Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.4 L+₹1.4 L (46.9%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹4.5 L+₹1.5 L (50.6%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹4.6 L+₹1.6 L (52.7%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.5 L
EMD Value
₹5,000
Closing Date
30 Apr 2022, 12:00 pmClosed
SE, EDC, Rampur
Office of the SE, EDC, Rampur
09/2022-23(EDCR) For the work of shifting 33/11 kv s/s civil lines Rampur incoming and out going panels old building to new building under EDD-I, Rampur
2022_PVVNL_691306_1
09/2022-23(EDCR)
Open Tender
Electrical Works
Lump-sum
45 days
Office of the SE, EDC
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE, EDC, Rampur
₹5,000
6 Sept 2022
21 Apr 2022
30 Apr 2022
21 Apr 2022
30 Apr 2022
21 Apr 2022
Amount
Carriage of the following material from Store Centre, Rampur to work site and site to store including loading & unloading.
11 KV 3x300 sq mm XLPE Cable
11 KV 3X 185 Sq mm XLPE Cable
Cable Jointing Kit 3X 300 Indoor
Cable Jointing Kit 3X 185 Indoor
Control Cable 2X2.5 mm
Control Cable 4X2.5 mm
Control Cable 6X2.5 mm
11 KV 3x300 sq mm XLPE Cable(Site to Strore)
11 KV 3x185 sq mm XLPE Cable(Site to Strore)
Control Cable 2X2.5 mm(Site to Strore)
Control Cable 4X2.5 mm(Site to Strore)
Control Cable 6X2.5 mm(Site to Strore)
Dismantling and Shifting of Incoming panel making with connection as per RESPO Norms and as per direction of Supervising Engineer.
Dismantling and Shifting of outgoing panel making with connection as per RESPO Norms and as per direction of Supervising Engineer.
Dismantling and Shifting of 33 KV Control Panel making with connection as per RESPO Norms and as per direction of Supervising Engineer.
Dismantling and shifting of Jarjar Scrape Capacitor Bank
Dismantling of Bettery Charger
Laying, sagging, stringing and binding 11 KV Cable Including of Cost of Sand and Bricks as per RESPO Norms and as per direction of Supervising Engineer.
Laying, of Control Cable and making connection with VCB/ CT/TF etc. as per RESPO Norms and as per direction of Supervising Engineer.
Earthing of all equipment with providing G I Strip
Fixing of Cable Box
Laying ,stringing and binding of 11 KV XLPE Cable of size 3x300sq.mm. with the help of cable jointing kit as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of 11 KV XLPE Cable of size 3x185sq.mm.with the help of cable jointing kit as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of Control Cable of size 2x2.5sq.mm. as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of Control Cable of size 4x2.5sq.mm. as per RESPO Norms and as per direction of Supervising Engineer.
Laying ,stringing and binding of Control Cable of size 6x2.5sq.mm. as per RESPO Norms and as per direction of Supervising Engineer.
Krishna Electricals
M/s Navyug Traders
munfad electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .