Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | MISHEL KRISHNA E U L1 |
|---|---|---|---|---|
| 1.00CONSTRUCTION OF ARAPPATHODU BRIDGE AT KAZHIBRAM BEACH | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.76 | cum | 348.15 ₹3,397.94 |
| 1.00 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1.94 | cum | 7,000 ₹13,608 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 5.4 | sqm | 350 ₹1,890 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.68 | cum | 7,600 ₹5,137.6 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.28 | sqm | 365 ₹1,927.2 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 17.42 | sqm | 730 ₹12,716.6 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 21.75 | sqm | 930 ₹20,227.5 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 8.8 | sqm | 890 ₹7,832 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.5 | cum | 9,500 ₹23,712 |
Tender Value
₹2.5 L
EMD Value
₹6,347
Closing Date
4 Nov 2025, 6:00 pmClosed
Assistant Engineer
Office of AE, LID EW Section , Valapad
Annual Plan-Valapad G P- 2025-26 - CONSTRUCTION OF ARAPPA THODU BRIDGE AT KAZHIMBRAM BEACH WARD13-PRO.NO.135/26
2025_LSGD_815799_10
20/2025-26/AE/LID EW/VPD
Open Tender
Civil Works - Others
360 days
Valapad GP, Thalikulum BP
Please refer Tender documents.
11 documents required · 11 mandatory
₹560
Yes
₹6,347
Yes
26 Jan 2026
28 Oct 2025
6 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1366218.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
AFF.pdf
Tender Documents • 0.11 MB
PA.pdf
Tender Documents • 0.13 MB
Epaymentform.pdf
Tender Documents • 0.02 MB
SBD.pdf
Tender Documents • 2.30 MB
FOT.pdf
Tender Documents • 0.13 MB
Integritypact.pdf
Tender Documents • 0.01 MB
BOQ_1366218.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid