | 250 mm PVC Pipe (10 Ksc) | 30 | Rm | 1,070 ₹32,100 | 1,059 ₹31,770 |
| 10.00 | 250 MM Coupling | 6 | Nos | 322 ₹1,932 | 319 ₹1,914 |
Tender Value
₹4.3 L
EMD Value
₹4,300
Closing Date
18 Feb 2026, 3:00 pmClosed
Commissioner,Karur City MInicipal Corporation
Azad road
Desilting Rettai Vaikkal Canel from Rathinam Salai to Railway Road using Necessary earth Restoration and Maintenance Work for Existing UGD Pipe Line and Manhole at Muthunagar near Thinnappatheatre Number N6 AD 20-21 Ward 24 in KCMC
2026_MAWS_658475_2
E1/330/2026
Open Tender
Civil Works
KCMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,300
1 May 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete.
Towards the Cost Hire charges for engaged 7.5Hp Oil Engine for bailing out Sewage Water including cost of fuel Charges, Loading & Unloading Charges and other incidental charges etc., complete as directed by departmental Officers .
Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.
First 2.40 m
Second 1 m
Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Removing the burst R.C.C. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete. (excluding cost of sound pipe and jointing materials and earth work)
Supplying and fixing GI / UPVC / PVC specials of approved quality and brand including all labour and material charges etc., complete
250 mm PVC Pipe (10 Ksc)
250 MM Coupling
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling with excavated sand complying with standard specification for filling in foundation and basement.
Providing dummies the upstream and downstream manholes to arrest the flow of sewage in to the dilapidated manhole and dismantling and removing the dummies with necessary safety measures at depth of 4m using air compressor, generator and engaged manpower including all hire charges and labour cost etc, complete as instructed by departmental officers
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_790179.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid