Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
28 May 2026, 6:00 pmClosed
Executive Engineer, Public Health W Division, Jetpur
M & R to Bhadar-2 RWSS for 30 villages for 24 months
301436
04/2025-2026
Open
Civil Works - Water Works
Works
Rajkot
6 documents required · 6 mandatory
₹3,600
Executive Engineer, Public Health Works Division, Jetpur
₹1.9 L
14 May 2026
14 May 2026
14 May 2026
28 May 2026
14 May 2026
Name of Work:Comprehensive Operation & Maintenance of Civil & Electromechanical assets such
as intake wells/structures or offtake structures, elevated service reservoirs (E.S.R), HGLR, sump,
water treatment plant, chemical house, staff quarters, pump house, all bulk transmission and
distribution pipelines, valves, pumping machinery & electrical equipment etc. for the Bhadar-2 water
supply scheme/s, including supply of 6.16 MLD potable water to all the0 hamlets 30 villages 0 towns
for 24 months period. Taluka: Dhoraji District: Rajkot based on Bhadar-2 Dam / NC – 37 Bulk
Pipeline. Excluding supply of PAC, bleaching powder and chlorine gas.
Estimated Cost:Rs.
Gujarat Water Supply & Sewerage Board
THIS PAGE IS LEFT INTENTIONALLY BLANK
SR. NO. PARTICULARS
THIS PAGE IS LEFT INTENTIONALLY BLANK.
Schedule showing approximate quantity of materials to be supplied to the contractor at the govt. store
for the work to be executed on contract and the rate which they are to be charged.
Sr. Particular Quantity Issue Rate Unit Place of
1 Chlorine gas As Per Free of cost
2 PAC (10% liquid) As Per Free of cost H/W & SH/W of
Requirement the scheme/s
3 Bleaching powder As Per Free of cost
Add rows as required
1. Materials not included in “Schedule – A” but required for the work shall be provided by the
contractor at his own cost.
2. Any materials required for items other than labour charges items mentioned in “Schedule – B” and
materials not included in “Schedule – A” but available with dept. will be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the
materials issued by the dept. from store to site at his own cost. Contractor will be responsible for
damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the department
in good and acceptable condition by the contractors. Any such unused materials not returned by
the contractor in time or issued will be recovered at Double of (As per issue rate + 3% storage
charge or Board RC + 3% storage charges) whichever is more.
5. All materials such as Specials, Fittings, Spares,etc. shall bebrought by Agency / Contractor at site
6. The material which requires to be procured by contractor and same as available with the
department the same can be issued to the contractor after prior approval from the competent
authority and charged for the same will be at the current market rate or issue rate fixed by the
department whichever is higher. The contractor shall have to deposit total cost of materials
issued or shall be recovered from the running account bill.
7. The materials issued for the above work shall be used in the above O&M work only. If any of
materials issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availability of materials, if needed contractor
have to transport the same from the other store to ………Scheme for which no extra carting,
loading, unloading will be paid.
9. The materials issued free of cost to the contractor is to be transported to the site of work in good
condition by the contractor for which no extra payment will be made.
10. The materials to be brought/purchase by the contractor shall be got approval from the EIC before
using in the work.
Signature of the contractor
Executive Engineer
P. H. Works Division
GWSSB, <Division>
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as intake wells/structures or
offtake structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant, chemical house,
staff quarters, pump house, all bulk transmission and distribution pipelines, valves, pumping machinery &
electrical equipment etc. for the Bhadar-2 water supply scheme/s, including supply of 6.16 MLD potable water
to all the 0 hamlets 30 villages 0 towns for 24 months period. Taluka: Dhoraji District: Rajkot based on Bhadar-2
Dam / NC – 37 Bulk Pipeline. Excluding supply of PAC, bleaching powder and chlorine gas
Amount up to 2decimals
Part Description
Work to be carried out of comprehensive Operation, maintenance
and repairing of Water Supply Scheme in all respect i.e. all the
components executed under the project mainly WTP/SUMP/ESR/
Pipelines / civil structures / head works / Sub head works etc.
including establishment charges and all equipment / materials /
labour for repairing of pipeline and other civil works including
A water analysis charges etc comp. As per detailed specification &
obligatory requirement for 2 years including supply of clear water
to each Head works, Sub-Head works & 30 villages / hamlets and
0 City ( Total 30) including satisfactory maintaining the record for
the same, but excluding electric power and raw water and
including supply of chemicals such as alum, chlorine gas etc.
under Bhadar-2 Group Regional Water Supply scheme Ta.-
Dhoraji Dist.- Rajkot as per tender for 2 Year
i)Labour charges for cleaning of sump / GL cistern including
cleaning and removing algae, calcinations, sludge, dirt
deposition from bottom and as well as from wall of container,
disinfection by bleaching powder with all necessary tools and
plants, labours and cost of disinfectant etc complete
ii)Labour charges for cleaning of ESR including cleaning and
removing algae, calcinations, sludge, dirt deposition from bottom
and as well as from wall of container, disinfection by bleaching
powder with all necessary tools and plants, labours and cost of
disinfectant etc complete
Total Amount (A+B)
Total Amount (A+B)
Total of Schedule B is One Crore Eighty-Nine Lac Fifty-Eight Thousand Three Hundred Seventy-
Four Rupees and Seventy-Seven Paisa Only
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of activities
and approval of the measurement.
Water supply of target quantity of water to all habitations (village, towns and hamlets)on a
daily basis. If due to breakdown, agency is not capable of supplying water then such quantity
should be supplied the next day to cope up with the shortage. Such that the water supplied on
the next day will be 2 times the regular per day target.
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
Jetpur, and contractor has to produce it before entering into agreement with department, for
the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB.
GWSSB will supply necessary stock of Chlorine gas, PAC & bleaching powder. All other
required material for O&M work shall be brought by the contractor at his own cost including
loading, unloading and carting and the same material shall get approval from the Engineer-in-
charge before use in the work.
The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Painting of overall structures:Internal/external painting of civil structures, machineries,
manifolds, valves etc.
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house, treatment
plants, treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Oil paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all valves &
equipment inside pump house, transformer yard, D.P. structure, transformer etc
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve, butterfly
valve (outdoor), bypass arrangement etc.
Breakup of Schedule B
Part A: Operation & Maintenance
Sr. Rate (in Total Amount
Sr. Rate (in Total Amount
Qty. Unit Item Per
Work to be carried out of comprehensive
Operation, maintenance and repairing of
Water Supply Scheme in all respect i.e. all
the components executed under the project
mainly WTP/SUMP/ESR/ Pipelines / civil
structures / head works / Sub head works
etc. including establishment charges and all
equipment / materials / labour for repairing of
pipeline and other civil works including water
analysis charges etc comp. As per detailed
specification & obligatory requirement for
years including supply of clear water to each
Head works, Sub-Head works & 30 villages /
hamlets and 0 City ( Total 30) including
satisfactory maintaining the record for the
same, but excluding electric power and raw
water and including supply of chemicals such
as alum, chlorine gas etc. under Bhadar-2
Group Regional Water Supply scheme Ta.-
Dhoraji Dist.- Rajkot as per tender for 2 Year
i 12 Months First Year 7,57,698.49
ii 12 Months Second Year 8,03,160.40
Total for Part A in. Rupees One Crore Eighty-Seven Lac Thirty Thousand Three Hundred Six
Rupee and Seventy-Seven PaisaOnly
Part B- Maintenance (separately payable on actuals, as measured)
Qty. Unit Item Per Amount in
Labour charges for cleaning of sump / GL
cistern including cleaning and removing
algae, calcinations, sludge, dirt deposition
from bottom and as well as from wall of
container, disinfection by bleaching
powder with all necessary tools and
plants, labors and cost of disinfectant etc.
a 4 No. BHUKHI HEADWORKS-25 lacs litres. 21,851.00 No.
b 4 No. PIPALIYA HEADWORK-15 lacs litres. 13,429.00 No.
c 4 No. SUPEDI SUB-HEADWORK: 3.0 lacs litres. 3,414.00 No.
Labour charges for cleaning of ESR
including cleaning and removing algae,
Qty. Unit Item Per Amount in
calcinations, sludge, dirt deposition from
bottom and as well as from wall of
container, disinfection by bleaching
powder with all necessary tools and
plants, labours and cost of disinfectant etc
a 4 No. BHUKHI HEADWORKS- 8.0 lacslitres. 6,600.00 No.
b 4 No. PIPALIYA HEADWORKS: 10.0 lacs litres. 7739.00 No.
c 4 No. BHUTVAD HEADWORKS: 4.0 lacs litres. 3984.00 No.
Sub Total- Part B(i, ii,)
Total for Part B in. Rupees Two lac Twenty-Eight Thousand Sixty-Eight Only
Part C- Upgradation or Repair of non-functional legacy assets
Qty. Unit Item Per Amount in
Total for Part C in. Rupees ………………………………………………………………………(words) Only
Part C: Detailed BOQ
Brief note on operational issues and need for the repairs:______________________________
_______________________________________________________(include notes from inspection
by DEE and the need for such items)
Abstract of BOQ for Part C
<Attach/ add abstracttable>
Total Estimated Cost of Part C: _________________________________(in figures and words)
Total time limit for completion of Part C scope of work: ________________ (months) (shall not be
more than 12 months from start date of contract.
Remove below instructions before publishing.
Part C of the price bid shall include inherited non-functional legacy assets which need to be
repaired to make the system functional and efficient. The items shall be as per the baseline
assessment carried out by the concerned DEE.
This may include the following items:
Resolving technical issue due to which tail end villages are not receiving water
Resolving technical issue to ensure water supply to villages (other than tail end)
Rectification/ repair of non-functional assets
Replacement of electromechanical asset at end of life. Such as transformers, pumping
This part shall be a one-time activity. Once all assets are repaired, maintenance and upkeep of
the same will be the responsibility of O&M agency.
For Part C, approval shall be sought from concerned engineer as per the delegation of
Such cases will be scrutinized, and necessary actions will be recommended by a special task
team formed by the GWSSB.
The estimated cost of Part C shall not be more than 30% of the total estimated cost of the
tender (Part A + Part B).
No extra/ excess items will be allowed under Part C scope.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. Bhadar-2 O and M DTP Vol II Financial Bid.pdf
3. BHADAR-II VILL LAYOUT 13 10 2006 LATEST 10 2008.pdf
1. Ann shramyogi GR (1).pdf
2. Annexture 1.pdf
3. Annexture 5 Insurance.pdf
4. Badhakam Shramyogi-1.pdf
5. Chlorination.pdf
6. Hard Rock Circular 05.10.20.pdf
7. Hard rock Circular 26.12.18.pdf
8. Laghutam Vetan Paripatra Dtd 01.04.24.pdf
9. Letter for nCode Mobile App (1).pdf
10. Price variation and M and R Clause Change.pdf
11. Price Variation Paripatra 2023.pdf
12. Royalty 1.pdf
13. ROYALTY 2.pdf
14 SD EMD GR DMO_2941_01-Apr-2026_744.pdf
15. SIGN BOARD-1.pdf
16. Vigilance Insurance Dt 19 03 12 GR.pdf
17. works contract with O and M.pdf
18. Annexture 4 Unbalance Rate.pdf
19. Badhakam Shramyogi.pdf
20. Circular GST 07-01-22.pdf
21. Circular of GST 10.7.17.pdf
22. Unbalance rate.pdf
23. standard bid small change in GCC clause no.1 Dt.3-5-2025.pdf
24. Correction in Technical bid clause Dt.28-8-2025.pdf
1. Bhadar-2 O and M DTP Vol I Technical Bid 12-05-2026 corrected.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .