Tender Value
Refer Docs
EMD Value
₹53 L
Closing Date
15 May 2026, 6:04 pmClosed
ADDL. CITY ENGINEER (Roshni)
Two Year Rate Contract for SITC of Grid-connected rooftop solar power plant System on RMC buildings. (Re-tender)
300438
RMC/Roshni/Solar/2026-27
Open
Solar Street Lights-Goods
Works
Rajkot
15 documents required · 15 mandatory
₹23,500
Rajkot Municipal Corporation
₹53 L
1 May 2026
1 May 2026
1 May 2026
15 May 2026
1 May 2026
Additional City Engineer
Roshni (Lighting) Department
Rajkot Municipal Corporation
Central zone office
DR. Ambedkar Bhavan
Room No.08, 2nd Floor, Dhebar Road,
RMC/ROSHNI/SOLAR/2026 Page 1 of
Sr. no. Particulars Page no.
1 Notice inviting Tender
2 Eligibility Criteria
3 Instructions to bidders
4 Scope of work
5 General Conditions of Contract
6 Technical Specifications
7 Scope of work for O & M
8 Reference Standards
9 Important note for price bid
M 10 Schedule - A:
Design SITC & 10 year O&M Work
Operation, Preventive Maintenance & Service.
12 Technical Formats (to be submitted by bidder)
RMC/ROSHNI/SOLAR/2026 Page 2 of
E-Tender - Notice Inviting Tender
The E-Tenders are invited with two bid system basis by RAJKOT MUNICIPAL CORPORATION, Rajkot from
competent Contractor/Manufacturers for the work of Two year Rate Contract for Supply, Installation,
Testing and Commissioning of Grid-connected rooftop solar power plant System on RMC buildings with
related comprehensive Electrical, Mechanical & Civil Work including all necessary equipment with
(Ten) years comprehensive O&M and Operation & Maintenance of RMC existing solar Plant.
a) Estimated cost (Without
Sr. GST) is Rs.
No. b) EMD @ 1% in Rs.
work c) E-TENDER fee in Rs.
Two Year Rate Contract for SITC of Grid-connected a) Rs.53,00,00,000/-
rooftop solar power plant System on RMC
buildings.(Re-tender) c) Rs.23,500/-
No. Event Description Mile Stone Date
M 1 Downloading of e-Tender documents Dt.:01/05/2026 to Dt.: 15/05/2026
Dt. 07/05/2026 at 11:30 hrs. Onwards
Pre-bid meeting in the O/o Addi. City Bidders shall have to post their queries
Engineer at RMC Central Zone Office. (if any) on e-mails [email protected]
2 on before Dt. 07/05/2026 up to 10:00
3 Last Date of Online submission of e – Tender Dt.: 15/05/2026 up to 18:00 hrs.
Submission of EMD, Tender fee as per
financial criteria by Speed post only
Verification of submitted documents (EMD,
5 Dt.: 22/05/2026 at 10:30 hrs. onwards
e – Tender fee, etc.)
6 Opening of online Tech Bid (If possible) Dt.: 22/05/2026 at 10:30 hrs. onwards
7 Opening of Price Bid (If possible) Dt.: 25/05/2026 at 10:30 hrs. onwards
8 Bid Validity 180 days
1.1 If the EMD of Rs.53,00,000/- and the non-refundable TF of Rs.23,500/- are paid via Demand
Draft/Online in favor of the Rajkot Municipal Corporation, Rajkot, from any Nationalized
Bank or as per Finance Department GR No. FD/MSM/e-file/4/2023/4020/DMO, dated
RMC/ROSHNI/SOLAR/2026 Page 3 of
11/03/2024, the physical DD must be submitted within the specified tender timeline.
However, for online payments via NEFT/RTGS to ICICI Bank Account No. 015305010638 (IFSC
Code: ICIC0000153), only the payment receipt needs to be uploaded online along with the
required tender documents, eliminating the need for physical submission.
Additional City Engineer
Roshni Department
Room No.8-B, Dr. Ambedakar Bhavan
Central Zone Office, Dhebar Road,
Rajkot Municipal Corporation
The bidder also can pay EMD and Tender fee by NEFT/RTGS or Online Transfer.
RMC BANK ACCOUNT DETAILS
A/C Name: Rajkot Municipal Corporation
A/C No.: 015305010638 Bank Name: ICICI Bank
IFS Code: ICIC0000153 Branch: Jay Hind Press
1.2 The bidder must have experience of a similar nature of work (SITC of Solar plant and
comprehensive O&M.) in the Govt. and/or Semi Govt. Departments, as below,
M 1.2.1 Experience in successfully completing or substantially completing at least one contract of
similar nature of work of at least 40 percent of the value of proposed contract within the last
1.2.2 Substantially completed works means those works which are at least 90% completed as on
the date of submission (i.e, gross value of work done up to the last date of submission is 90%
or more of the original contract price) and continuing satisfactorily.
1.3 Bidders must submit the authorization certificate from the manufacturer of the Solar PV
1.4 The bidder must have achieved a minimum annual turnover of Rs.53,00,00,000/- in any one
year over the last seven financial years. The enhancement factor will be considered for the
calculation of turnover as per RMC norms. The bidder must submit the CA certified Turnover
Certificate for the last seven years.
1.5 Due to inflation the value of rupees is decrease with increase in inflation so it is proposed to
adopt enhance factor as shown in following table for yr. to each yr. to arrive at current
financial year.
RMC/ROSHNI/SOLAR/2026 Page 4 of
Sr. No. Year Enhancement Factor
1 Year of inviting tender (E.g.2025-26)
1.6 A joint venture is not allowed for this project.
1.7 Available bid Capacity:-
● ABC must be more than the tender amount.
● ABC is Calculated as ABC=2*A*N-B
● A- Maximum value of works executed in any one year during the last seven year (updated
to......... price level) taking into account the completed as well as works in progress.
● N- Number of years prescribed for completion of the works for which tender are invited.
● B- Value ("price level) of exiting commitments and on-going work to be completed during
that next N - year (period of completion of the works for which the tender are invited).
M 1.8 The bidder must be registered as an Electrical contractor with any state government or
central government (Registration must be updated up to the year 2025-26).
1.9 The bidder must be registered in A-class of registration with any state government or central
government (Registration must be updated up to the year 2025-26).
1.10 The bidder must submit the fresh bank Solvency Certificate of Rs. 9,27,50,000/-.
1.11 The bidder must submit a copy of PAN registration.
1.12 Declaration To be submitted on Non-Judicial Stamp Paper of Rs.300/- for NOT BLACK LISTED
OR TERMINATED OR DEBARRED in any States, CPWD/ MES / Railways or any Government,
Semi-Government or private body. Also, no complaint is lodged against the Firm / Company,
as per Appendix 10 of this tender document.
1.13 The bidder must submit a copy of the valid GST registration.
1.14 The bidder must submit a copy of the valid PF & ESIC (Employees' State Insurance Scheme)
1.15 This tender operates under a two year rate contract. The selected agency will receive work
orders based on prior approvals and funds availability. Therefore, there is a possibility of
increase or decrease in the work compared to the tender estimate amount. Which will
have to be accepted by the tendering agency. Any future objections/claims by the agency
RMC/ROSHNI/SOLAR/2026 Page 5 of
regarding this will be invalid and non-binding on the Rajkot Municipal Corporation.
1.16 The bidder must submit a copy of the Memorandum of Association or Partnership Deed, as
the case may be.
1.17 The conditional tender shall not be accepted and will be rejected.
1.18 Acceptance of the tenders will rest with the commissioner, RAJKOT MUNICIPAL
CORPORATION, Rajkot, who does not bind himself to accept the lowest tender and reserves
the right to reject any or all tenders without assigning any reason thereof.
1.19 For any legal matter/disputes, the jurisdiction will be Rajkot only.
1.20 All the Tender documents /bid documents /Amendments /Corrigendum /Addenda/
copies /supporting documents must be self-certified/signed with a stamp on every page by
If a Tenderer finds discrepancies, or omission from the specifications or other documents or any
information or should be in doubt as to their meaning, he should query to the Deputy Executive
Engineer (Electrical), mail the queries at mail ID: [email protected] on or before the date of
pre-bid meeting. Any queries received after the date of pre-bid meeting shall not be entertained.
The result of interpretation of the eTENDER will be issued to all Tenderers as addendum.
E-tender shall duly complete in all respects shall be submitted online and one set of tender
documents including Amendments/corrigendum/addenda/copies if any, and other documents as
required in this tender, duly stamped & signed in all pages shall be submitted online only.
Submission of physical receipt of TF and EMD at the following address by Speed post on the date
and time mentioned in the tender notice.(if Tender Fee and EMD paid offline).
M Additional City Engineer
Roshni (Lighting) Department
Rajkot Municipal Corporation
Central zone office
DR. Ambedkar Bhavan
Room No.08, 2nd Floor, Dhebarbhai road
The last date of downloading of e-tender is Dt.:15/05/2026 up to 18:00 Hrs.Tender Document can be
downloaded from website https://rmc.nprocure.com and http://www.rmc.gov.in
If any tender documents are received after the specified last date and time of the submission, all such
tender documents will be rejected based on late submission without any other reasons assigned
I/C Additional City Engineer
Roshni Department
Rajkot Municipal Corporation
RMC/ROSHNI/SOLAR/2026 Page 6 of
ELIGIBILITY CRITERIA FOR THE BIDDERS:
2.1 If the bidder submits an offline Demand Draft of Tender Fee and Earnest Money Deposit
(EMD) in the name of "Rajkot Municipal Corporation" payable at Rajkot then must submit
with the physical submission of the tender documents. else paid online via NEFT/RTGS, only
the payment receipt needs to be uploaded with the tender documents; no physical Demand
Draft submission is required.
2.2 The bidder must have experience of a similar nature of work (SITC of Solar plant and
comprehensive O&M.) in the Govt. and/or Semi Govt. Departments. as below,
2.2.1 Experience in successfully completing or substantially completing at least one contract of
similar nature of work of at least 40 percent of the value of proposed contract within the
last seven years.(i.e. Rs.21,20,00,000/-)
2.2.2 Substantially completed works means those works which are at least 90% completed as on
the date of submission (i.e, gross value of work done up to the last date of submission is
90% or more of the original contract price) and continuing satisfactorily.
2.3 Bidders must submit the authorization certificate from the manufacturer of the Solar PV
Module. At the time of physical verification, the bidder must show all these original
documents, failing which the bid will be rejected.
2.4 The bidder must have achieved a minimum annual turnover of Rs.53,00,00,000/- in any one
year over the last seven financial years. The enhancement factor will be considered for the
calculation of turnover as per RMC norms. The bidder must submit the CA certified Turnover
Certificate for the last seven years.
A joint venture is not allowed for this project.
2.6 The bidder must be registered as an Electrical contractor with any state government or
central government.
2.7 The bidder must submit the fresh bank Solvency Certificate of Rs. 9,27,50,000/-.
2.8 The bidder must submit a copy of PAN registration.
2.9 Declaration To be submitted on Non-Judicial Stamp Paper of Rs.300/- for NOT BLACK LISTED
OR TERMINATED OR DEBARRED in any States, CPWD/ MES / Railways or any Government,
Semi-Government or private body. Also, no complaint is lodged against the Firm / Company,
as per Appendix 10 of this tender document.
2.10 The bidder must submit a copy of the valid GST registration.
2.11 The bidder must submit a copy of the valid PF & ESIC (Employees' State Insurance Scheme)
2.12 The bidder must submit a copy of the Memorandum of Association or Partnership Deed, as
the case may be.
2.13 The bidder to whom the tender is allotted will have to submit the ECRC certificate to the
Rajkot municipal corporation at the time of first bill.
2.14 The conditional tender shall not be accepted and will be rejected.
2.15 Acceptance of the tenders will rest with The commissioner, RAJKOT MUNICIPAL
RMC/ROSHNI/SOLAR/2026 Page 7 of
CORPORATION, Rajkot, who does not bind himself to accept the lowest tender and reserves
the right to reject any or all tenders without assigning any reason thereof.
2.16 For any legal matter/disputes, The jurisdiction will be Rajkot.
2.17 All the Tender documents/ bid documents/Amendments/Corrigendum/Addenda/copies
must be self-certified/signed with a stamp on every page by the bidder.
2.18 Documents to be submitted with the Techno-commercial Bid: - The bidder shall submit
supporting documents for the product offered by him in the bid as per the following list.
2.18.1 Datasheets for electrical and mechanical properties indicating all the parameters specified in
the detailed Scope of Work.
2.18.2 Specifications and Performance data at Standard Testing Condition for SPV modules.
2.18.3 Graphs indicating:-
2.17.3.1 Efficiency v/s. Temperature at incident irrad. For 200W/m2, 400 W/m2, 600W/m2,
2.17.3.2 Efficiency v/s. Incident radiation at STC.
2.17.3.3 I-V curves at various temperatures at STC, like, 6 º C, 25 º C, 35 º C, 46 º C as well as at
various incident radiation for 200W/m2, 400 W/m2, 600W/m2, 800W/m2, 1000W/m2.
2.17.3.4 Temperature Vs Power at incident radiation. For 200W/m2, 400 W/m2, 600W/m2,
2.18.4 All IEC certificates and other certificates as applicable.
2.18.5 Installation Manuals of Modules and Inverters.
M 2.18.6 Document List:-
A. Tender Fee, Rs. 23,500/-
C. "Experience certificate with O&M"(Min. value:- 21,20,00,000/-, i.e. 40% of Rs.53,00,00,000/-)
D. Electrical Contractor License
E. CA certificate (Min value:- 53,00,00,000/-)
F. Solvency Certificate (Rs.9,27,50,000/-)
H. No Black List Affidavit
I. GST Registration
J. PF Registration
K. ESIC Certificate
L. PV Module OEM letter
M. Tender Copy attested
N. Corrigendum
O. R & B "A" Class Certificate
The Bidders shall submit all the documents listed along with Technical Bid.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 8 of
3 Instructions to bidders
COMMON TERMS AND SPECIAL CONDITIONS OF THE TENDER -
3.1 The conditional tender will not be accepted and will be rejected outright.
3.2 The tender for this work of rate contract shall remain open for 180 days from the last date of
submission of the tender and the bidder shall not be allowed to withdraw or modify the
offer on his own during this period. Any modifications or additions in terms and conditions of
his tender not acceptable to The commissioner, RAJKOT MUNICIPAL CORPORATION, shall
without prejudice to any right or remedy, be at liberty to forfeit in full said earnest money.
3.3 RMC reserves the right to reject all the tenders of the lowest or any other tender which in
the judgment of the RMC and also does not appear to be in its best interest and the bidder
shall have no cause of action or claim against the RMC of its officers, employees, successors
for assignees for rejection of its tender.
3.4 It must be clearly and distinctly understood that the conditions of contract and specifications
shall be rigidly enforced and no relaxation on the grounds of customs prevailing shall be
3.5 The quoted rates online in the Financial Bid shall be inclusive of all taxes (Excluding GST),
duties, etc. and no claim in this context shall be entertained. Participants shall not be paid
any extra amount due to an increase in any type of Government Taxes. during the
M implementation of the contract. Any variations in taxes etc. shall be borne by the bidder.
3.6 It is considered that the bidder has fully acquainted himself with the local situations of the
RAJKOT MUNICIPAL CORPORATION area regarding materials, labor, and other factors about
work and studied the design, plans and estimates before submitting the tender. No further
price escalation will be entertained in the re-design of any of the items related to this
3.7 It will be the responsibility of the bidder to arrange for the necessary import license and
clearance of Govt. of India /State government in time if required so that the imported plant
or equipment could be utilized for the proposed work.
3.8 The work shall be completed within the completion period as mentioned in the work order.
3.9 A work completion period of work order shall include, Approval of BOQ, Approval of detail
drawings of electrical SLD including earthing, Approval of detail drawings of Solar PV arrays
structure design, Inspection and Testing, GEDA registration, work of SITC, PGVCL registration,
NOC from Electrical Inspector, and complete cleaning of the site as per instruction of EIC.
3.10 The work of SITC is to be completed in all respects as per the schedule from the date of a
written order to be commencing the work. Within this period, the bidder shall take the
approval of all documents & drawings and as per tender specification.
3.11 Starting of work of SITC shall not be permitted before Approval of BOQ, Approval of detail
drawings of electrical SLD including earthing, Approval of detail drawings of Solar PV arrays
RMC/ROSHNI/SOLAR/2026 Page 9 of
structure design by RMC, and Necessary Inspection and Testing of material at manufacturers
3.12 All fees, Royalty, or rent of any land/ storehouse to store any material related to any project
will be paid by the bidder.
3.13 In execution of work, if any connection of electricity cable, telephone line, water supply line,
underground drainage line, gas line or any private line of any private property will be cut or
damaged by any person or machinery or equipment of bidder, all responsibility will be of
bidder and bidder has to pay whatever charges incurred to joint/repairer it in proper
workable condition.
3.14 A third-party inspection (TPI)/PMC/PMS agency will be deployed by RAJKOT MUNICIPAL
CORPORATION If necessary/As per requirements and cost of TPI/PMC/PMS for this project
will be borne by RAJKOT MUNICIPAL CORPORATION.
3.15 Inspection:- All materials and workmanship shall be subject to inspection, examination, and
test by the Engineer in charge/consultant/TPI/PMC/PMS at any times during manufacture
and/or construction. The EIC shall have the right to inspect defective material and
workmanship or require its correction. Rejected workmanship shall be satisfactorily replaced
with proper material without additional charge therefore and the Contractor/bidder shall
pro segregate and remove the rejected materials from the works. If the Contractor fails to
M proceed at once with the replacement of rejected materials and/or the corrections of
defective workmanship, the EIC may remedy such work on the risk and the cost of the
bidder or may terminate the right of the Contract to proceed further with the Contractor
shall furnish promptly without additional charge all reasonable facilities, labor, materials
necessary for the safe and convenient inspection and a test that may be required by the
Engineer in charge.
3.16 Testing:- The Contractor/bidder shall provide for all costs of routine testing of material. The
contractor shall provide all costs of the lodging and boarding for 2 persons for inspection and
testing the all materials & Equipment at the manufacture’s facility. The Contractor should
dispatch material at site only after permission of EIC, after factory testing.
3.17 O & M period shall commence from the date of issue of satisfactory work completion
certificate from EIC or report from TPI/PMC/PMS agency as the case may be.
3.18 The Bidder shall also provide fixed / folding staircase to access building‘s terrace/roof for Solar
panel Installation, cleaning and maintenance.
3.19 For purpose of routine cleaning of solar PV panels, the RMC owner provides water; the
bidder shall do related piping and cleaning arrangements.
RMC/ROSHNI/SOLAR/2026 Page 10 of
Special Conditions of the tender: -
3.20 Study the existing load pattern of the electrical load in the concerned premises and design a
grid-interactive solar PV system to be installed on the roof of the premises or available space.
3.21 Provide in-house training in operation, testing, monitoring, and maintenance of the plant. In
addition, submit operation and maintenance manuals.
3.22 Supply, Installation testing, and commissioning of solar grid-interactive PV system with
power import-export arrangement with PGVCL (DISCOM) with 10 years operation and
comprehensive maintenance.
3.23 Details of all the technical personnel whom the bidder shall engage for this work include
their resume-providing name, qualification, nature of work (field or office), mode of
employment, the previous experience shall be provided by the bidder.
3.24 A bidder shall produce original documents for cross verification as and when requested by
3.25 The contractor is expected to study the existing loads to arrive at a recommended capacity of
a PV system and submit an initial design report/Drawings. In addition, it will be following the
latest technology, Gujarat solar power policy, and subsequent amendments thereof.
3.26 Performance Ratio/ Minimum Energy Guarantee of the Solar PV Plant: - The Complete SPV
Plant shall be designed and installed to deliver maximum power under the climatic
M conditions/location of the site. The Nominal/Name plate output rating of the plant shall form
the basis of the calculation of the Performance Ratio. The design of the SPV Plant shall be
such that the losses and in-efficiencies shall be minimized to ensure the highest Performance
Ratio. The procedure for performance monitoring is based on the standard IEC 61724 – PV
system performance monitoring: Guidelines for measurement, data exchange, and analysis.
3.27 Minimum Power generations guarantee (At the Inverter AC OUTPUT): - shall be provided by
the Contractor/Bidder, for the Solar PV Plant System as follows, after considering various
other factors likes, panel degradation, environmental factors, and any other factors, etc.
3.27.1 For 1st year of Operation (After Installation/Commissioning/ Completion) - Minimum
Units per day/ KWp PV Panel Capacity installed, considering 365 days per year.
3.27.2 The subsequent reduction in the Units generated shall be a maximum of 0.8% per year of
subsequent operation. Monthly and Yearly Records of the Units generated shall be
documented and submitted to EIC for verification. The same shall be documented and
certified by the EIC.
3.27.3 Any shortfall in the generated units as against guaranteed units on a per-year basis shall be
compensated by the Bidder/Contractor, through deduction made from his performance
guarantee/SD of O & M period at the rate of Electricity Units paid by the owner to the
DISCOM multiplied by the shortfall in a generation every year as a penalty.
RMC/ROSHNI/SOLAR/2026 Page 11 of
3.28 General Conditions: applicable to all the systems.
3.28.1 PV modules used in solar power plants/systems must be warranted for their output peak
watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end
of the 25 years.
3.28.2 The BoS items/components of the SPV power plants/systems deployed must conform to the
latest edition of IEC/equivalent BIS standards.
3.29 Payment:- The payments to the successful bidder will be made as per the following.
3.29.1 70 % after supply of all plant, equipment, Modules/Inverters, etc. at a site in good condition
and after completion of Installation, Testing, and commissioning of all work, after on
submission of report (Appendix 11) as per for the same from TPI/PMC/PMS Agency (if
deployed) or by EIC.
3.29.2 20 % after successful rebate from PGVCL (DISCOM) electricity bills of 04 months.
3.29.3 10 % of the amount will be considered as a performance guarantee and will be released after
successful completion of O & M 10 years and handing over the site to RMC. If the agency will
submit an FDR or Performance bank guarantee of 10 % for it, a final payment of 10 % will be
M released as per condition no. 5.9.
3.30 Extension of the purchase/quantity: -
The quantity mentioned in the tender is tentative. The commissioner RMC is authorized to
extend the quantity of the supply for further requirements and the bidder must supply. the
same as per the tender approved rates.
3.31 Penalty for SITC period:-
3.31.1 The work shall be completed within the completion period as mentioned in the work order,
failing which penalty at the rate of 0.2 % per day of project value and subject to a maximum
of 10 % of project value shall be imposed, as time is the essence of the contract.
3.31.2 For calculation of penalty, the date of LoA/work order shall be the reference date.
3.32 Penalty for comprehensive O & M period:-
3.32.1 In case of any defect/fault accurse in plant and generation stops during O & M period, the
bidder shall repair/rectify it within 48 hours (forty-eight hours), after 48 hours (forty-eight
hours), the penalty shall be charged as below:-
Penalty per day = KWP capacity of SPV plant x 04 (KWH) x Prevailing rate of kWh of DISCOM
RMC/ROSHNI/SOLAR/2026 Page 12 of
3.33 Guaranteed Generation:-
3.33.1 The bidder shall be responsible for the “Net Electrical Energy Generation Guarantee” on
annual basis considering an average of 04 kWh (unit) per day per KWp capacity of SPV plant.
The Contractor shall demonstrate “Actual Delivered Energy” at a metering point as compared
to the “Net Electrical Energy Generation Guarantee” for every year from the date of starting
of the O&M Period. (O&M period start after submission of report (Appendix 11)
3.33.2 If for any Contract Year, it is found that the “Actual Generated Energy” is less than Net
Electrical Energy Generation Guarantee for the particular year, the Contractor shall pay the
compensation to RAJKOT MUNICIPAL CORPORATION equivalent to Rs. The prevailing rate of
kWh of DISCOM x nos. of kWh of under-generation. In addition, RAJKOT MUNICIPAL
CORPORATION will recover from the Bidder these penalties shall be recovered from
payments yet to be made by RAJKOT MUNICIPAL CORPORATION to the Contractor and/or
from the security deposit/performance Guarantees for this project available with RAJKOT
MUNICIPAL CORPORATION.
3.34 Centralized Data Monitoring System:-
The Bidder/Contractor shall provide and install one common centralized data monitoring
system (All in one computer system with minimum specifications: Intel Core i7 processor,
M TB ROM storage, 16 GB RAM, Windows 11 Pro or equivalent, 24-inch monitor, UPS backup)
at a designated RMC location. This system shall collect real-time generation data from each
solar rooftop plant under RMC via remote monitoring (web portal/API integration with
plant-level inverters/meters). The Contractor shall:
1) Ensure 99.9% uptime for data logging.
2) Submit physical monthly generation reports (hard copy + soft copy in Excel/PDF) for all
RMC sites, including daily/monthly kWh generation, performance ratio, downtime logs,
and comparative analysis.
3) Penalties are imposed(as per claused no 3.32 & 3.33) based on the generation data
submitted by the bidder.
3.35 Provide vehicle facility:-
1) The contractor shall provide at least 1 nos. of SUV minimum 1500 cc engine (Having
working AC) vehicles with designated drivers, required manpower, all fuel, lubricants (POL)
and regular company maintenance, and insurance etc. for the RMC staff for the duration
of the entire project.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with seal:
RMC/ROSHNI/SOLAR/2026 Page 13 of
4 Scope of work
4.1 OBJECTIVE AND SITE DESCRIPTION: - To promote the efficient use of solar energy, RAJKOT
MUNICIPAL CORPORATION is proposing to set up environmental friendly grid-connected
solar power plant system at various buildings and premises of Rajkot Municipal Corporation,
thereby reducing the use of state DISCOM grid power to help to reduce the environmental
impact of pollution and to increase the use green energy/nonconventional source of energy.
4.2 Two-year Rate Contract for Supply, Installation, Testing and Commissioning of
Grid-connected rooftop solar power plant System on RMC buildings with related
comprehensive Electrical, Mechanical & Civil Work including all necessary equipment with
10 (Ten) years comprehensive O&M and Operation & Maintenance of RMC existing solar
4.3 Design, detailed engineering, manufacturing, testing, supply, erection, and commissioning of
solar power grid interactive SPV power plant with comprehensive operation and
maintenance of 10 years at various buildings and premises of Rajkot Municipal Corporation.
The SPV power plant should be designed, installed, and commissioned as per technical
specifications provided in these tender documents and conformance with IS/ BIS/ IEC/ MNRE
4.4 Civil work for grouting/ fixing the panels/ mounting structure on the roof of the identified
premises of Rajkot Municipal Corporation.
4.5 Design, supply, and erection of a sufficient number of junction boxes for each array.
4.6 Supply of appropriate size cables on DC as well as AC side of the inverter.
M 4.7 Supply and installation of appropriate size cables including all interconnecting cables and
cables from array to a junction box, junction box to inverters, DC Distribution box, AC
Distribution box, LT Panel, and all required accessories e.g. lugs, jointing material, bolts,
screws, clamps, and cable trays(As per standard engineering practices).
4.8 Supply, installation, and commissioning of all earthing and lightning protection equipment as
per technical specifications in this tender documents.
4.9 Supply and installation of control equipment, remote monitoring system, with data loggers
and data transmission system, required for monitoring of the system.
4.10 Successful commissioning of plant and providing 04 months of successful operation report.
4.11 Provide necessary manpower for initial operation and maintenance as well as training to the
RAJKOT MUNICIPAL CORPORATION (RMC) staff.
4.12 All necessary, statutory permissions/NOC required for installation of the grid-interactive
system, required from any government.
4.13 or concerned agency (PGVCL, RMC, MNRE, GEDA, Energy, and petrochemical department)
should be sought by a contractor.
4.14 Operation of a PV system to generate optimal power output from the system for 10 years
with monthly performance report generation.
4.15 Comprehensive Maintenance of the System for 10 years from the date of commissioning.
4.16 In the future, if there are any changes in the state government policy restricting the export of
power or net metering application, the bidder should be made provision for blocking the
export of PV system generated power to grid using blocking diode or similar arrangement.
RMC/ROSHNI/SOLAR/2026 Page 14 of
4.17 Liaison with PGVCL/GERC/GEDA and all concerned government agencies for seeking
permission for the operation of solar power peak grid-interactive solar PV System as well as
the signing of a power purchase agreement between RMC and PGVCL to export excess
4.18 Ensure proper selection, procurement, installation, and functioning of the bidirectional
meter and other requisite interconnection components adhering to MNRE/ State guidelines,
as applicable, to ensure the success of the net-metering arrangement.
4.19 To provide a warranty for the performance of the module where the designed output should
not be less than 90 % at the end of a period of 10 years and 80 % at the end of 25 years.
4.20 Supply and installation of control equipment, remote monitoring system, with data loggers
and data transmission system, required for monitoring of the system. Necessary mobile SIM
card provided by the agency and its bill will be paid by the bidder for ten years.
4.21 Supply and installation of Water Sprinkler System: Providing & erecting Automatic solar
panel cleaning system for solar power projects which includes necessary plumbing work
(UPVC pipes and accessories) from source of water to project site (up to 30 meters),Suitable
size of sub mercible/ open well motor, necessary wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the sprinkler system, necessary size and number
of nozzles/JET (minimum 1 Nozzle/Jet per module).
4.22 The successful bidder has to prepare DPR for every plant for which work order is provided by
RMC, according to this RC, and all procedures, formalities, and correspondents with
GEDA/MNRE department and it will be the responsibility of the bidder to sanction all
M necessary approvals, Further if needed bidder shall make the procedure for proposal for
grant/subsidy/CFA in GEDA/MNRE, If require this procedure will work parallel to the
execution of the project or after completion of this project.
4.23 The project cost of a grid-connected rooftop PV system will include the hardware i.e., PV
modules, Module mounting structures, inverters, meters, support structure, charge
controllers, cables required to ensure smooth operation. It will also include the cost of
transportation, installation, connectivity, civil works, all type of taxes(Excluding GST), and
operation and maintenance for ten years along with the warranty of the system.
4.24 WARRANTY: - The mechanical structures, electrical works including Solar panels/ power
conditioners/inverters/charge controllers/maximum power point tracker units/distribution
boards/digital meters/ switchgear, etc. and overall workmanship of the SPV power plants/
systems must be warranted against any manufacturing/ design/ installation defects for a
minimum period of 10 years.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 15 of
5 GENERAL CONDITIONS OF CONTRACT
5.1 Definitions:-In this Contract, the following terms shall be interpreted as indicated: -
5.1.1 “The Contract” means the agreement entered into between the Purchaser and the
Bidder, as recorded in the Contract Form signed by the parties. Including all attachments
& appendices thereto and all documents incorporated by reference therein.
5.1.2 “The Contract Price” means the price payable to the Bidder under the Contract for the
full and proper performance of its contractual obligations.
5.1.3 “The Goods” means all of the equipment, machinery, and/or other materials which the
supplier is required to supply to the Purchaser under the Contract.
5.1.4 “Services” means services ancillary to the supply of the Goods, such as transportation &
insurance, and any commissioning, provision of technical assistance, training, and other
such obligations of the Bidder covered under the Contract.
5.1.5 “The Purchaser” means the organization purchasing the Goods; and,
5.1.6 “The Bidder” or “The Bidder” or “The Agency” means the individual or firm supplying the
Goods under this Contract.
5.1.7 “RMC” means RAJKOT MUNICIPAL CORPORATION.
5.1.8 Solar PV System capacity:- The capacity of the Grid Connected Solar Rooftop PV System
under this tender shall be considered in terms of AC Capacity (kW), which shall be the
rated output capacity of the solar inverter at the delivery point. The bidder shall design,
M supply, install, testing and commissioning of the Solar PV system such that the DC
capacity of the PV modules (in kWp) is appropriately higher than the AC capacity of the
inverter, to achieve optimum system performance.
5.1.9 DC/AC Ratio:- The DC to AC ratio of the Solar PV system shall generally be maintained in
the range of 1.20, unless otherwise specified. Any deviation from this range shall require
prior approval of the Engineer-in-Charge.
•Example Clarification:- For illustration, a system specified as 5 kW capacity under this
tender shall mean 5 kW AC inverter capacity, and the corresponding PV module
capacity may be in the range of approximately 6.0 kWp to 7.0 kWp (DC).
5.1.10 Measurement & Payment:- Measurement for the purpose of payment shall be based on
the installed AC capacity (kW) of the inverter as specified in the work order. No separate
payment shall be made for additional DC capacity of PV modules installed to achieve
optimal DC/AC ratio.
5.2 Standards:- The Goods supplied under this Contract shall conform to the standards
mentioned in the Technical Specifications, and, when no applicable standard is mentioned, to
the authoritative standard appropriate to the Good’s country of origin and such standards
shall be the latest issued by the concerned institution.
5.3 Patent Rights: - The Bidder shall indemnify the Purchaser against all third-party claims of
infringement of patent, trademark, or industrial design rights arising from the use of the
Goods or any part thereof in India.
RMC/ROSHNI/SOLAR/2026 Page 16 of
5.4 Security Deposit:
The successful bidder shall submit a Security Deposit @ 5% of the Contract Value in the form
of a Bank Guarantee or Fixed Deposit Receipt (FDR) issued by a Nationalized/Scheduled
Bank, valid for 30 months, before signing the contract. The full Security Deposit amount shall
be refunded, without any interest, after deduction of dues, taxes, penalties, etc. (if any) after
If the Contract Price offered by the selected bidder is lower than 10% but up to 20% of the
Estimated Project Cost, an additional Performance Security shall be calculated @ 20% of the
difference between the Estimated Project Cost minus 10% of the Estimated Project Cost and
the Contract Price offered by the bidder. If the Contract Price offered is lower than 20% of
the Estimated Project Cost, the additional Performance Security shall be calculated @ 30%
of the difference between the Estimated Project Cost minus 10% of the Estimated Project
Cost and the Contract Price offered by the bidder.
The additional Performance Security shall be treated as part of the Performance Security.
The Performance Security shall remain valid for a period extending 60 days beyond the
Defect Liability Period, and the additional Performance Security shall remain valid for
days beyond the Project Completion Date. The final Security Deposit amount will be
determined at the time of the Final Bill based on the actual completion amount.
M 5.5 The signing of the contract:-
The successful bidder shall be required to execute the contract agreement within 10 days of
receipt of intimation to execute the contract, failing which the RMC will be entitled to reject
the award and forfeit the Earnest Money Deposit. The person to sign the contract document
shall be a person assigning tender documents.
The contract agreement shall be on the stamp paper of a value of 4.90 % of the amount of
security deposit if the security deposit is submitted in the form of bank F.D.R. The contract
agreement shall be on the stamp paper of a value of Rs. 300=00, if a security deposit is
submitted in the form of a bank guarantee.
5.6 Tools & Tackles:- All tools and tackles required for the work shall have to be procured by the
contractor at his cost. The contractor will have to maintain reliable sets of tools and tackles
in adequate quantities to complete the job as expeditiously as possible.
5.7 Inspections and Tests: - The Purchaser (RMC) or its representative shall have the right to
inspect and/or to test the Goods to confirm their conformity to the Contract. A successful
bidder must send the material to a site after prior approval of EIC.
5.8 Transportation: - Where the Bidder is required under the Contract to deliver the Goods, FOR-
Site, transport of the Goods, up to and including the point of putting the Goods, including
loading-unloading at the site shall be arranged and paid for by the Bidder, and the cost
thereof shall be included in the Contract Price. Where the Bidder is required to affect
delivery under any other terms, for example, by post or to another address in the source
RMC/ROSHNI/SOLAR/2026 Page 17 of
country, the Bidder shall be required to meet all transport and storage expenses until
5.9 Performance Guarantee and Guarantee Period: - RMC will deduct 10 % amount as
Performance Guarantee from the total amount of final bill prepared after the successful
Performance Guarantee from the total amount of final bill prepared after the successful
completion of every work under this rate contract or the bidder can submit the FDR of such
value for 120 months and the same will be returned to the contractor after completion of
comprehensive O&M period. No interest will be paid on this. The successful bidder shall have
to stand a guarantee against bad workmanship and supply of poor quality and/or defective
materials for 10 years (120 months) after the date of successful energization of the
installation(s) and handing over the same to RMC. Any defect/discrepancy detected during
this guarantee period will have to be made good by the contractor at his costs and risks. If for
any reason, RMC is required to rectify such defects/ discrepancies detected during this
guarantee period, the entire cost involved will be released from the dues payable to the
contractor/Bank Guarantee/FDR by RMC. In case of damage to any parts of the
project/system that occurred due to external accidents, casualties or damages due to natural
calamities, the bidder must restore the project or parts thereof without any additional
payments towards the labor work, however, RMC will pay the bidder for the supply of the
material as per the tender approved rates or as per prevailing SOR of RMC/SOR of R & B/
SOR of GWSSB or market rate during the whole Performance Guarantee Period.
M 5.10 Delays in the Bidder’s Performance: - Delivery of the Goods and performance of Services
shall be made by the Bidder following the schedule specified by the Purchaser. In case of any
such delay, RMC will impose the penalty @ 0.2 % of the contract value per day maximum of
up to 10% of the contract value given in the work order. However, if such delay is prolonged
beyond the required realization of the project or an unexcused delay by the bidder in the
performance of its delivery obligations shall render the bidder liable to any or all of the
following sanctions:
i) forfeiture of its performance security, ii) imposition of liquidated damages, iii) and/or
termination of the contract for default. The commissioner, RMC reserves the right to
terminate the contract/Black list the agency/bidder or to take relevant actions during the
contract period (SITC and Comprehensive O & M) without assigning any reason.
5.11 Force Majeure: - The Bidder shall not be liable for forfeiture of its performance security,
liquidated damages, or termination for default, if and to the extent that, its delay in
performance or other failures to perform its obligations under the Contract is the result of an
event of Force Majeure. For purposes of this clause, “Force Majeure” means an event
beyond the control of the Bidder not involving the Bidder’s fault or negligence and not
foreseeable. Such events may include, but are not restricted to, acts of the Purchaser either
in its sovereign or contractual capacity, wars or revolutions, fires, floods, epidemics,
quarantine restrictions, and freight embargoes. If a Force Majeure situation arises, the
Bidder shall and promptly notify the Purchaser in writing of such condition and the cause
RMC/ROSHNI/SOLAR/2026 Page 18 of
thereof, Unless otherwise directed by its obligations under the Contract as far as reasonably
practical, and shall seek all reasonable alternative means for performance not prevented by
the Force Majeure event.
5.12 Applicable Law: -The Contract shall be interpreted following the Indian laws.
5.13 Notices:- Any notice given by one party to the other according to the Contract shall be sent
in writing in English or vernacular language (or by Letter/fax/email/scanned copy through
email. Any notice shall be effective when delivered or on the notice’s effective date,
whichever is later.
5.14 Taxes and Duties:- Customs/import duty, excise duty (Excluding GST) and any other taxes on
finished products, sales tax on works contract and turnover taxes, if any, paid by the
Contractor under any central, state, or local government rules and regulations will be
included to the Contract Price.
5.15 Insurance:- The Goods supplied under this Contract shall be fully insured by bidder against
theft, loss, or damage incidental to manufacture or acquisition, transportation, storage, and
delivery in the manner specified or directed by EIC. This project is with a comprehensive
O&M of ten years, any parts/spares/components of the whole project are stolen or damaged
by any means, and the contractor has to replace the same without any extra charges.
5.16 Extra Item of Work:-
● The extra work beyond the tender item, if required to be executed during execution
M of a regular work site or at another site shall have to be carried out by the contractor
as per the instructions and satisfaction of the Engineer-in-charge. This will be paid
separately as per detailed rate analysis made by the department based on market
rate or prevalent SOR of RMC/SOR of R & B/ SOR of GWSSB.
● If in the interest of the RMC it is necessary to change either any site or the design of
the proposed work the Contractor shall carry out the same at his quoted rates
without charging any extra and he will be paid at the rates quoted by him and no
claim for extra amount for subsequent changes made will be entertained.
5.17 Measurement of Work:- The measurements of work will be taken according to the usual
method in use in the RAJKOT MUNICIPAL CORPORATION and no proposals to adopt
alternative methods will be accepted.
5.18 No claim to any payment or for restriction of work:- In the case of any delay in the supply of
materials, RMC shall grant such extension of time for the completion of the works as shall
appear reasonable following the circumstances of the case. The decision of the concerned
officer of RMC for such Extension of Time shall be accepted as final by the successful bidder.
5.19 Action and compensation in case of bad work:- If, at any time before the expiry of defects
Liability period, it shall appear to officials of the OWNER, that any work has been executed
with unsound, imperfect or unskilled workmanship or with materials or inferior quality or
that any materials or articles provided by him for the execution of the work are unsound, or
RMC/ROSHNI/SOLAR/2026 Page 19 of
of a quality inferior to that contracted for or are otherwise not in accordance with the
contract, the Contractor shall be bound forthwith to rectify, or remove and reconstruct the
work so specified in whole or in part as the case may require, or if so required shall remove
the materials or articles so specified in whole or in part and provide other proper and
suitable materials or articles at his own charge and cost, and in the event of his failing to do
so within a period to be specified by the OWNER in the written intimation aforesaid, the
Contractor shall be liable to pay compensation at the rate of one percent on the amount of
the estimate of the rectification for every day not exceeding ten days during which the
failure so continues, and in the event of any such failure as aforesaid continuing beyond ten
days, the OWNER may rectify or remove, and re-execute the work or remove and replace
the materials complained of, as the case may be at the risk and expense in all respects of
the Contractor.
5.20 Defect Liability Period;- The Contractor shall be responsible to make good and remedy at
his own expense for any defect which may develop or maybe be noticed before the period
mentioned here under from the certified date of completion. The Engineer-in-charge shall
give the Contractor notice in writing/in verbal about the defects and the Contractor shall
make good the same within 48 hours of receipt of the notice. In the case of failure on the
part of the Contractor, Engineer-in-charge may rectify or remove or re-execute the work at
the risk & cost of the Contractor. The Engineer-in-charge shall be entitled to appropriate the
M whole or any part of the amount of the security deposit towards the expenses, if any,
incurred by him in rectification, removal, or re-execution. The Defects Liability period shall
be as under (a) The period shall be 120 months from the date of start of O & M period.
5.21 Setting out the Works:- The Contractor shall be responsible for the true and proper setting
out of the works about original points, lines, and levels of reference given by the Engineer in
writing or shown on the Drawings and for correctness, subject as above mentioned in the
position, levels, dimensions and alignment of all parts of the works and for the provision of
all necessary instruments, appliances, and labor in connection therewith.
5.22 Amenities to be Preserved:- The Contractor shall cause the least possible interference
with the existing amenities, whether natural or manmade. No tree shall be felled without
permission of the Engineer’s Representative and clearance of the site shall generally be kept
to the minimum necessary for the works and temporary works.
5.23 Safety Measures and Services:- The Contractor shall be responsible for the safety of all
workmen and other persons entering or in the works and shall take all measures necessary
to ensure their safety to the approval of the Engineer’s Representative. The contractor shall
provide and maintain at his expense all lights, guards, fencing, and necessary watchmen
when and where necessary or as required by the Owner / Engineer for the protection of the
works or the safety and convenience of those employed on the works and the public.
RMC/ROSHNI/SOLAR/2026 Page 20 of
5.24 Liability of accidents to persons;- In the case of an accident, in respect of which
compensation may become payable under the Workmen’s Compensation Act, the
contractor is fully responsible for such event and payments thereof.
5.25 Clearing Site on Completion:- On completion of the Works, the Contractor shall clear away
and remove from the site all Constructional Plant, surplus materials, rubbish, Temporary
Works of every kind and leave the whole of the site and the works clean and in a
workmanlike condition to the satisfaction of The Engineer-in-charge.
5.26 Safe custody of stores:- The bidder will be entirely responsible for all the erected structures
and materials used by him for the works and the executed portion of the works till it is
officially taken over by RMC. It would be the responsibility of the bidder to keep the
insurance policy alive throughout the entire period of execution and till the installation is
handed over to RMC for any loss, damage, or theft of materials and/or erected works
before taking over by RMC.
5.27 ST, IT & PT clearance, etc:- The bidder is responsible for ST, IT, and PT or any other tax
5.28 Labor license:- The bidder will have to abide by the provisions of the contract labor
(Regulation & Abolition) Act.
5.29 Accidents:- RMC shall neither be responsible nor shall be liable to pay any compensation for
any accident caused to any worker/public arising out of the execution of work /O & M
M period/executed portion of work till it is finally taken over and handed over to
RMC/Appropriate Authority.
5.30 Stoppage of work:- RMC shall not be responsible nor be liable to pay any compensation for
any interruption of work in the field due directly to war, strike, civil commotion, lockout,
risk, earthquake tempest, lightning, flood, cyclone, etc. which occur beyond its control.
Similarly, RMC also would neither be held responsible nor liable for compensation for
stoppage of contractor’s work in the field arising out of resistance/resentment of the local
5.31 Non-interference with existing services:- During execution, the erection contractor shall be
required to take all precautionary measures not to interfere/dash/disturb with any service
line for electrical, water, or similar other services. In case such things happen incidentally,
the same has to be made good at his own cost. The successful bidder must coordinate with
the other concerned authority/agency for smooth execution of the work.
5.32 Contract Period :-
● Time of this contract for 24 months.
● The duration of this contract period can be extended up to 12 months by mutual
agreement between RMC and the bidder.
RMC/ROSHNI/SOLAR/2026 Page 21 of
5.33 Third Party Inspection (TPI):-
Bidder shall note that materials which are to be supplied for SITC under this tender will be
inspected by Third Party Inspection (TPI) agency approved by RMC & its Quality Acceptance
(QA) certificate must be produce with materials. The cost of TPI is to be borne by
contractor. No any extra payment given to the contractor for same.
The TPI will be RMC empanelled Third Party Inspection(TPI) agency.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 22 of
6. TECHNICAL SPECIFICATIONS
The different works of grid-connected rooftop solar power plants under this rate contract shall be
commissioned as per the technical specifications given below.
6.1 DEFINITION;- The Grid Connect Solar Power Generating System consists of mainly three
components viz. the solar photovoltaic (SPV) array, module mounting structure, and the power
conditioning unit (PCU)/ inverter. The SPV array converts the solar energy into DC electrical
energy. The module mounting structure holds the modules in the required position and the DC
electrical energy is converted to AC power by the PCU, which is connected to the power grid. The
AC power output of the inverter is fed to the AC distribution board through metering panel and
isolation panel. The 415 V AC -3Ø output of the system can be utilized or synchronizing with the
grid, can be exported to the grid.
6.2 PV MODULE TECHNICAL SPECIFICATION:-
Please refer MNRE’s Domestic Content Requirement (DCR) norms for Solar PV Cells - Reg.
Description Rating Remarks
01 Type of PV Cell Bifacial N- Type TOPCon Module Test report to be
(Glass to Glass) or N-type crystalline submitted
silicon with amorphous silicon
heterojunction (HJT) (Glass to Glass)
02 Power rating at STC 620 Wp or higher Test report to
M (where STC is Standard Testing Condition
with air mass AM1.5, irradiance
W/m2, and cell temperature 25°C).
Module capacity less than 620wp
should not be accepted.
03 The efficiency of minimum ≥ 22% Test report to be
all photovoltaic modules submitted
04 Open-circuit voltage (Voc) at As per relevant IEC standard Test report to
STC be submitted
05 Maximum power As per relevant IEC standard Test report to be
voltage (Vmp) at STC submitted
06 Short-circuit current (Isc) at As per relevant IEC standard Test report to be
07 Temperature coefficient of ≤ –0.30%/°C (ideally better) Test report to
Pmax be submitted
08 Minimum Operating Life 25 Years ------
09 Maximum The power output at STC for all the Test report to
allowable degradation of PV PV modules shall not drop below be submitted
modules 90% of the rated power output at
STC during the first 10 years and it
shall not drop below 80% during
the subsequent 15 years after the
date of supply.
RMC/ROSHNI/SOLAR/2026 Page 23 of
6.3 OVERALL PV MODULE DESIGN SPECIFICATIONS:-
Modules shall be designed for a maximum system voltage of 1500 V DC or higher as per IEC 61730 and
each module shall be of Bifacial N- Type TOPCon Module (Glass to Glass) or N-type crystalline silicon
with amorphous silicon heterojunction (HJT) – 620wp or higher (132 cell or higher). And it is
mandatory to use domestically manufactured solar PV cells and domestically manufactured solar PV
modules ( Please refer MNRE’s Domestic Content Requirement (DCR) norms for Solar PV Cells - Reg.).
6.3.1 Modules shall be designed for maximum reverse current of as per standard.
6.3.2 Modules shall be designed for maximum wind load as per Safety standard IEC
6.3.3 Permitted module temperature on continuous duty shall be as per standard.
6.3.4 The front surface of the module shall consist of impact-resistant, low iron; high energy yield
anti-reflective, and superior transmittance tempered or toughened glass with the minimum
required thickness. It shall also have a tough multi-layered polymer back sheet for
environment protection against moisture and provide high voltage electrical insulation.
6.3.5 The PV module front glass shall be such that it shall facilitate regular cleaning by water as
well as with powder or equivalent chemical.
6.3.6 Frame design shall be unique & rugged with high mechanical strength for easy installation.
6.3.7 The solar cell shall have a surface with an anti-reflective coating to help absorb more light in
all weather conditions.
6.3.8 The PV module(s) shall be PID-free. The PV module(s) shall support negative earthing at the
inverter side or in the electrical system, without affecting the performance of PV modules
throughout plant life.
6.3.9 Bidder to indicate in their bid for the type of earthing required positive or negative pole to
maintain the performance PV modules in entire life along with detail technical explanation
through proper documents.
Suitable encapsulates and sealants shall be used to fix the frames and junction box to
protect the silicon cells from environmental effects. The encapsulation arrangement shall
also ensure complete moisture proofing for the entire life of solar modules. The SPV
modules should have suitable encapsulation and sealing arrangements to protect the silicon
cells from the environment. Construction of the module shall allow daily washing without
leakage of water inside the PV cell.
6.3.11 The module frame shall be made of Aluminum ( with an Anodized finish ), which shall be
electrolytically compatible with the structural material used for mounting the modules with
sufficient numbers of grounding/installation points.
6.3.12 The Interconnected cells shall be laminated in a vacuum to withstand adverse environmental
6.3.13 Solar PV module shall have module safety class-II and should be highly reliable, lightweight,
and must have a service life of more than 25 years.
6.3.14 The bidder should provide the authorized module datasheet of OEM.
6.3.15 Bidder should submit a copy of IEC certificates of the module(s) available with them.
6.3.16 The Bidder shall submit list of serial numbers or ID of all modules supplied under this
contract along with the above parametric data for each module with an authorized signature
by a competent authority at the end of supply in hard copy and soft copy.
6.3.17 The Bidder is advised to check and ensure the availability of modules before submitting the
RMC/ROSHNI/SOLAR/2026 Page 24 of
6.3.18 Design memorandum for PV modules having details of PV module construction details,
erection philosophy, maintenance philosophy, body earthing, connector details, etc shall be
6.3.19 The PV modules used must qualify to the latest edition of IEC for PV module qualification
test or equivalent BIS standards Crystalline silicon solar cell modules IEC 61 215 /IS14286, in
addition, the module must conform to IEC 61730 part -2 requirements for construction and
part – 2 requirements for testing, for safety qualification or equivalent, IS.
6.3.20 Non-conformity to specifications due to faulty manufacturing and/or inspection processes. If
the solar module(s) fails to conform to these technical specifications requirements, the
manufacture/bidder will repair or replace the solar module(s), at the Owners sole option.
6.3.21 The solar modules shall be tested with relevant Applicable IEC dust standards.
6.4 PV MODULE CERTIFICATION: -The modules shall carry the following certifications:-
6.4.1 The module must mandatorily meet the requirement laid by SECI/, MNRE, or any other
designated agency appointed by the Government of India or Government of Gujarat.
6.4.2 The SPV modules used in the On-grid solar power projects to the latest edition of the
following IEC PV module qualification test or equivalent BIS standards.
6.4.3 Crystalline Silicon Solar Cell Modules –IEC 61215 ( 2nd Edition): Design qualification and type
6.5 OTHER CONDITIONS (BOUNDARY CONDITIONS/ INTERFACE WITH OTHER PACKAGES) FOR PV
6.5.1 Modules shall be packaged in pallets such that the mismatch losses within the modules shall
be less than as per standard.
6.5.2 Module packing shall be optimized so that the mismatch losses within the whole lot supplied
under this contract are minimized.
6.5.3 Agency hall deputes their representative during PV module unloading and erection at each
site to ensure proper handling and installation of modules.
6.6 MODULE JUNCTION BOX:-
6.6.1 The Junction boxes are to be provided in the PV array for termination of connecting cables.
The junction boxes shall be made of GRP/FRP/powder-coated aluminum/Cast aluminum alloy
with full dust, water, and vermin proof arrangement with IP 67 or higher protection class and
shall be designed for long life outdoor operation in harsh environment as per relevant
standard specification and protected against surges. All wires/ cables must be terminated
through cable lugs. The JBs shall be such that input and output termination can be made
through suitable cable glands. Cable ferrules must be fitted at the cable termination points
for identification.
6.6.2 Copper bus bars/Terminal blocks housed in the junction box with suitable termination
threads conforming to IP 67 standard and relevant IEC standards, hinged door with an EPDM
rubber gasket to prevent water entry. Single/double compression cable glands. Provision of
necessary earthing. It should be placed at ha eight from ground level as per relevant IEC/BIS
standards, for ease of accessibility. The junction box shall consist of a semi-permeable
membrane to allow entry/ escape of air in/ from the junction box but block the entry of
moisture and water. The Junction box shall be weatherproof.
RMC/ROSHNI/SOLAR/2026 Page 25 of
6.7 SOLAR DC/AC CABLE: - Cables of appropriate size to be used in the system shall have the
following characteristics: -
6.7.1 Shall meet IEC 60227/IS 694, IEC 60502/IS1554 standards.
6.7.2 Temp. Range: –10oC to +80oC.
6.7.3 Voltage rating 660/1000V.
6.7.4 Excellent resistance to heat, cold, water, oil, abrasion, UV radiation.
6.7.5 Flexible.
6.7.6 Sizes of cables between array interconnections, array to junction boxes, junction boxes to
Inverter, etc. shall be so selected to keep the voltage drop (power loss) of the entire solar
system to the minimum. The cables (as per IS) should be insulated with a special grade PVC
compound formulated for outdoor use.
6.7.7 Cable Routing/ Marking: All cable/wires are to be routed in a GI cable tray (or in GI pipes
in case of underground cables crossing roads) and suitably tagged and marked with a
proper manner by a good quality ferrule or by other means so that the cable easily
6.7.8 The Cable should be so selected that it should be compatible up to the life of the solar PV
panels i.e. 25years. A successful bidder must send the cable to a site after prior approval of
6.7.9 The ratings given are approximate. Bidder to indicate size and length as per system design
requirement. All the cables required for the plant are provided by the bidder. Any change in
cabling sizes if desired by the bidder/approved after citing appropriate reasons. All cable
schedules/layout drawings are approved before installation.
6.7.10 Multi-Strand, Annealed high conductivity copper conductor PVC type ‘A’ pressure extruded
insulation or XLPE insulation. Overall PVC/XLPE insulation for UV protection Armored cable
M for underground laying(As per standard engineering practices). All cable trays including
covers to be provided. All cables should conform to the latest edition of IEC/ equivalent BIS
Standards for indoor/outdoor installations IS/IEC 69947. PVC/XLPE insulated cables for
working Voltage up to and including 1100 V ,U V resistant for outdoor installation IS /IEC
6.7.11 The size of each type of DC/AC cable selected shall be based on minimum voltage drop,
however; the maximum drop shall be limited as per relevant IEC/BIS standards for DC cables
(use copper cable only) and the maximum drop shall be limited as per relevant IEC/BIS
standards for AC cables.
6.7.12 For any separate solar power plant AC cable length 30(thirty) meter will be considered in
the rate of solar project. If AC cable is used for more than 30 meters for any project, the
additional cable supply charges will be paid separately as per prevalent SOR of RMC-SOR or
R&B-SOR or detailed rate analysis made by the department based on market rate.
6.8 SOLAR CABLE CONNECTOR:-
6.8.1 The connector shall be rated for system voltage & current.
6.8.2 The connector shall be rated for IP65 / IP67 or higher in closed condition.
6.9 Warranties against performance degradation:- The bidder shall offer warrantee as per the
following conditions.
6.9.1 The power output at STC for all the PV modules shall not drop below 90% of the rated power
output at STC during the first 10 years and it shall not drop below 80% during the
subsequent 15 years after the date of completion. If, Module(s) fail(s) to exhibit performance
as stated above during the entire life span of 25 years, either due to normal degradation or
defect in module(s) circuit, junction box(es), connections, etc., the Contractor will have to
either replace or repair such underperforming/ defective PV Module(s) with no extra cost to
RMC within maximum 10 days from date of intimation through e-mail or written notice.
RMC/ROSHNI/SOLAR/2026 Page 26 of
6.10 TECHNICAL SPECIFICATION OF Module Mounting Structure (MMS):- Technical Specifications for
MMS shall be as per following.
Sr.No. Parameter Specification
Type of Structure Single/multi-pole supporting with Seasonal.
Total nos. of seasonal tilt positions
Material of Structure Structural Steel as per IS 2062 with Hot Dip
Galvanizing having a minimum thickness of
80 microns and quality as per galvanizing.
4 Acceptable make of Structural Steel reputed make shall be allowed.
5 Material of Fasteners / foundation bolts SS
6 PV Modules per MMS as per relevant IEC/BIS standards.
Module Type Bifacial N- Type TOPCon Module (Glass to
Glass) or N-type crystalline silicon with
amorphous silicon heterojunction (HJT)
(Glass to Glass) 620 Wp or higher. (132 cell
8 The direction & Hight of Module facing South facing. (Height to be fixed by EIC)
Protection against wind The Mounting structure shall be so
designed to withstand the speed for the
wind zone of the location where a PV
system is proposed to be installed
6.11 EARTHING AND SURGE PROTECTION:-
6.11.1Surge Protection Device (SPD): Internal surge protection shall consist of three MOV type arrestors
connected from +ve and –ve terminals to earth (via Y arrangement) for higher withstand of the
continuous PV-DC voltage during earth fault conditions SPD shall have safe disconnection and
short circuit interruption arrangements through integrated DC in-built bypass fuse (parallel) which
should get tripped during failure mode of MOV, extinguishing DC arc safely to protect the
installation against fire hazards. Nominal discharge current (In) at 8/20 micro seconds shall be
minimum 10 kA with maximum discharge (Imax) at 8/20 microseconds minimum 20 kA with
visual indication (through mechanical flag) in modules to monitor the life of SPD.
6.12 EARTHING FOR PV ARRAY:-
6.12.1 The photovoltaic modules, BOS, and other components of the power plant requires adequate
earthing for protecting against any serious faults as guided by IEC
6.12.2 The Earthing for array and HT/LT power system shall be made with Suitable size of bore type
chemical earthing including accessories.
6.12.3 Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic
checking of earth resistance.
6.12.4 Each string/ array and MMS of the plant shall be grounded properly. The array structures
are to be connected to earth pits as per IS standards. Necessary provision shall be made for
bolted isolating joints of each earthing pit for periodic checking of earth resistance.
RMC/ROSHNI/SOLAR/2026 Page 27 of
6.12.5 The complete earthing system shall be mechanically & electrically connected to provide
independent return to earth. For each earth pit, a necessary test point shall be provided.
6.12.6 In compliance to Rule 11 and 61 of Indian Electricity Rules, 1956 (as amended up to date), all
non-current carrying metal parts shall be earthed with two separate and distinct earth
continuity conductors to an efficient earth electrode.
6.12.7 The Bidder shall submit the detailed specifications of the array earthing.
6.12.8 Nos. of earthing must be as per standard rules.
6.13 LIGHTNING PROTECTION FOR PV ARRAY:-
6.13.1 The source of overvoltage can be lightning or other atmospheric disturbance. Main aim of
overvoltage protection is to reduce the overvoltage to a tolerable level before it reaches the
PV or other sub-system components as per IEC
6.13.2 The protection against induced high-voltages shall be provided by the use of metal oxide
varistors (MOVs).
6.13.3 Necessary concrete foundation for holding the lightning conductor in position to be made
after giving due consideration to shadow on PV array, maximum wind speed, and
maintenance requirement at a site in future.
6.13.4 The lightning conductor shall be earthed through flats and connected to the earth mats as
per applicable Indian Standards with earth pits. Each lightning conductor shall be fitted with
individual earth pit as per required Standards including accessories, and providing masonry
enclosure with cast iron cover plate, watering pipe, and chemical Earthing.
6.13.5 If necessary more numbers of lightning conductors may be provided.
6.13.6 The Bidder shall submit the drawings and detailed specifications of the PV array lightning
protection equipment.
6.13.7 Nos. of lightning protection must be as per standard rules.
6.14 GRID ISLANDING: -
6.14.1 In the event of a power failure on the electric grid, it is required that any independent power-
producing inverters attached to the grid turn off in a short period. This prevents the DC-to-AC
inverters from continuing to feed power into small sections of the grid, known as “Islands.”
Powered Islands present a risk to workers who may expect the area to be unpowered, and
they may also damage grid-tied equipment. This SPV plant system shall be equipped with
islanding protection. In addition to disconnection from the grid (due to islanding protection)
disconnection due to under and overvoltage conditions shall also be provided.
6.14.2 A manual disconnect 4-pole isolation switch(MCCB or ACB) beside automatic disconnection
to the grid would have to be provided at utility end with appropriate cabaling to isolate the
grid connection by the utility personnel to carry out any maintenance. This switch shall be
locked by the utility personnel.
6.15 MECHANICAL COMPONENTS:-
6.15.1 Metallic frame structure of galvanized steel with stands to be fixed on the roof/terrace to
hold the SPV module (s) above roof level and clearance between roof/terrace level and PV
module shall be kept as per relevant IEC/BIS norms. Concrete foundations of appropriate
weight and depth for elevated structures mounted directly on the roof/terrace; bolted with
anchor bolts of appropriate strength for elevated structures mounted on RCC foundation.
6.15.2 Civil Foundation for Solar PV Module Mounting Structure (MMS): The foundations shall be
designed considering the weight and distribution of the structure and assembly, and a
maximum wind speed. Seismic factors for the site to be considered while making the
foundation design. Foundations shall be made following the Indian Standard Codes, with the
help of Registered Structural Designer having substantial experience in similar work. Bidder
RMC/ROSHNI/SOLAR/2026 Page 28 of
shall submit the detailed structural design analysis along with calculations and
bases/standards.
6.15.3 The successful bidder shall design and construct appropriate civil foundations for MMS,
prefabricated structures, etc. The design of the RCC foundation shall be approved by RMC.
6.15.4 The frame structure should have provision to adjust at a necessary angle of inclination to the
horizontal, so that it can be installed at the specified tilt angle i.e. inclined at the necessary
degree to horizontal facing to the south. All hardware, nuts, bolts should be SS -
6.16 METERING:- Meters suitable for synchronization with the LT side of the plant shall be as below.
6.16.1 The bidder has to provide a suitable unidirectional meter of PGVCL approved make/as per
PGVCL norms, for measurement of energy generation as per requirement/as per biasing of
inverters. In addition, it shall be tested at the DISCOM laboratory. Necessary liaison and
payments of the same are to be made by the bidder. The cost of the meter is borne by the
6.16.2 The bidder has to provide a suitable bidirectional meter of PGVCL approved make/ as per
PGVCL norms for measurement of Export/Import of energy generation as per requirements
of DISCOM/Existing DISCOM connection. And it shall be tested and approved at the DISCOM
laboratory. Necessary liaison and payments of the same are to be made by the bidder. The
bidder will be reimbursed the payments against the proof (Original Receipt of payments of
DISCOM’S charges) of the payments for meter testing, service connection & network
strengthening charges only. Necessary nos. of modems shall be supplied by bidder. The cost
of meter and modems is borne by the bidder.
6.17 PCU/ARRAY SIZE RATIO:-
6.17.1 The combined wattage of all inverters/PCU shall be 1.2 times higher rated capacity of
the power plant under STC.
6.17.2 This practice aligns billing and capacity assessments with the actual AC power handling
capability of the plant, leading to fairer financial settlements.
6.17.3 Dual Maximum power point tracker shall be integrated into the PCU/inverter to
maximize energy drawn from the array.
6.18 Power Conditioning Unit/Inverter:- As the SPV array produces direct current electricity, it is
necessary to convert this direct current into alternating current and adjust the voltage levels
to synchronize and match with the grid voltage. Conversion shall be achieved using an
electronic Inverter and the associated control and protection devices. All these components
of the system are termed the “Power Conditioning Unit (PCU)”. In addition, the PCU shall also
house MPPT (Maximum Power Point Tracker), an interface between the Solar PV array & the
Inverter, to the power conditioning unit. Inverter output should be compatible with the grid
frequency. Typical technical features of the inverter. The details of the Power Conditioning
Unit/Inverter are as given below and it Must additionally conform to the relevant
national/international Electrical Safety Standards.
Capacity and Nos. of inverters/PCU or string of inverters shall be decided by EIC of RMC as
per the capacity of grid-connected SPV plant in the work order, installed under this rate
RMC/ROSHNI/SOLAR/2026 Page 29 of
Main Technical specifications of Power Conditioning Unit/Inverter are as under :-
Sr.No. Description Requirement
1 Purpose The power conditioner unit shall convert DC produced by SPV
array to AC and adjust the voltage & frequency levels to suit
2 Grid supervision All three phases shall be supervised with respect to rise / fall
in programmable threshold values of frequency & the power
section of the plant. The plant shall get disconnected /
connected from the grid in case of a grid fault / after normal
grid conditions have resumed. The grid supervision must
comply with VDEW or other relevant/equivalent regulations.
3 Type & technology IGBT based. (Utilize A circuit topology and components suitable
for meeting the specifications).
4 Control Microprocessor (Smart inverter)
5 Output voltage on 415 V +10%, - 15% V AC
AC side PCU/ Solar Inverter voltage range should be reconfigured as
per site requirements
AC voltage range must be +25% or -25% for inverters.
6 Output Frequency 50 Hz
7 Grid frequency +/- 3 Hz or more
synchronization
DC system voltage The electrical safety of the array installation is of the utmost
importance. Array electrical configuration shall be in such a way
that, the MPPT shall operate with maximum
efficiency, between the low and high temperature of the site.
9 Maximal Current 5% PP
10 Power Factor >0.9
11 Ambient -10 to +60 deg C
12 Housing cabinet. (a) PCU is housed in a suitable switch cabinet, with more
than IP 66 for outdoor/indoor applications.
(b) Weatherproof, rodents & insectproof.
(c) Components and circuit boards mounted inside the
enclosures identified with appropriate permanent
designations, which shall also serve to identify the items
on the supplied drawings.
(d) All doors, covers, panels, and cable exits shall be designed
to limit the entry of dust and moisture. All doors shall be
equipped with locks. All openings shall be provided with
grills or screens with openings.
13 Electrical safety (a) General:- The PCU shall include appropriate self-
protections protective and self-diagnostic features to protect itself and
RMC/ROSHNI/SOLAR/2026 Page 30 of
the PV array from damage in the event of PCU component
failure or parameters beyond the PCU’s safe operating
range due to internal or external causes. The self-
protective features shall not allow signals from the PCU
front panel to cause the PCU to be operated in a manner
that may be unsafe or damaging. Faults due to
malfunctioning within the PCU, including commutation
failure, shall be cleared by the PCU protective devices and
not by the existing site utility grid service circuit breaker.
(b) Over/Under voltage:-
Mains (Grid) over-under voltage and frequency protection.
Overvoltage protection against atmospheric lightning.
Protection against voltage fluctuations in the grid itself and
internal faults in the power conditioner, operational errors,
and switching transients.
MOV type surge arrestors on AC and DC terminals for over-
voltage protection from lightning-induced surges.
(c) Accidental open circuit:- Full protection against accidental
open circuit and reverse polarity at the input.
(d) Internal Faults:- Inbuilt protection for internal faults
including excess temperature, commutation failure,
overload, and cooling fan failure is obligatory
M (e) - Deleted -
(f) Earth Fault Supervision:- An integrated earth fault
detection device is provided to detect eventual earth fault
on the DC side and shall send a message to the supervisory
(g) Disconnection & Islanding: -
Disconnection of the PV generator in the event of loss of
the main grid supply is achieved by in-built protection
within the power conditioner. This may be achieved
through the rate of change of current, phase angle,
unbalanced voltages, or reactive load variants.
Operation outside the limits of power quality as described
in the technical data sheet shall cause the power
conditioner to disconnect the grid. Additional parameters
requiring automatic disconnection are:
- Neutral voltage displacement.
- Overcurrent.
- Earth fault &
- Reverse power.
In each of the above cases, tripping time shall be less than
0.5 seconds. Response time in case of grid failure due to
switch off or failure-based shutdown should be well within
time as per relevant IEC/BIS standards.
RMC/ROSHNI/SOLAR/2026 Page 31 of
(h) Automatic reconnection after the Grid failure resorts:- PCU
has a facility to reconnect the Inverter automatically to the
grid following the restoration of the grid, after grid failure
(i) Anti-islanding (Protection against Islanding of grid): The
PCU shall have anti-islanding protection in conformity to
IEEE 1547/UL 1741/ IEC 62116 or equivalent BIS standard.
14 Array Ground fault Provided
15 Operator interface LCD/LED and keypad operator interface, Menu driven.
16 Fault conditions Automatic fault conditions reset for all parameters like voltage,
frequency and /or blackout.
17 Control Logic via watchdog timers.
Failure detection
18 Parameter access All parameters are accessible through an industry-standard
communication link.
19 Inverter efficiency > 93% for an output ranging from 20% to full load,(as per IEC
Idling current at no load shall not exceed 2% of the full load
20 Parallel operation Provided & capable of interrupting line-to-line fault currents
with Grid and line to ground fault currents.
21 Unbalanced PCU can withstand an unbalanced output load to the extent of
Shut down / standby mode with its contact open under the
Standby mode following conditions before Attempting an automatic restart
after an appropriate time delay; insufficient solar power
a)Insufficient solar power input :
When the power available from the PV array is insufficient
to supply the losses of the PCU, the PCU shall go to a
standby/shutdown mode. The PCU control shall prevent
excessive cycling during rightly shut down or extended
periods of insufficient solar radiation.
b)Utility -Grid over or under voltage :
The PCU shall restart after an over-voltage or under- voltage
shut down when the utility grid voltage has returned to
within limits for a minimum of two minutes.
c)Utility-Grid over or under frequency :
The PCU shall restart after an over-frequency or
under-frequency shut down when the utility grid voltage has
returned to within limits for a minimum of two minutes.
23 THD THD shall be <5%, (For voltage <3% and for current <5%)
24 Circuit separation High voltage & power circuits separated from low voltage &
control circuits.
RMC/ROSHNI/SOLAR/2026 Page 32 of
25 Internal wiring Standard Cu wiring, with flame resistant insulation.
26 Cabling practice a) Cables: PVC Cu cables as per relevant international
(IEC) Standards.
b) Cable connections: suitable terminations.
c) PVC channel with covers to house the cables.
27 High voltage test The PCU can withstand a high voltage test of 2000 Vrms
between either the input or the output terminals and the
cabinet (chassis).
28 EMI PCU shall not produce EMI which cause malfunctioning of
(Electromagnetic electronic & electrical instruments including communication
interface) equipment which are located within the
facility in which the PCU is housed.
29 Display on front a) instantaneous PCU ac power output and the DC voltage
panel & current and power input.
indicators b) Accuracy of display : 3% of full-scale factor or better.
c) ) Display visible from outside the PCU enclosure.
d) ) Operational status of the PCU, alarms, trouble indicators,
and AC and DC disconnect switch positions.
e) ) shall also be communicated by appropriate messages or
indicator lights on the front cover of the PCU enclosure.
30 Emergency OFF The emergency OFF button is located at an appropriate position
M 31 Grounding PCU includes ground lugs for equipment and PV array
groundings. The DC circuit ground is a solid single-point
ground connection.
32 Exposed surfaces Exposed surfaces of ferrous parts are thoroughly cleaned,
primed, and painted, and suitably protected to survive a
nominal 30 years design life of the unit.
33 Factory Testing a) Tested to demonstrate the operation of its control system
and the ability to be automatically synchronized and
connected in parallel with utility service, before its
b) Operation of all controls, protective, and instrumentation
circuits, demonstrated by direct test if feasible or by
simulation operation conditions for all parameters that can
not be directly tested.
c) Demonstration of utility service interfaces protection
circuits and functions, including calibration and functional
trip tests of faults and isolation protection equipment.
d) Operation of start-up, disconnect, and shutdown, controls
also to be tested and demonstrated, stable operation of
the PCU and response to control signals shall also be
tested and demonstrated.
e) Factory testing includes measurement of phase currents,
RMC/ROSHNI/SOLAR/2026 Page 33 of
efficiencies, harmonic content, and power factor. All tests
shall be performed 25, 50, 75, and 100% of the rated
f) Factory test report (FTR): This should be supplied with the
unit after all tests. The FTR shall include a detailed
description of all parameters tested qualified and
34 Test certificates The PCU/ inverters should be tested from the MNRE approved
test centers / NABL /BIS /IEC accredited testing- calibration
laboratories. In case of imported power conditioning units,
these should be approved by international test houses.
35 Operating Modes a) Night or sleep mode: where the Inverter is almost
completely turned off, with just the timer and control
system still in operation (No-load losses Less than 1 % of
b) standby mode: where the control system continuously
monitors the output of the solar generator until the
pre-set value is exceeded.
c) Operational of MPP tracking mode: the control system
continuously adjusts the voltage of the generator to
optimize the power available. The power conditioner shall
automatically re-enter standby mode input power reduces
below the standby mode threshold. Front panel display
M d) providing the status of the PCU, including AC power output
& DC voltage and power input, and unit fault
36 Codes & Standards a) The power conditioning units/inverters should comply with
applicable IEC/ equivalent BIS standards for efficiency
measurements and environmental tests as per standard
codes IEC 61683/IS 61683 and IEC 60068- 2(1,2,14,30)
/Equivalent BIS Std.
b) The charge controller (if any) / MPPT units environmental
testing should qualify IEC 60068-2(1, 2, 14, 30)/Equivalent
BIS std. The junction boxes/enclosures should be more than
IP 66 for outdoor/indoor and as per relevant IEC
specifications.
37 Inverter / The ratio of the Inverter continuous power rating and the
Array Size ratio array peak power rating shall be between 80 to 90% or any
other value found more suitable. This is because a better
overall annual yield can be obtained by allowing the Inverter
to operate for longer periods closer to optimal efficiency.
38 Dual MPPT A dual Maximum power point tracker is integrated in the
power conditioner unit to maximize energy drawn from the
array. The MPPT shall be microprocessor-based to minimize
RMC/ROSHNI/SOLAR/2026 Page 34 of
power losses. The MPPT shall have provision (manual setting)
for constant voltage operation.
39 Data Logging a) All major parameters available on the digital bus and
System logging facility for energy auditing through the internal
microprocessor can be read on the digital front panel at
any time the current values, previous values for up to a
month, and the average values.
b) The following parameters shall be accessible via the
operating interface display :
- AC voltage AC output current Output power DC
- DC input current Time active Time disabled Time
Idle temperatures
c) Converter status.
d) Protective function limits (VIZ-AC over-voltage, AC under
voltage, Over frequency, under frequency, ground fault,
PV starting voltage, PV stopping voltage, over-voltage
delay, under-voltage delay over frequency, ground fault
delay, PV starting delay, PV stopping delay.
40 Arrangements for a) A remote monitoring system shall be included with this
Generation Data SPV plant.
Collection through b) Usually, such monitoring systems are connected and
Remote Monitoring synchronized with the inverters.
M System. c) Such monitoring services are provided by many leading
inverter manufacturers and also third-party service
d) The monitoring system should transmit the following data
in real-time to a central server and store it:-
▪ DC currents, voltages, and power. AC
currents, voltages, and power. Generated
daily, monthly, yearly, and cumulative kWh
▪ Ambient temperature, Error logs.
e) This data may be transmitted either using the available
LAN or GSM/GPRS/Wi-Fi or any other mode of
connectivity available at the site.
f) The contractor shall be responsible for data connectivity
for monitoring up to the warranty/ O&M period of the PV
system, after which, the Contractor shall transfer all
ownership rights, SIM card, account information,
passwords, instructions, Dongle etc. to RMC
g) The contractor shall ensure that RMC is aware of the
contracts required to maintain connectivity post-warranty/
h) This data shall be accessible by RMC through a secure login
RMC/ROSHNI/SOLAR/2026 Page 35 of
i) The stored data should be represented through hourly, daily,
monthly, etc. graphs and easily downloadable in .csv or .xls
41 Make Of Mindra, Power-One,ABB, Schneider, GROWATT, DELTA, KACO,
Havells, Aarusha,Luminous,Solis only.
PCU/Inverters. (The PCU/Inverter shall be of makes as above and
sales/service/spares support and strictly complying to latest
applicable IEC/BIS Standards. The make of the inverter shall be
selected such that service and spares support is readily available
in India. Standard OEM Guarantee/Warranty for the
PCU/Inverter shall be provided. A copy of the backup
Guarantee/Warranty letter must be produced with bid
documents from the OEM for providing such support for the
6.19 DC Distribution Board (DCDB):-
6.19.1 In the case of a single inverter, a DCDB shall be provided in between AJB and PCU.
6.19.2 The DCDB shall be outdoor/ indoor-type (as per site requirement) with IP 65 degrees of
protection, dust, vermin, insect and rodent proof. A suitable canopy shall be provided for the
M DCDB. The door shall be provided with a locking arrangement. The location of the DCDB shall
be decided in conjunction with the concerned EIC.
6.19.3 A DC MCCB of rating 1.5 times the short circuit current of the PV array shall be provided at
the output of the bus-bar, for connection to the PCU. All switchgear equipment shall be
standard make only. And the main switch should be provided for maintenance.
6.19.4 It is expected that the cables be secured in position within DCDB using the best engineering
practices and methods to avoid any stray cable running loose within DB. Wherever the cable
enters or exits the panel through a hole-in panel covers, proper bushing and glanding have to
6.19.5 Use of suitable quality of bolts, screws, and nuts to stay protected against corrosion due to
humid atmospheric conditions.
6.19.6 AC Distribution Board (ACDB):-
6.19.7 An ACDB shall be provided in between PCU and Load point.
6.19.8 The ACDB shall be outdoor/ indoor-type (as per site requirement) with IP 65 degrees of
protection, dust, vermin, insect, and rodent proof. A suitable canopy shall be provided for
the ACDB. The door shall be provided with a locking arrangement. The location of the DCDB
shall be decided in conjunction with the concerned EIC.
6.19.9 ACDB shall be provided with MCCB, panel mounted Multifunction meters (Amp,volt,Energy
meter, indication lamps, 5/15A Socket, spare terminal and Disconnectors adequate quantity
has to be maintain by bidder/contractor to use during O&M period, if required.
6.19.10 It shall have a necessary 3-ph., 4-pole MCCB/ACB/Contactors of Rating 1.5 times the rated
output current of the PCU, for connection to Grid of DISCOM.
6.19.11 To provide proper glanding and bushing wherever cable passes through the panel wall/ door.
RMC/ROSHNI/SOLAR/2026 Page 36 of
6.19.12 Use of corrosion-resistant nuts, bolts, and screws.
6.19.13 ACDB Panel‘s shall be metal clad, totally enclosed, rigid, wall mounted/floor mounted, air -
insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts,
50 Hz The panels shall be designed for minimum expected ambient temperature of
degrees Celsius, 85 present humidity and dusty weather. Indoor panels will have protection
of IP 54 or better All outdoor panels will have protection of IP 67. Shall be of Metal Sheet
with powder Coating of colour RAL-7032.
6.20 L.T. AC Bus & Panel:- AC power converted by the inverter is transferred and fed through the
appropriate size of cables, suggested by EIC, to 415 V 3- phase LT AC bus/L.T. panel of electrical
installation of building as per requirements.
6.21 LT Air Circuit Breaker/MCCB:- Appropriate & adequate Capacity 415V,3-phase,4-pole AC
indoor/outdoor air Circuit Breaker with control circuit and protection relay circuit, fuses,
annunciations and remote operating and controlling facility or Appropriate & adequate Capacity
415V,3-phase,4-pole AC indoor/outdoor MCCB as per the capacity of SPV plant and site
6.22 INTEGRATION OF PV POWER WITH GRID: - The output power from SPV would be fed to the
inverters which convert DC produced by SPV array to AC and feeds it into the main electricity
grid after synchronization. In case of grid failure, or low or high voltage, the solar PV system shall
be out of synchronization and shall be disconnected from the grid. 04 pole isolation of inverter
output to the grid must be provided with appropriate size of cable .
6.23 TOOLS & TACKLES AND SPARES : -
6.23.1 After completion of installation & commissioning of the power plant, necessary tools & tackles
are to be kept at the site by the bidder for maintenance purposes. List of tools and tackles to be
supplied by the bidder for approval of specifications and make from RMC.
6.23.2 A list of requisite spares in case of PCU/inverter comprising of a set of control logic cards, IGBT
driver cards, etc. Junction Boxes. Fuses, MOVs / arrestors, MCCBs, etc along with a spare set of
PV modules be indicated, shall be supplied along with the equipment. A minimum set of spares
shall be maintained in the plant itself for the entire period of warranty and Operation &
Maintenance, which upon its use shall be replenished.
6.24 DANGER BOARDS AND SIGNAGES: - Danger boards should be provided as and where necessary
as per IE Act. /IE rules as amended up to date. Text of the signage may be finalized in
consultation with EIC of RMC.
6.25 FIRE EXTINGUISHERS: - Portable fire extinguisher in the Inverter room for fire caused by
electrical short circuits shall be provided if suggested by EIC.
6.26 DRAWINGS & MANUALS: -
6.26.1 Two sets of Engineering, electrical drawings, and Installation and O&M manuals are to be
supplied. Bidders shall provide complete technical datasheets for each equipment giving
details of the specifications along with make/makes in their bid along with the basic design
of the power plant and power evacuation, synchronization along protection equipment.
6.26.2 For complete electro-mechanical works, bidders shall supply complete design, details,
RMC/ROSHNI/SOLAR/2026 Page 37 of
drawings, bill of material mentioning the quantity of each of the items consisting in the
system for approval to RMC before progressing with the installation work.
6.27 PLANNING AND DESIGNING: -
6.27.1 The bidder should carry out Shadow Analysis at the site and accordingly design strings &
arrays layout considering optimal usage of space, material, and labor. The bidder should
submit the array layout drawings along with Shadow Analysis Report to RMC for approval.
6.27.2 RMC reserves the right to modify the landscaping design, Layout, and specification of sub-
systems and components at any stage as per local site conditions/requirements.
6.27.3 The bidder shall submit a preliminary drawing for approval & based on any modification or
recommendation if any. The bidder has to submit 02 sets of final drawings for formal
approval to proceed with construction work.
6.28 DRAWINGS TO BE FURNISHED BY BIDDER AFTER WORK ORDER:-
6.28.1 The Contractor shall furnish the following drawings to obtain approval.
6.28.2 General arrangement and dimensioned layout.
6.28.3 Schematic drawing showing the requirement of SPV panel, Power conditioning Unit(s)/
inverter, Junction Boxes, AC and DC Distribution Boards, meters, etc.
6.28.4 Structural drawing along with foundation details for the structure.
6.28.5 Itemized bill of material for complete SPV plant covering all the components and associated
6.28.6 Layout of solar Power Array.
6.28.7 Shadow analysis of the roof.
6.29 SAFETY MEASURES: - The bidder shall take entire responsibility for electrical safety of the
M installation(s) including connectivity with the grid and follow all the safety rules & regulations
applicable as per Electricity Act, 2003 as amended up to date and CEA guidelines etc.
6.30 DISPLAY BOARD :- The bidder has to display a board at the site, mentioning the following:-
6.30.1 Plant Name, Capacity, Location, Type of Renewable Energy plant, Date of commissioning,
details of DISCOM, Financial Assistance details from SECI/MNRE/Govt. grant etc. and
suggested by EIC.
6.30.2 Approved vender List :-
Sr. No. Product Vendor(s)
(1) Inverter Mindra, Power-One,ABB, Schneider, GROWATT,
DELTA, KACO, Havells, Aarusha,Luminous,Solis.
(2) LT switch gear. Siemens, LK, Schneider, ABB, Havells.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with seal:
RMC/ROSHNI/SOLAR/2026 Page 38 of
7 Scope of work for O & M:-
7.1 Operation and Maintenance Guidelines for works of Grid Connected SPV Plant under this rate
For the optimal operation of an SPV plant, maintenance must be carried out regularly by
All the components should be kept clean. It should be ensured that all the
components are fastened well at their due place.
Maintenance guidelines for the agency for various components viz. solar panels,
inverter, wiring, etc. are discussed below: -
7.2 SOLAR PANELS: -
a) The SPV panels must be cleaned at least once every Fifteen days & maintain a register for same.
b) Any bird droppings or spots must be cleaned immediately.
c) Use water and a soft sponge or cloth for cleaning.
d) Do not use detergent or any abrasive material for panel cleaning.
e) Isopropyl alcohol may be used to remove oil or grease stains.
f) Do not spray water on the panel if the panel glass is cracked or the backside is perforated.
g) Wipe water from a module as soon as possible.
h) Use proper safety belts while cleaning modules at inclined roofs etc.
i) The modules should not be cleaned when they are excessively hot. Early morning is a
M particularly good time for module cleaning.
j) Check if there are any shade problems due to vegetation or new building. If there are, make
arrangements for removing the vegetation or moving the panels to a shade-free place.
k) Ensure that the module terminal connections are not exposed while cleaning; this poses a risk
of electric shock.
7.3 CABLES AND CONNECTION BOXES:-
a) Check the connections for corrosion and tightness.
b) Check the connection box to make sure that the wires are tight, and the water seals are not
c) There should be no vermin inside the box.
d) Check the cable-insulating sheath for cracks, breaks or burns. If the insulation is damaged,
replace the wire.
e) If the wire is outside the building, use wire with weather-resistant insulation.
f) Make sure that the wire is clamped properly and that it should not rub against any sharp edges
g) If some wire needs to be changed, make sure it is of proper rating and type.
h) Ensure that all underground cables are laid properly and enclosed in protective DWC pipes.
RMC/ROSHNI/SOLAR/2026 Page 39 of
7.4 INVERTER:-
a) The inverter should be installed in a clean, dry, and ventilated area which is separated from,
and not directly above, the battery bank.
b) Remove any excess dust in heat sinks and ventilation. This should only be done with a dry
cloth or brush.
c) Check that vermin has not infested the inverter. Typical signs of this include spider webs on
ventilation grills or wasps’ nests in heat sinks.
d) Check functionality, e.g. automatic disconnection upon loss of grid power supply, at least
e) Verify the state of DC/AC surge arrestors, cable connections, and circuit breakers.
7.5 SHUTTING DOWN THE SYSTEM: -
a) Disconnect system from all power sources in accordance with instructions for all other
components used in the system.
b) Completely cover system modules with an opaque material to prevent electricity from being
generated while disconnecting conductors.
c) To the extent possible, a system shutdown will not be done during daytime or peak
7.6 Inspection and maintenance schedule for agency: -
Component Activity Description Interval
PV Module Cleaning Clean any bird droppings/ dark Immediately
M spots on module
Cleaning Clean PV modules with plain At least once
water or mild dish washing every fifteen days.
detergent. Do not use brushes, (If PV modules are not
any types of solvents, abrasives, cleaned within fifteen
or harsh detergents. days then a penalty will
be imposed at the rate
of Rs. 200=00 per day
Inspection Use an infrared camera to Annual
inspect for hot spots; bypass
PV Array Inspection Check the PV modules and rack Monthly
for any damage.
Note down location and serial
number of damaged modules
Inspection Determine if any new objects, Monthly
such as vegetation growth, are
causing shading of the array and
move them if possible.
RMC/ROSHNI/SOLAR/2026 Page 40 of
Vermin Removal Remove bird nests or vermin Monthly
from array and rack area.
Junction Boxes Inspection Inspect electrical boxes for Monthly
corrosion or intrusion of water
Seal boxes if required.
Check the position of switches
Check operation of all protection
Wiring Inspection Inspect cabling for signs of Monthly
cracks, defects, loose
connections, overheating,
arcing, short or open circuits,
and ground faults.
Inverter Inspection Observe. Monthly
Instantaneous operational
indicators on the faceplate of
the inverter to ensure that the
amount of power being
generated is typical of the
M Inspect Inverter housing or
shelter for physical
maintenance, if required.
Inverter Service Clean or replace any air filters. As needed
Instruments Validation Spot-check monitoring 3 - Months
instruments with standard
instruments to ensure that they
are operational and within
specifications.
Plant Monitoring Daily Operation and Daily
Performance Monitoring
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with seal:
RMC/ROSHNI/SOLAR/2026 Page 41 of
8 Reference standards:-
Quality certification and standards for grid-connected rooftop solar PV systems are essential for the
successful implementation of this technology. This grid-connected solar PV system/plant must
conform to the relevant standards and certifications given below:-
Solar PV modules/panels
IEC 61215/ IS 14286 Design Qualification and Type Approval for Crystalline Silicon
Terrestrial Photovoltaic (PV) Modules
IEC 61853- Part 1/ IS Photovoltaic (PV) module performance testing and energy
16170: Part 1 rating –: Irradiance and temperature performance
measurements, and power rating
IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1:
Requirements for Construction, Part 2: Requirements for
IEC 62804 Photovoltaic (PV) modules - Test methods for the detection of
potential-induced degradation. IEC TS 62804-1: Part 1:
Crystalline silicon
(mandatory for applications where the system voltage is > 600 VDC
and advisory for installations where the system voltage is <
IEC 62759-1 Photovoltaic (PV) modules – Transportation testing, Part 1:
Transportation and shipping of module package units
Solar PV Inverter
IEC 62109-1, IEC 62109-2 Safety of power converters for use in photovoltaic power systems –
Part 1: General requirements, and Safety of power
for use in photovoltaic power systems
Part 2: Particular requirements for inverters. Safety
IEC/IS 61683 (as Photovoltaic Systems – Power conditioners: Procedure for
applicable Measuring Efficiency (10%, 25%, 50%, 75% & 90-100%
Loading Conditions)
BS EN 50530 The overall efficiency of grid-connected photovoltaic
(as applicable) inverters:
This European Standard provides a procedure for the measurement
of the accuracy of the maximum power point tracking (MPPT) of
inverters, which are used in grid-
connected photovoltaic systems. In that case, the inverter
energizes a low voltage grid of stable AC voltage and
RMC/ROSHNI/SOLAR/2026 Page 42 of
constant frequency. Both the static and dynamic MPPT efficiency
IEC 62116/ UL 1741/ IEEE Utility-interconnected Photovoltaic Inverters - Test
1547 Procedure of Islanding Prevention Measures
(as applicable)
IEC 60255-27 Measuring relays and protection equipment – Part 27:
Product safety requirements
IEC 60068-2 (1, 2, 14, 27, Environmental Testing of PV System – Power Conditioners and
30 & 64) Inverters
a)IEC 60068-2-1: Environmental testing - Part 2-1: Tests -
b)IEC 60068-2-2: Environmental testing - Part 2-2: Tests -
Test B: Dry heat
c)IEC 60068-2-14: Environmental testing - Part 2-14: Tests -
Test N: Change of temperature
d)IEC 60068-2-27: Environmental testing - Part 2-27: Tests -
Test Ea and guidance: Shock
e) IEC 60068-2-30: Environmental testing - Part 2-30: Tests -
Test Db: Damp heat, cyclic (12 h + 12 h cycle)
f)IEC 60068-2-64: Environmental testing - Part 2-64: Tests -
Test Fh: Vibration, broadband random and guidance
IEC 61000 – 2,3,5 Electromagnetic Interference (EMI) and Electromagnetic
M (as applicable) Compatibility (EMC) testing of PV Inverters
IS/IEC 60947 (Part 1, 2 & General safety requirements for connectors, switches, circuit
3), EN 50521 breakers (AC/DC):
a) Low-voltage Switchgear and Control-gear, Part 1: General
b) Low-Voltage Switchgear and Control-gear, Part 2: Circuit
c) Low-voltage switchgear and Control-gear, Part 3:
Switches, Disconnector, switch-Disconnector, and fuse-
combination units
d)EN 50521: Connectors for photovoltaic systems – Safety
requirements and tests
IEC 60269-6 Low-voltage fuses - Part 6: Supplementary requirements for
fuse-links for the protection of solar photovoltaic energy systems
Surge Arrestors
IEC 62305-4 Lightening Protection Standard
RMC/ROSHNI/SOLAR/2026 Page 43 of
IEC 60364-5-53/ IS Electrical installations of buildings - Part 5-53: Selection and
15086-5 (SPD) erection of electrical equipment - Isolation, switching, and
IEC 61643-11:2011 Low-voltage surge protective devices - Part 11: Surge protective
devices connected to low-voltage power systems
- Requirements and test methods
IEC 60227/IS 694, IEC General test and measuring method for PVC (Polyvinyl chloride)
60502/IS 1554 (Part 1 & insulated cables (for working voltages up to and including 1100 V,
2)/ IEC69947 and UV resistant for outdoor installation)
BS EN 50618 Electric cables for photovoltaic systems (BT(DE/NOT)258),
mainly for DC Cables
Earthing /Lightning
IEC 62561 Series IEC 62561-1 Lightning protection system components (LPSC) -
(Chemical earthing) Part 1: Requirements for connection components IEC 62561-2
Lightning protection system components (LPSC) - Part 2:
Requirements for conductors and earth electrodes IEC 62561-7
Lightning protection system components (LPSC) - Part 7:
Requirements for earthing enhancing compounds
M Junction Boxes
IEC 60529 Junction boxes and solar panel terminal boxes shall be of
the thermo-plastic type with IP 65 protection for outdoor use,
and IP 54 protection for indoor use
Performance monitoring
IEC 61724 IEC 61724-1:2021 outlines terminology, equipment, and methods
for performance monitoring and analysis of photovoltaic (PV)
-Monitoring of bifacial systems is required.
-Irradiance sensor requirement.
- Soiling measurement is updated based on new
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 44 of
9. IMPORTANT NOTE FOR PRICE BID:
1) The bid is percentage rate bid.
Rates and prices received in any other formats will be rejected and the Bids will be disqualified.
3) The quoted rates should be inclusive of all taxes(Excluding GST) and duties.
4) RMC will consider the Road & Building Department Schedule of rate for Reference.
5) For SITC Work Price consider as per Schedule - A: Design SITC & 10 year O&M Work.
6) For RMC Existing Solar roof top plant operation and maintenance rate consider as per Schedule - B:
Operation, Preventive Maintenance and Servicing.
7) Bidder submit a only percentage rate for all work (i.e.SITC and O&M).
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 45 of
Design SITC & 10 year O&M Work
PART-1 NEW Solar Power Project
Unit Cost Cost of Labour Total
Item No Description of
1.1.1 Supply, Installation, Testing & Commissioning of
following size of Grid Tied Solar Power Plant [With
10 (Ten) years comprehensive O&M] with Solar
Panels (ALMM approved): Frame Material :
Anodized Aluminum alloy Frame With Twin Wall
Profile, Front Cover : High Transmission Low-Iron
Tempered Glass (AR Coated), High efficiency and
positive power tolerance Pmax: 0/+5, Module
Efficiency should be approx. 19.5%-22%, Normal
operating temperature 45'C, Junction Box with
Waterproof IP67 & MC4 Compatible and Enclosed
with Bypass diodes, 100% Electroluminescence test to
ensure error free Modules, Thep. temp. co-efficient of
the PV module shall equal or better than
-0.45%/degree C. Solar PV modules of minimum fill
factor 75% to be used. Unit Production:- More than
Unit /kw /day (Actual)(1Year Avg) With 10 year
Product warranty and 25 year Linear Power Warranty
includes all mechanical and electrical parameters of
M the Solar panel. Modules must be complied to the
DCR(Domestic content requirements). The Ration
of AC to DC is 5:6 for the Installation capacity which
are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000
V , Max efficiency: 97.5% - 98.9%, O/p Frequency:
50/60Hz, Operating Altitude (m) ≤4000, O/p Power
Factor: ~1, O/P THDi: <3%, Operating Temperature
Range: -25~60°C, Integrated protection of Inverter are
Anti-islanding Protection, Input Reverse Polarity
Protection, Insulation Resistor Detection, Ground fault
protection, Residual Current Monitoring Unit, Output
Over Current Protection, Output Short Circuit
Protection, Output Over Voltage Protection, PV array
string fault Protection. Protection Degree: IP65, User
Interface LCD & APP, Datalogger & Communication:
RMC/ROSHNI/SOLAR/2026 Page 46 of
Integrated, Input Reverse Polarity Protection
Integrated, Insulation Resistor Detection Integrated,
Residual Current Monitoring Unit Integrated, Output
Over Current Protection Integrated, Output Short
Circuit Protection Integrated, Output Over Voltage
Protection Integrated, Protection Degree: IP65, User
Interface LCD & APP,Datalogger & Communication:
GPRS / Wi-Fi, Module Mounting Structure: The
mounting (Rectangular pipe / square pipe / circular
pipe) with requisite cross bars, nuts and bolts, etc. shall
be Hot deep galvanized with minimum 80micron
coating. The Rectangular / square /circular hollow pipe
section used for the structure should have a minimum
thickness of 2.0 mm. other than above, the material
thickness should be minimum 2.5 mm. A certificate of
a structural engineer certifying the strength and
stability of the mounting structure to withstand the
weight and wind speed of 150 km/hour throughout the
life span of 25 years of the system, shall be submitted
by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation
solar panel mounting, the structure should be suitable
for carry the load of solar panel,wiring, sprinkler
system etc. with necessary foundation work/wall
mount, j bolt, anchor fastner etc. the nut bolt used for
installation of structure should be (SS 304) quality.The
ground clearance of the bottom most edge of solar
M panel shall not be less than 300 mm to 1200 mm or as
per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should
b. Rafter - The minimum section (thickness) should be
c. Purlin - The minimum section (thickness) should be
40MM * 40MM Balance of System with necessary
Switchgears (Suitable size and protection of ACDB &
DCDB), inter connecting wiring, earthing system as
per the CEIG drawing approval, lightning arrester
system as per the CEIG drawing approval, all
liasoning work with various gov. department like state
nodal agency,DISCOM & CEIG is included in agency
(Excluding All charges namely Service connection
estimate changes, Meter testing Charges and system
stability/strengthening charges.)
(A) Grid Tied Solar Power System: 1 - 6 kW PER 44492.00 1695.00
(Single phase) KW
RMC/ROSHNI/SOLAR/2026 Page 47 of
(B) Grid Tied Solar Power System: 7 - 10 kW (3 - PER 41950.00 1695.00
(C ) Grid Tied Solar Power System: 11 - 25 kW (3 PER 40509.00 1526.00
(D) Grid Tied Solar Power System: 26 - 50 kW (3 PER 40255.00 1484.00
(E) Grid Tied Solar Power System: 51 - 100 kW PER 38984.00 1272.00
(F) Grid Tied Solar Power System: 101 - 250 kW PER 38136.00 1272.00
(G) Grid Tied Solar Power System: 251 - 500 kW PER 37712.00 1060.00
RMC/ROSHNI/SOLAR/2026 Page 48 of
Schedule - B: Operation, Preventive Maintenance & Service
PART-2 SOLAR PANEL
14.2.1 S.I.T.C of Poly Crystline/Mono Crystline PV Module
(ALMM approved) with 72 Cells - 150 Cells or More
Frame Material : Anodized Aluminum alloy Frame With
Twin Wall Profile, Front Cover : High Transmission
Low-Iron Tempered Glass (AR Coated), High efficency
and positive power tolerance Pmax: 0/+5, Module
Efficiency should be approx. 18%-21%, Normal
operating temperature 45'C, Junction Box with
Waterproof IP67 & MC4 Compatible and Enclosed with
Bypass diodes 100% Electroluminescence test to
ensure error free Modules, Thw temp. co-efficient of the
PV module shall equal or better than -0.45%/degree C.
Solar PV modules of minimum fill factor 75% to be
used. Unit Production:- 4 to 5 Unit /kw /day
(Actual)(1Year Avg) With 10 year Product warranty and
25 year Linear Power Warranty.
(A) Moudule o/p Range: 250 - 335 watt, Maximum PER WATT 27.00 2.00
Power Voltage Vmpp: 26 -38 V, Maximum Power
Current Impp: 8 - 8.9 A
(B) Moudule o/p Range: 365 - 390 watt, Maximum PER WATT 28.00 2.00
Power Voltage Vmpp: 39 - 40 V, Maximum Power
M Current Impp: 9 - 10 A
(C) Moudule o/p Range: 435 - 455 watt, Maximum PER WATT 29.00 2.00
Power Voltage Vmpp: 40 - 42 V, Maximum Power
Current Impp: 10.5 - 11 A
(D) Moudule o/p Range: 480 - 505 watt, Maximum PER WATT 30.00 2.00
Power Voltage Vmpp: 41 - 42 V, Maximum Power
Current Impp: 12 - 13 A
(E) Moudule o/p Range: 520 - 545 watt, Maximum PER WATT 31.00 2.00
Power Voltage Vmpp: 41 - 42 V, Maximum Power
Current Impp: 12.5 - 13 A
RMC/ROSHNI/SOLAR/2026 Page 49 of
PART - 3 INVERTERS
14.3.1 S.I.T.C of Solar Inverter Gried Tied: MPPT
Range: 80-1000 V, Max efficiency: 97.5% -
98.9%, O/p Frequency: 50/60Hz, Operating
Altitude (m) ≤4000, O/p Power Factor: ~1, O/P
THDi: <3%, Operating Tempreture Range:
-25~60°C, Anti-islanding Protection: Integrated,
Input Reverse Polarity Protection Integrated,
Insulation Resistor Detection Integrated, Residual
Current Monitoring Unit Integrated, Output Over
Current Protection Integrated, Output Short
Circuit Protection Integrated, Output Over
Voltage Protection Integrated, Protection Degree:
IP65, User Interface LCD & APP,Datalogger &
Communication: GPRS / Wi-Fi (Optional)
(A) Solar Inverter: 1 kW to 3 kW: Max. input Per 9.00 1.00
Current: 10A, Max DC i/p Power: 1300-3900W & Watt
Nominal o/p Power: 1000-3000W Nomimal O/p
Voltage: 220/230 V 1-Phase, Nominal O/p
Current: 5-13.5A.
(B) Solar Inverter: 3 kW to 6 kW: Max. input Per 9.00 1.00
Current: 11A, Max DC i/p Power: 3900-7200W & Watt
Nominal o/p Power: 3000-6000W, Nomimal O/p
Voltage: 220/230 V 1-Phase, Nominal O/p
Current: 13.6-27.3A.
M (C) Solar Inverter: 6 kW to 15 kW: Max. input
Current: 22 A, Max DC i/p Power: 7800-19500 W &
Nominal o/p Power: 6000-16500 W,
(D) Solar Inverter: 15 kW to 25 kW: Max. Per 8.00 1.00
input Current: 27 A, Max DC i/p Power: 22100- Watt
32500W & Nominal o/p Power: 15000-25000W,
(E) Solar Inverter: 25 kW to 50 kW: Max. input Per 7.00 1.00
Current: 30 A, Max DC i/p Power: 22100-51500 W &
Nominal o/p Power: 25000-50000W,
(F) Solar Inverter: 50 kW to 100 kW: Max. Per 7.00 1.00
input Current: 40 A, Max DC i/p Power: 66500- 130500 Watt
W & Nominal o/p Power: 50000-
(G) Solar Inverter: 100 kW to 136 kW: Max. input Per 7.00 1.00
Current: 40 A, Max DC i/p Power: 130.5 - Watt
176.5 KW & Nominal o/p Power: 100-136 KW,
(H) Solar Inverter: 136 kW to 200 kW: Max. input Per 7.00 1.00
Current: 40 A, Max DC i/p Power: 176.5- Watt
260KW & Nominal o/p Power: 136-200KW,
RMC/ROSHNI/SOLAR/2026 Page 50 of
PART - 4 STRUCTURE
1.4.1 Supplying and Erecting Seamless Box Pipe of suitable PER KG 128.00 2.00
size for rooftop solar installations with good stability agaist
wind, Thickness 2 mm and 80 micron, Hot Dipped Galvanized
steel coils. suitable arrangement for base plate for
foundation , solar panel mounting, the structure should be
suitable for carry the load of solar panel,wiring, sprinkler
system etc. with necessary foundation work/wall mount, j
bolt, anchor fastner etc. the nut bolt used for installation of
structure should be (SS 304) quality.
box. pipe ref. size (A) 40 x 40 x 2mm, (B) 50 × 50 × 2mm, (C.)
1.4.2 Supplying and Erecting 'C' Channel of suitable size for PER KG 149.00 2.00
rooftop solar installations with good stability agaist wind,
Hot Dipped Galvanized steel coils. It have suitable
arrangement for base plate for foundation Screw
Arrangement , solar panel mounting, the structure should be
suitable for carry the load of solar panel,wiring, sprinkler
system etc. with necessary foundation work/wall mount, j
bolt, anchor fastner etc. the nut bolt used for installtion of
stucture should be (SS 304)
1.4.3 Supplying and Erecting Stainless Steel Nut Bolt (SS 304) for Ea. 39.00 5.00
Installation of Solar PV Module, Structures, and other related
items with required size as engineer in charge demands for
project Size, length upto 10 x 150 mm
PART - 5 DC Cables
1.5.1 DC Cable: Electron beam cross linked compound,UV,
Ozone, Temperature & Hydrolysis resistant Flame
Retardant, Low Smoke Excellent Encapsulation
Very long / Service life > 25 Standards /
Material Properties: Fire performance :
Smoke emission : IEC 61034/ EN 50268-2 Halogen Free:
Toxicity: EN 50305, ITC – Index <3 Ozone
Resistant : EN50396
Weathering UV: HD 605/A1 or DIN 53367 Approvals
with suitable sized of PVC pipe(ISI Mark) and
Clamps,Shadels,Lugs.
(A) 1 core 4 sqmm copper DC cable Colour PER 73.00 3.00
(B) 1 core 4 sqmm copper DC cable Colour PER 73.00 3.00
RMC/ROSHNI/SOLAR/2026 Page 51 of
1.6.1 S,I,T.C of Distribution board from AC Side, ACDB 1-Phase - Ea. 2967.00 424.00
1 kW - 6 kW: AC MCB: 16- 25A, 2POLE, C-CURVE, 10KA,
40KA, 1P+N, TERMINAL/END PLATE/END CLAMP: 6SQMM
(KUT6) FOR OUTPUT, AC
Interconnection with suitable size wire/cable, All
switchgears and connection are enclosed with IP66
Enclosure which have transperant cover in frontside to
view and operate the MCB position.
1.6.2 S,I,T.C of Distribution board from AC Side Ea. 6356.00 424.00
,ACDB 3-Phase - 6 kW - 10 kW: AC MCB 20- 32A, 4POLE, C
10KA, AC SPD 40KA, 3P+N, TERMINAL/END PLATE/END
CLAMP: 6SQMM (KUT10) FOR
OUTPUT,AC Interconnection with suitable size wire/cable.
All switchgears and connection are enclosed with IP66
Enclosure which have transperant cover in frontside to
view and operate the MCB position.
1.6.3 S.I.T.C of Distribution board from AC Side, ACDB 3-Phase - Ea. 7628.00 594.00
11 kW - 20 kW: AC1 DUTY CONTRACTOR‐40A 4P,
100A MCCB 4P(Cat III), 3 PHASE SPD, VOLTAGE
MONITORING RELAY,
ELR WITH CBCT, PHASE INDICATING LAMP, POWER CABLE
OTHER ACCESSORIES, All switchgears and connection are
enclosed with IP66 Enclosure
and operate the MCB position.
S.I.T.C of Distribution board from AC Side Ea. 17373.00 594.00
,ACDB 3-Phase - 21 kW - 50 kW: AC1 DUTY
CONTRACTOR‐80A 4P,
100A MCCB 4P(Cat III), 3 PHASE SPD, VOLTAGE
MONITORING RELAY,
ELR WITH CBCT, PHASE INDICATING LAMP, POWER CABLE
OTHER ACCESSORIES, All switchgears and connection are
enclosed with IP66 Enclosure
and operate the position.
1.6.5 S.I.T.C of Distribution board from AC Side , ACDB 3-Phase - Ea. 41102.00 848.00
51 kW - 100 kW: which includes AC1 DUTY
CONTRACTOR‐200A
4P, 200A MCCB 4P(Cat III) WITH SPREADER & SHUNT,
VOLTAGE MONITORING RELAY, ELR WITH CBCT, PHASE
INDICATING LAMP, POWER CABLE &
OTHER ACCESSORIES. All switchgears and connection are
enclosed with IP66 Enclosure and operate the position.
RMC/ROSHNI/SOLAR/2026 Page 52 of
1.6.6 S.I.T.C of Distribution board from AC Side , ACDB 3-Phase - Ea. 55509.00 848.00
101 kW - 200 kW: AC1 DUTY CONTRACTOR‐300A
4P, 200A MCCB 4P (Cat III)WITH SPREADER & SHUNT,
VOLTAGE MONITORING RELAY, ELR WITH CBCT, PHASE
INDICATING LAMP, POWER CABLE &
OTHER ACCESSORIES. All switch gears and connection are
enclosed with IP66 Enclosure and operate the position.
1.7.1 S.I.T.C of Distributiob System DC Side, DCDB 1-Phase - 1 Ea. 3390.00 424.00
kW - 3.5 kW(1in:1out) : DC MCB 500V, 16A, DC
SPD 600V, TYPE
TERMINAL/END,PLATE/END CLAMP:
(KUT6) FOR OUTPUT, DC CABLE With
suitable size of interconnection.
1.7.2 S.I.T.C of Distributiob System DC Side, DCDB - Ea. 5509.00 424.00
3.6 kW - 6 kW (2in:2out) : DC MCB 500V, 16A, DC SPD
TYPE 2, TERMINAL/END PLATE/END CLAMP 4SQMM
(KUT6), GREEN (KUT6), DC CABLE
With suitable size of interconnection.
1.7.3 S.I.T.C of Distributiob System DC Side, DCDB - 6 kW - 10 Ea. 7204.00 424.00
kW (3in:3out) : DC MCB 500V, 16A, DC SPD
1000V, TYPE 2, TERMINAL/END PLATE/END CLAMP
4SQMM (KUT6), GREEN (KUT6), DC CABLE
With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 10 kW - Ea. 9746.00 594.00
20 kW (4in:4out) : Input Mcb - 1000 V, 16 Amp,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
1.7.5 S.I.T.C of Distributiob System DC Side, DCDB Ea. 13984.00 594.00
- 20 kW - 25 kW (5in:5out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
1.7.6 S.I.T.C of Distributiob System DC Side, DCDB - 35 kW - Ea. 19916.00 594.00
40 kW (8in:8out) : Input Mcb - 1000 V, 16 Amp,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
RMC/ROSHNI/SOLAR/2026 Page 53 of
1.7.7 S.I.T.C of Distributiob System DC Side, DCDB - 50 kW - Ea. 24153.00 594.00
65 kW (12in:12out) : Input Mcb - 1000 V, 16 Amp,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
1.7.8 S.I.T.C of Distributiob System DC Side, DCDB - 60 kW - Ea. 25848.00 848.00
80 kW (16in:16out) : Input Mcb - 1000 V, 16 Amp,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
1.7.9 S.I.T.C of Distributiob System DC Side, DCDB Ea. 31780.00 848.00
- 80 kW - 300 kW (18in:18out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE
TERMINAL/END,PLATE/END CLAMP: 4SQMM (KUT6)
FOR OUTPUT, DC CABLE
With suitable size of interconnection.
PART - 8 Installation Accessories
1.8.1 Supplying & Errecting MC4 Connector Male - Female Ea. 50.00 2.00
Set for Solar DC Cable which is installed in Solar
PV-module/Inverter/DCDB
PART - 9 Water Sprinkler System
1.9.1 Providing & erecting Automatic solar panel cleaning
M system for solar power projects which includes
necessary plumbing work (UPVC pipes and
accessories) from source of water to project site (upto
30 meters),Suitable size of sub mercible/ open well
motor, necessary wiring for motor and sprinkler
system with safety, timer circuit for automatically
on/off the sprinkler system, necessary size and
number of nozzles/JET (minimum 1 Nozzle/Jet per
(A) 1KW-5KW Cleaning System PER 3390.00 424.00
(B) 5KW-10KW Cleaning System PER 3390.00 424.00
(C ) 11KW-20KW Cleaning System PER 3221.00 424.00
(D) 21KW-50KW Cleaning System PER 3221.00 424.00
(E) 51KW-100KW Cleaning System PER 3094.00 424.00
(F) 101KW-200KW Cleaning System PER 3094.00 424.00
RMC/ROSHNI/SOLAR/2026 Page 54 of
14.10.1 The all inclusive comprehencive annual maintance
contract cost covers yearly maintanance of solar Pv
Modules, Inverter, wiring,earthing,switchgears, etc with
material and labour cost including preventive
maintanance.The cost covers entire installation. AMC also
includes monthly site visit and inspection of project with
submission of inspection and solar generation report. All
parts should be replaced/repaired if found faulty within
specified time. Agency has to provide necessory licening
work for warranty,power,Bidirectional meter etc
(A) 1KW-10KW System PER KW 0.00 5509.00
(B) 11KW-20KW System PER KW 0.00 5085.00
(C ) 21KW-50KW System PER KW 0.00 4238.00
(D) 51KW-100KW System PER KW 0.00 3814.00
(E) 101KW-200KW System PER KW 0.00 3390.00
M WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of Tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 55 of
Technical Formats (to be submitted by bidders)
Appendix 1: Details of Bidder
01. Name of bidder:-
02. full address:-
03. Name of a contact person with a phone, fax nos. and email address:-
04. Whether the firm is a Joint-Stock Co., Undivided Hindu Family, Individual, or Registered
Partnership Firm. (Attested copy of Deeds or Articles of Association to be enclosed) :-
05. Name or person holding the Power of Attorney. (Attested copy of Power of Attorney to be
06. Name of Bankers and Full Address: -
07. Details of Technical and Supervisory Staff proposed to be deployed on this Project.
b. Qualification
d. Experience in years
M e. Date of Joining the Firm
Signature of Bidder with a seal:
RMC/ROSHNI/SOLAR/2026 Page 56 of
Appendix 2 : CHECKLIST SHEEET TO BE FILLED UP BY VENDORS
Sr. Technical RMC's Requirement as per Tender Compliance from
No. Specifications/Description Vendor. (Please
NO against each
1 EMD ………………… Online/offline
2 Tender Fee ……………….. Online/offline
3 The cover of technical bid As per the requirements of this tender
documents shall be duly sealed, document.
& superscribed the name of
4 All tender documents are signed As per the requirements of this tender
and sealed at every page document.
5 Documents regarding Tech. & As per the requirements of this tender
Financial Qualification as per document.
document list of chapter No.2.
6 Solar PV Module As per requirements of the technical
specification sheet of this tender
7 PCU/Inverter As per requirements of the technical
specification sheet of this tender
8 AC and DC Cabling/Terminations To be complied in totality as per Technical
and Sizing Specifications sheet.
9 Array Junction Box/AC Junction To be complied in totality as per Technical
Box/ACDB/DC Combiner Specifications sheet.
Box/Fuses/Terminal Blocks
Signature of Bidder with a seal:
RMC/ROSHNI/SOLAR/2026 Page 57 of
Appendix 3 : LIST OF MAINTENANCE TOOLS AND TACKLES
The Bidder shall give below the list of necessary maintenance tools and tackles :-
SR. NO. PARTICULARS NUMBERS
Signature of Bidder with seal:-
RMC/ROSHNI/SOLAR/2026 Page 58 of
Appendix 4 - TENDER DECLARATION FORM
Name of work :-
Reference :-
a) I/We the undersigned has carefully gone through and clearly understood the e-Tender documents
comprising Notice Inviting e-Tenders, Articles of Agreement, Scope of work, Definition of terms,
Instructions to e-Bidder, Conditions of Contract, Special Conditions of Contract, Appendixes,
Specifications, furnished by RAJKOT MUNICIPAL CORPORATION, RAJKOT. I/We have satisfied
myself/ourselves as to the location of the site.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance
with the specifications, designs, drawings and instructions in writing referred to in the said documents and with
such materials as are provided for, at the respective rates which I/we have quoted in the (PRICE BID) or at such
other rates as may be fixed under the provisions of these conditions.
In the event of this e-tender being accepted I/we agree to enter into an agreement as and when required and
execute the contract, according to your Form of Agreement or in default whereof I/we bind myself/ourselves to
forfeits the ‘Earnest Money Deposit’.
I/We understand that if I/We shall not enter in agreement within ten days or decided by RMC from the date of
receipt of a letter of acceptance, you will forfeit the Earnest Money paid by me/us and take the necessary action
I/We have enclosed a DRAFT as an “Earnest Money Deposit”, for the sum of Rs. the full value
of which is to be absolutely forfeited to the Employer should I/We fail to commence the works specified.
Otherwise, the Employer shall retain the said sum, as on account of such `Security Deposit’ as provided for in the
aforesaid documents.
I/We agree not to employ Subcontractors other than those that may be approved in accordance with conditions
in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any e-tender, which you may receive.
I/We shall refer all disputes arising out of or relating to the agreement to the arbitration in accordance with
conditions of the contract.
I/We am/are bound to execute the job if the work order is issued within 180 days from the date of opening of the
I/We agree to pay the Government Income-Tax, GST, Sales Tax (Central and State) Sales tax on Construction,
Octroi duties and other taxes prevailing from time to time on such items on which the same are leviable and the
rates quoted by me/us are inclusive of the same.
Yours faithfully,
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 59 of
(Details of work of similar type and magnitude carried out by the Bidder in last seven years )
Name of the bidder / Company
Sr. Name of Name of owner Tendered Time for and Special
No. work with address, Cost in Rs. Date of Features
phone and fax No. Completion
Note: A photo copy of completion certificate issued by competent authority of owner shall have to be
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 60 of
Details of works in hand as on the date of submission of the Tender
Name of the bidder / Company:-
Sr. Name of Place & Works on Hand Works Tendered for Remarks
No. work country
Tend Cost Date Tend Cost Date
Cost Remai Com Cost Remai Comp
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 61 of
Details of Technical Personnel with the Bidder
Name of the bidder / Company :-
Sr. Description Name Qualification Professional Remarks
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 62 of
FORM OF CONTRACT AGREEMENT
THIS AGREEMENT made this day of by and
between the RMC hereinafter called RMC and
hereinafter called "The Contractor". WITNESSETH
Whereas, RMC has caused Specifications Drawings and other Contract documents to be prepared for
certain works described as and
Whereas Contractor has offered to perform the proposed works in accordance with the terms of the
Contract Documents.
Now, therefore, in consideration of the natural covenants and Agreements of the parties herein
contained and to be performed, contractor hereby agrees to complete the works at prices and on the
Terms and Conditions herein contained and RMC hereby employees the contractor and agrees to pay
him the contract prices provided herein for the fulfillment of the works and the performance of the
covenants set forth herein.
The further terms, conditions and covenants of the contract, are set forth in the following exhibit
parts each of which is attached hereto and by this reference made a part hereof.
(a) The said tender and Appendix there.
(b) The Pre-qualification criteria of bid (Volume I).
(c) The general and special Conditions of Contract.
(d) The instructions to the bidder.
(e) The Guarantee Bond.
(f) The technical specifications and Drawings.
(g) The corrigendum/addenda/Amendments.
(h) The Price Bid (Volume II)
(i) All Correspondence
The consideration of the payments to be made by the RMC to the Contractor as hereinafter
mentioned, the contractor hereby covenants with the RMC to execution the works in conformity with
the provision of the Contract.
The RMC hereby covenants to pay the contractor in consideration of the diligent and proper
execution of the works the contract price at the time and in the manner prescribed by the Contract.
IN WITNESS WHEREOF, this Agreement has been executed in duplicate on the day and year first above
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 63 of
FORM OF PERFORMANCE SECURITY (BANK GUARANTEE)
To: (name of Employer)
(address of Employer)
WHEREAS (name and address of Contractor) (hereinafter called
“the Contractor”) has undertaken, in pursuance of Contract No. dated
to execute (name of Contract and brief description of
Works) (hereinafter called “the Contract”);
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as
security for compliance with his obligations in accordance with the Contract;
AND WHEREAS we have agreed to give the Contractor such as Bank Guarantee;
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you as
principal obligator, on behalf of the Contractor, un conditionally and irrevocably guarantee the
payment of an amount to total of (amount of
Guarantee) (amount in words), such sum being payable in
the types and proportions- of currencies in which the Contract Price is payable, and we
undertake to pay you, upon your first written demand and without cavil or argument, any sum
or sums within the limits of (amount of Guarantee) as aforesaid without your
M needing to prove or to show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the Contractor before
presenting us with the demand.
We further agree that no change or addition to or other modification of the terms of the
Contract or of the Works to be performed there under or of any of the Contract documents
which may be made between you and the Contractor shall in any way release us from any
liability under this guarantee, and we hereby waive notice of any such change, addition or
this guarantee shall be valid until the date of issue of the performance certificate.
SIGNATURE AND SEAL OF THE GUARANTOR
RMC/ROSHNI/SOLAR/2026 Page 64 of
DECLARATION FOR NOT BLACK LISTED OR TERMINATED OR DEBARRED
Note: The Declaration submitted earlier to this office will not be considered as such a fresh Declaration
shall have to be done as on the milestone dates of this tender document
(Declaration To be submitted on Non-Judicial Stamp Paper of Rs.300/-)
I/We hereby declare that I/ We am/ are not partner(s) black listed or terminated or debarred
or connected with firm black listed or terminated or debarred in any States, CPWD/ MES / Railways or
any Government, Semi-Government or Private body. Also, no complaint is lodged against the Firm /
At present I/We am/are registered as approved contractor(s), firms in ________
State, CPWD/MES/Railways.
We, the partners/ owners of this firm, hereby give an undertaking that we are jointly and
M severally responsible to meet all the liabilities ever and above the business of this firm and make good
the above financial loss sustained by the Rajkot Municipal Corporation as a result of our abandoning
the works entrusted to us.
Signature of Bidder with seal:
RMC/ROSHNI/SOLAR/2026 Page 65 of
Appendix 11: Project completion Report for SPV Photo-Voltaic (PV) System by the Contractor
S No Component Observation
Name of the Building
1 Site/ Location with Complete Address
Longitude/ Latitude
2 Capacity of system installed(kWp)
3 Specification of the Modules
Type of modules(multi/mono)
Make of Modules manufacturing and year
of manufacturing.
Wattage of Modules
Module Efficiency
No of series &Parallel combinations
Tilt Angle of Modules
3.1 IEC certificate
Date of issueAgency
Enclose a IEC certificate
3.2 RFID tag is pasted inside or outside
RMC/ROSHNI/SOLAR/2026 Page 66 of
3.3 Type of RFID
Make,& rating Type of Charge
controller/MPPT
Capacity of inverter and year
Whether hybrid or stand alone
Whether indigenous or imported
Enclose test certificate as per MNRE
Input Voltage to Inverter
Tracking or non-tracking
Indigenous or imported
6 Cables Make and size
Enclose Certificate: Rating :-
voltage of cable
7 Distribution Box
RMC/ROSHNI/SOLAR/2026 Page 67 of
8 Earthling and protections
Lightening Arrester (Type)
Detail of Weather Monitoring System (If
10 Solar Generation Meter No &
11 Bi-directional Meter No.
12 import & Export Reading.
It is to certify that all the components/subsystems and materials including junction boxes,cables,
distribution boards, switches, circuit breakers used are as per tender requirement.
(Solar Company signature and stamp)
Signature of Bidder with
RMC/ROSHNI/SOLAR/2026 Page 68 of
Appendix 12 Quarterly Maintenance & Servicing Report
1. DETAILS OF SOLAR PV ROOFTOP SOLAR SYSTEM,
Name of Building :
1. Date of installation:
2. Servicing period : From to
2.USER PROFILE
1. Name and address of User:
3. TECHNICAL DETAILS
a. Capacity (Wp),
c. Numbers of Module:
a. Capacity (Wp),
c. Numbers of Inverter:
4.CHECK OF THE PRODUCT
1. Correct inclination and orientation of SPV panel :
2. Cleaning of dust from SPV panel :
3. Interconnection of modules, charge controller etc.:
4. Fuse of charge controller:
5.DIFFICULTIES IN OPERATION/ PROBLEM FACED BY USER:
6. DIAGNOSIS DETAILS/ REPAIR ACTION:
7. DATE ON WHICH SYSTEM WAS LAST ATTENDED:
User Name & Signature Technician‘s Name & Signature
Date: (with rubber stamp)
RMC/ROSHNI/SOLAR/2026 Page 69 of
Appendix 13 Vendor Registration form of RMC
RMC/ROSHNI/SOLAR/2026 Page 70 of
Two Year Rate Contract for SITC of Grid-connected rooftop solar power plant System on RMC
buildings. (Re-tender)
(E-Tender No. RMC/Roshni/Solar/2026-27)
No. Event Description Mile Stone Date
1 Downloading of e-Tender documents Dt.:01/05/2026 to Dt.: 15/05/2026
Dt. 07/05/2026 at 11:30 hrs. Onwards
Pre-bid meeting in the O/o Addi. City Engineer
Bidders shall have to post their queries (if
at RMC Central Zone Office.
2 any) on e-mails [email protected] on
before Dt. 07/05/2026 up to 10:00 hrs.
3 Last Date of Online submission of e – Tender Dt.: 15/05/2026 up to 18:00 hrs.
Submission of EMD, Tender fee as per financial
criteria by Speed post only
Verification of submitted documents (EMD, e
5 Dt.: 22/05/2026 at 10:30 hrs. onwards
– Tender fee, etc.)
6 Opening of online Tech Bid (If possible) Dt.: 22/05/2026 at 10:30 hrs. onwards
7 Opening of Price Bid (If possible) Dt.: 25/05/2026 at 10:30 hrs. onwards
8 Bid Validity 180 days
Additional City Engineer
Roshni (Lighting) Department
Rajkot Municipal Corporation
Central zone office
DR. Ambedkar Bhavan
Room No.08, 2nd Floor, Dhebar Road,
RMC/ROSHNI/SOLAR/2026 Page 71 of
(to be submitted online only)
Sr.No Work Description RATE Equal/Above/
Supply, Installation, Testing and
Commissioning of Grid-connected rooftop
solar power plant System on RMC buildings
with related comprehensive Electrical, As per
Mechanical & Civil Work including all
necessary equipment with 10 (Ten) years
comprehensive O&M
Operation, Preventive Maintenance and
Annual non comprehensive maintenance cost
covers yearly maintenance of solar Pv % rate Equal/Above/
Modules, Inverter, wiring, earthing, Below same for all work.
switchgears, etc labour cost including
(Submit online only.)
preventive maintenance. The cost covers
entire installation. AMC also includes As per
monthly site visit and inspection of project Schedule - B
with submission of inspection and solar
generation report. All parts should be
replaced/repaired if found faulty within
specified time. The agency has to provide
necessary licensing work for warranty, power,
Bidirectional meter etc.
(As per ch. 7 Scope of work for O & M )
1. The bid is percentage rate bid.
2. The percentage rates shall be submitted in the formats given in the online Price
Schedules.Rates and prices received in any other formats will be rejected and the Bids will
be disqualified.
3. The quoted rates should be inclusive of all taxes (Excluding GST) and duties.
4. Prevailing GST rate will be given extra on above quoted rate.
I / WE agree to carry out the above said work at …..(to be submitted online only )….. %
Equal/above / below on Price bid rate.
WA DY. EXE. ENGINEER I/C ADD. CITY ENGINEER
Signature of tenderer with a seal:
RMC/ROSHNI/SOLAR/2026 Page 72 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
RMC_Annual RC Solar Re-tender_May 2026-Final copy.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .