Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
5 Sept 2026, 6:00 pm
SE PWD CIRCLE BUNDI
SE PWD CIRCLE BUNDI
RJ-09-14/LAK/B.A.-2026-27/NP and ML
2026_CEPWD_589068_4
SE PWD CIRCLE BUNDI NITNO-07/2026-27
Open Tender
Civil Works
Percentage
150 days
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
2000 EE PWD DIV. LAKHERI
₹2.3 L
Yes
16 Aug 2026
16 Aug 2026
8 Sept 2026
16 Aug 2026
5 Sept 2026
16 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | |||||
| 1.01 | lEidZ lM+d fuekZ.k dk;Z >kM+kSy | - | E | - | - |
| 1.02 | Total | - | Hectare | - | - |
| 2Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3 | |||||
| 2.01 | lEidZ lM+d fuekZ.k dk;Z >kM+kSy | - | E | - | - |
| 2.02 | Total | - | Sqm | - | - |
| 3Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | |||||
| 3.01 | lEidZ lM+d fuekZ.k dk;Z >kM+kSy | - | E | - | - |
| 3.02 | Total | - | Cum | - | - |
| 4Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1046012.xls
BOQ • 0.33 MB
CERTIFICATE-14.pdf
PDF • 0.24 MB
RATE-ANALYSIS-09-14.pdf
PDF • 0.46 MB
CORRIGENDUM.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].