Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 CrAccepted-AOC SAB JOHN THOTTAM OMALUR PO TK SALEM 636404 | SALEM | SALEM | TAMIL NADU | 636404 | ₹22.4 Cr Quoted ₹22.9 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹25.4 CrRejected-AOC 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹25.4 Cr | L2 | Rejected-AOC Highest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Not Qualified |
| Sl No | Description | Qty | Unit | ANANTH CONSTRUCTIONS L1 | VR WATER INFRA COMPANY L2 |
|---|---|---|---|---|---|
| 1.00Operation and Maintenance of the CWSS to 4 Nos of Trichy District (Pkg - 38), including repair, rectification works and supply of chemicals for three years period from 2026 -2027 to 2028-2029. | |||||
| 2.00 | CWSS to 138 Rural Habitations in Thottiyam Union of Trichy District | 1 | Job | 3,37,73,690.98 ₹3.4 Cr | 3,91,71,512.4 ₹3.9 Cr |
| 3.00 | CWSS to 135 Habitations in Vaiyampatty and Marungapuri Unions in Trichy District. | 1 | Job | 4,04,94,612.4 ₹4.0 Cr | 4,51,93,636.22 ₹4.5 Cr |
| 4.00 | CWSS to 293 Habitations in Musiri, Thathaiyangarpettai, Thuraiyur and Uppiliyapuram Unions in Trichy District. | 1 | Job | 7,51,10,160.49 ₹7.5 Cr | 7,91,98,462.66 ₹7.9 Cr |
| 5.00 | CWSS to Koodapallai and 97 Habitations in Mannachanallur and Musiri Union of Trichy District | 1 | Job | 4,42,85,259.83 ₹4.4 Cr | 5,16,37,031.65 ₹5.2 Cr |
| 6.00Total Basic Value | |||||
| 7.00 | GST @ 18% | 1 | Nos | 3,48,59,470.27 ₹3.5 Cr | 3,87,36,115.73 ₹3.9 Cr |
Tender Value
₹23.3 Cr
EMD Value
₹17.4 L
Closing Date
21 Jan 2026, 3:00 pmClosed
Chief Engineer , TWAD, Thanjavur
Chief Engineer , TWAD, Thanjavur
O and M Package 38 in Trichy District
2026_TWAD_640705_1
28/F.O and M of CWSS/SDO/CE-TNJ/2025
Open Tender
Civil Works
1095 days
Trichy
as per bid document
5 documents required · 5 mandatory
₹0
₹17.4 L
Chief Engineer office, TWAD, Thanjavur
16 Mar 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
21 Jan 2026
13 Jan 2026
12 Jan 2026
Operation and Maintenance of the CWSS to 4 Nos of Trichy District (Pkg - 38), including repair, rectification works and supply of chemicals for three years period from 2026 -2027 to 2028-2029.
CWSS to 138 Rural Habitations in Thottiyam Union of Trichy District
CWSS to 135 Habitations in Vaiyampatty and Marungapuri Unions in Trichy District.
CWSS to 293 Habitations in Musiri, Thathaiyangarpettai, Thuraiyur and Uppiliyapuram Unions in Trichy District.
CWSS to Koodapallai and 97 Habitations in Mannachanallur and Musiri Union of Trichy District
Total Basic Value
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE A1 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
For the Year 2026 - 2027. (From 01.04.2026 to 31.03.2027)
Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.16 LL to 0.30 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
100mm GM Valve
80mm GM Valve
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS - 2 HP
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
FROM 100 HP TO 200 HP VERTICAL TURBINE PUMPSETS - 100 HP
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
100 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
100 HP VT Pump
Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988
3C 4 sq.mm
3C 6 sq.mm
3C 10sq.mm
3C 16sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
Upto 5 A
Supply and Delivery of Porcelian Fuse Units
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator
Ammeter
Digital Ammeter 3 Phase
Voltmeter
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
Change Over Switch
Change Over Switch
Light Emitting Diode
15W Led Bulb
Electro magnetic contactors of suitable capacity in AC Three Phase rating, conforming to IS/IEC 60947-4-1.
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
Supply and Delivery of GI Specials as per IS 1239/PART II/2004
GI Bend
Supply and delivery of Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Supply and Delivery of Motor Protection Relay suitable for FCMA Soft Starter
Supply and Delivery of Voltage Protection Relay suitable for FCMA Soft Starter
Supply and Deliver of Timer suitable for FCMA Soft Starter
Supply and Delivery of CT Coil suitable for ATS Starter and FCMA Soft Starter
200/5 Rating
Supply and Delivery of End Termination and Joint Kits
Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2027 - 2028. (From 01.04.2027 to 31.03.2028)
Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.16 LL to 0.30 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
100mm GM Valve
80mm GM Valve
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS - 2 HP
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
FROM 100 HP TO 200 HP VERTICAL TURBINE PUMPSETS - 100 HP
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
100 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
100 HP VT Pump
Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988
3C 4 sq.mm
3C 6 sq.mm
3C 10sq.mm
3C 16sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
Upto 5 A
Supply and Delivery of Porcelian Fuse Units
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator
Ammeter
Digital Ammeter 3 Phase
Voltmeter
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
Change Over Switch
Change Over Switch
Light Emitting Diode
15W Led Bulb
Electro magnetic contactors of suitable capacity in AC Three Phase rating, conforming to IS/IEC 60947-4-1.
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
Supply and Delivery of GI Specials as per IS 1239/PART II/2004
GI Bend
Supply and delivery of Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Supply and Delivery of Motor Protection Relay suitable for FCMA Soft Starter
Supply and Delivery of Voltage Protection Relay suitable for FCMA Soft Starter
Supply and Deliver of Timer suitable for FCMA Soft Starter
Supply and Delivery of CT Coil suitable for ATS Starter and FCMA Soft Starter
200/5 Rating
Supply and Delivery of End Termination and Joint Kits
Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2028 - 2029. (From 01.04.2028 to 31.03.2029)
Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.16 LL to 0.30 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm DI K7 Pipes
250mm DI K7 Pipes
300mm DI K9 Pipes
200mm DI K9 Pipes
100mm DI K7 Pipes
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
100mm GM Valve
80mm GM Valve
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS - 2 HP
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
FROM 100 HP TO 200 HP VERTICAL TURBINE PUMPSETS - 100 HP
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
100 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
100 HP VT Pump
Charges for Removing the Hollow shaft Squirrel cage Induction Motor after disconnecting the Power supply Cable, Discharge Head, Head Shaft and Stuffing Box by using contractor tools at Collector Well
Charges for removing the all Column pipes of VT Pumpset each 1.5 m / 2.00 m to length and bowl assemblly for attending Pump repair works
Transportation charges for conveying the VT Pump bowl assembly from Collector Well Pump room to Work Shop including usage of trolley along the Foot bridge and Van
Reconditioning of Stuffing Box for providing bronze bush suitable for fixing thr Rope Gland and Head Shaft to avoid frequent damaging of rope and to avoid spreading of more leakage water from the Rope Gland including lath works etc., complete.
Charges for Lathe work of reconditioning of Pump SS Shaft with balancing, SS Bushes and sleeves, charges for Spider bore nd outer dimension phase out lath works, reconditioning of impeller and impeller ring & charges fixing the bearing and bronze bushes in the bowl assembly including correct setting of impeller allignment etc complete
Transportation charges for conveying the VT Pump bowl assembly from our work shop to Collector Well Pump room including usage of trolley along the Foot bridge and Van
Charges for reassembling the all Column pipes of Turbine Pump set and bowl assemblly after attending Pump repair works in the proper allignment after attending the cleaning and painting work in the coloumn pipe and body of the bowl assembly
Re errection of reconditioned stuffing box, new Head shaft, Discharge head and Motor, fixing the Rachet load bearing assembly including filling of required 90 grade oil and Connecting the 440V AC incoming Cable to the Motor Terminal and fixing new rope in the rope gland and Checking Motor Pumpset Alignment and Rotation and testing with load etc.,Complete
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour charges for Repair and replacement of spares in ATS Starters, MV Panel Board, required cables and allied works includind the cost of ATS Coil / FCMA coil rewinding work and excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB, Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988
3C 4 sq.mm
3C 6 sq.mm
3C 10sq.mm
3C 16sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode.
Upto 5 A
Supply and Delivery of Porcelian Fuse Units
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator
Ammeter
Digital Ammeter 3 Phase
Voltmeter
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications
Change Over Switch
Change Over Switch
Light Emitting Diode
15W Led Bulb
Electro magnetic contactors of suitable capacity in AC Three Phase rating, conforming to IS/IEC 60947-4-1.
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004
Supply and Delivery of GI Specials as per IS 1239/PART II/2004
GI Bend
Supply and delivery of Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Supply and Delivery of Motor Protection Relay suitable for FCMA Soft Starter
Supply and Delivery of Voltage Protection Relay suitable for FCMA Soft Starter
Supply and Deliver of Timer suitable for FCMA Soft Starter
Supply and Delivery of CT Coil suitable for ATS Starter and FCMA Soft Starter
200/5 Rating
Supply and Delivery of End Termination and Joint Kits
Supply and Delivery of CI D/F Reflux Valve as per IS 5312/2004/Part I/84 PN 1.0
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE A2 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
For the Year 2026 - 2027. (From 01.04.2026 to 31.03.2027)
For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
63mm PVC 4 KSC
75mm PVC 4 KSC
90mm PVC 4 KSC
110mm PVC 4 KSC
140mm PVC 4 KSC
160mm PVC 4 KSC
50mm PVC 6 KSC
For Minor Leak/ Circumfrential Crack
200mm DI K7
250mm DI K9
250mm DI K7
For Major Leak/Burst
200mm DI K7
250mm DI K7
Replacement of Underground Utilities (GI Pipe) damaged during earthwork excavations for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. (During Road Widening / Corrosion)
50mm Dia GI Pipe
65mm Dia GI Pipe
80mm Dia GI Pipe
100mm Dia GI Pipe
125mm Dia GI Pipe
Replacement of Underground Utilities (PVC Pipe) damaged duringearthwork excavation for pipe laying works including cost of additionalearthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes, couplers, jointing materialsand required specials, cutting, conveying , laying, jointing and cost ofrefilling for the additional earthwork etc complete and as directed by theTWAD board officers.
63mm Dia PVC pipe (4KSC)
75mm Dia PVC pipe (4KSC)
90mm Dia PVC pipe (4KSC)
110mm Dia PVC pipe (4KSC)
140mm Dia PVC pipe (4KSC)
160mm Dia PVC pipe (4KSC)
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Repair work of Starter - DOL Starter
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
Repair work of Starter - Star Delta Starter
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Supply and delivery of the following Electrical works: consumable items at the site of work carry out the general maintenance works
Volt meter SR 96 600 V-AC
Ammeter SR 96 5D/5A C.T.operated-AC
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in six months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries, materials, labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
Group Sump - 5000 Ltr - 2 Nos
Group Sump - 10000 Ltr - 12 Nos
Group Sump - 15000 Ltr - 6 Nos
Group Sump - 20000 Ltr - 3 Nos
Group Sump - 25000 Ltr - 4 Nos
Group Sump - 30000 Ltr - 3 Nos
Group Sump - 35000 Ltr - 3 Nos
Group Sump - 40000 Ltr- 1 No
Group Sump - 45000 Ltr-1 No
Group Sump - 55000 Ltr - 2 Nos
Group Sump - 90000 Ltr-1 No
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2027 - 2028. (From 01.04.2027 to 31.03.2028)
For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
63mm PVC 4 KSC
75mm PVC 4 KSC
90mm PVC 4 KSC
110mm PVC 4 KSC
140mm PVC 4 KSC
160mm PVC 4 KSC
50mm PVC 6 KSC
For Minor Leak/ Circumfrential Crack
200mm DI K7
250mm DI K9
250mm DI K7
For Major Leak/Burst
200mm DI K7
250mm DI K7
Replacement of Underground Utilities (GI Pipe) damaged during earthwork excavations for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. (During Road Widening / Corrosion)
50mm Dia GI Pipe
65mm Dia GI Pipe
80mm Dia GI Pipe
100mm Dia GI Pipe
125mm Dia GI Pipe
Replacement of Underground Utilities (PVC Pipe) damaged duringearthwork excavation for pipe laying works including cost of additionalearthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes, couplers, jointing materialsand required specials, cutting, conveying , laying, jointing and cost ofrefilling for the additional earthwork etc complete and as directed by theTWAD board officers.
63mm Dia PVC pipe (4KSC)
75mm Dia PVC pipe (4KSC)
90mm Dia PVC pipe (4KSC)
110mm Dia PVC pipe (4KSC)
140mm Dia PVC pipe (4KSC)
160mm Dia PVC pipe (4KSC)
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Repair work of Starter - DOL Starter
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
Repair work of Starter - Star Delta Starter
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Supply and delivery of the following Electrical works: consumable items at the site of work carry out the general maintenance works
Volt meter SR 96 600 V-AC
Ammeter SR 96 5D/5A C.T.operated-AC
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in six months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries, materials, labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
Group Sump - 5000 Ltr - 2 Nos
Group Sump - 10000 Ltr - 12 Nos
Group Sump - 15000 Ltr - 6 Nos
Group Sump - 20000 Ltr - 3 Nos
Group Sump - 25000 Ltr - 4 Nos
Group Sump - 30000 Ltr - 3 Nos
Group Sump - 35000 Ltr - 3 Nos
Group Sump - 40000 Ltr- 1 No
Group Sump - 45000 Ltr-1 No
Group Sump - 55000 Ltr - 2 Nos
Group Sump - 90000 Ltr-1 No
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2028 - 2029. (From 01.04.2028 to 31.03.2029)
For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
63mm PVC 4 KSC
75mm PVC 4 KSC
90mm PVC 4 KSC
110mm PVC 4 KSC
140mm PVC 4 KSC
160mm PVC 4 KSC
50mm PVC 6 KSC
For Minor Leak/ Circumfrential Crack
200mm DI K7
250mm DI K9
250mm DI K7
For Major Leak/Burst
200mm DI K7
250mm DI K7
Replacement of Underground Utilities (GI Pipe) damaged during earthwork excavations for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. (During Road Widening / Corrosion)
50mm Dia GI Pipe
65mm Dia GI Pipe
80mm Dia GI Pipe
100mm Dia GI Pipe
125mm Dia GI Pipe
Replacement of Underground Utilities (PVC Pipe) damaged duringearthwork excavation for pipe laying works including cost of additionalearthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes, couplers, jointing materialsand required specials, cutting, conveying , laying, jointing and cost ofrefilling for the additional earthwork etc complete and as directed by theTWAD board officers.
63mm Dia PVC pipe (4KSC)
75mm Dia PVC pipe (4KSC)
90mm Dia PVC pipe (4KSC)
110mm Dia PVC pipe (4KSC)
140mm Dia PVC pipe (4KSC)
160mm Dia PVC pipe (4KSC)
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Repair work of Starter - DOL Starter
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
5 HP - Submersible Pumpset
Repair work of Starter - Star Delta Starter
10 HP - Submersible Pumpset
40 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Supply and delivery of the following Electrical works: consumable items at the site of work carry out the general maintenance works
Volt meter SR 96 600 V-AC
Ammeter SR 96 5D/5A C.T.operated-AC
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in six months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries, materials, labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
Group Sump - 5000 Ltr - 2 Nos
Group Sump - 10000 Ltr - 12 Nos
Group Sump - 15000 Ltr - 6 Nos
Group Sump - 20000 Ltr - 3 Nos
Group Sump - 25000 Ltr - 4 Nos
Group Sump - 30000 Ltr - 3 Nos
Group Sump - 35000 Ltr - 3 Nos
Group Sump - 40000 Ltr- 1 No
Group Sump - 45000 Ltr-1 No
Group Sump - 55000 Ltr - 2 Nos
Group Sump - 90000 Ltr-1 No
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE A3 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
For the Year 2026 - 2027. (From 01.04.2026 to 31.03.2027)
( For the Period from 01.02.2027 to 31.03.2027 - Two Months) For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
450mm DI K7 CL
400mm DI K7 CL
350mm DI K7 CL
300mm DI K7 CL
250mm DI K7 CL
200mm DI K7 CL
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
150mm GI Pipe
125mm GI Pipe
100mm GI Pipe
80mm GI Pipe
65mm GI Pipe
50mm GI Pipe
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 10 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
5 HP - Submersible Pumpset
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2027 - 2028. (From 01.04.2027 to 31.03.2028)
For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
450mm DI K7 CL
400mm DI K7 CL
350mm DI K7 CL
300mm DI K7 CL
250mm DI K7 CL
200mm DI K7 CL
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 10 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 10 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
150mm GI Pipe
125mm GI Pipe
100mm GI Pipe
80mm GI Pipe
65mm GI Pipe
50mm GI Pipe
For Minor Leak/ Burst/Damages
450mm DI K7 CL
400mm DI K7 CL
350mm DI K7 CL
300mm DI K7 CL
250mm DI K7 CL
200mm DI K7 CL
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 10 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
5 HP - Submersible Pumpset
7.5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
15 HP - Submersible Pumpset
20 HP - Submersible Pumpset
30 HP - Submersible Pumpset
50 HP - Submersible Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
5 HP - Submersible Pumpset
7.5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
15 HP - Submersible Pumpset
20 HP - Submersible Pumpset
30 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Supply and delivery of the following Electrical works:consumable items at the site of work carry out the general maintenance works
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS:2834 with ISI marking
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications-
Supply and Delivery of Breather Unit for Transformer
Supply and Delivery of Silica Gel for filling the Breather Unit
Supply and Delivery of Drop Out fuse Unit with fuse wire
Supply and Delivery of Transformer oil
SUPPLY AND DELIVERY OF GI PIPES,VALVES AND SPECIALS
Replacement of GI Pipe and Specials damaged during Road widening works and Accidential Damages for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers.
50 MM GI Pipe
65 MM GI Pipe
80 MM GI Pipe
100 MM GI Pipe
125MM GI Pipe
150 MM GI Pipe
Cutting and Threading of GI pipes
Cutting of 80 mm GI Pipes
Threading of 80 mm GI pipes
Cutting of 65 mm GI Pipes
Threading of 65 mm GI pipes
Cutting of 65 mm GI Pipes
Threading of 65 mm GI pipes
Cutting of 50 mm GI Pipes
Threading of 50 mm GI pipes
Supply and Delivery of Gi Specials
50 MM GI coupling
50 MM GI Bend
50m GI Union
65 MM GI Coupling
65 MM GI Bend
80 MM GI Coupling
80 MM GI Bend
100 MM GI Coupling
100 MM GI Bend
125MM GI Coupling
125 MM GI Bend
150MM GI Coupling
150 MM GI Bend
Replacement of non functioning unserviceble Gun metal Valve without affecting existing alignment by contractor tools excluding cost of valve but including required length of GI nipple, coupling etc., complete
50 MM Gm Gate valve in OHT inlet connection/Sump Inlet Connection
50 MM Flow Control valve OHT inlet connection/Sump Inlet Connection
Charges for Repair and Reconditioning of Sluice valve in pumproom and pipeline including cost of check nut and labour charges etc.,
50 MM Sluice valve in 50mm Pvc pipe line
65 MM Sluice valve in 75mm Pvc pipe line
80 MM Sluice valve in 90mm Pvc pipe line
100 MM Sluice valve in 110mm Pvc pipe line
125MM Sluice valve in 140mm Pvc pipe line
150MM Sluice valve in 160mm Pvc pipe line
200MM Sluice valve in 200mm Pvc Pipe line
200MM Sluice valve in 200 DI pipe line
250MM Sluice valve in 250 DI Pipe line
300MM Sluice valve in 300 DI Pipe line
350MM Sluice valve in 350 DI Pipe line
400MM Sluice valve in 400 DI Pipe line
450MM Sluice valve in 450 DI Pipe line
Repair and Reconditioning of the double Air valve / Single Chamber Air Release valve including the cost of Air Valve Ball, Rubber washer and required Bolt & Nuts, etc., complete
50mm SAV in 50mm Pvc Pipe line
50mm SAV in 63mm Pvc Pipe line
50mm SAV in 75mm Pvc Pipe line
50mm SAV in 90mm Pvc Pipe line
80 MM DAV in 110mm Pvc pipe line
100 MM DAV in 140mm Pvc pipe line
100 MM DAV in 160mm Pvc pipe line
100 MM DAV in 200mm Pvc pipe line
100 MM DAV in 200mm DI pipe line
100 MM DAV in 250mm DI pipe line
150 MM DAV in 300mm DI pipe line
150 MM DAV in 350mm DI pipe line
150 MM DAV in 400mm DI pipe line
150 MM DAV in 450mm DI pipe line
Supply and Delivery of Non Return Valves
50 mm NR valve
65 mm NR valve
80 mm NR valve
200 MM NR valve
250 MM NR valve
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
Devanur - 375000 Ltr
Valavanthi - 520000 Ltr
Karugudi - 105000 Ltr
Serugudi - 10000 Ltr
Kottapalayam - 145000 Ltr
Pachaperumalpatti - 60000 Ltr
Aiyampalayam - 20000 Ltr
Murugur - 80000 Ltr
T.Renganathapuram - 15000 Ltr
Thavittupatti - 45000 Ltr
VA Samuthram - 10000 Ltr
Aaraichi - 10000 Ltr
Anjalam - 15000 Ltr
Devanur - 5000 Ltr
Karugudi - 10000 Ltr
Mahadevi - 45000 Ltr
Mangalam - 15000 Ltr
Muthampatti - 15000 Ltr
Oorudiyapatty - 35000 Ltr
Paithamparai - 20000 Ltr
Pillapalayam - 100000 Ltr
Poolancheri - 35000 Ltr
Serugudi - 20000 Ltr
Sittalarai - 30000 Ltr
Thulayanatham - 25000 Ltr
Thumbalam - 20000 Ltr
Valasiramani - 55000 Ltr
Valavanthi - 35000 Ltr
Alagapuri - 45000 Ltr
Alathudayanpatti - 190000 Ltr
Angiyam - 15000 Ltr
E.Badarpettai - 55000 Ltr
Kamachipuram - 20000 Ltr
Koppampatti - 100000 Ltr
Kottapalayam - 110000 Ltr
Maradi - 20000 Ltr
Nanganallur - 75000 Ltr
Oduvampatti Puthur - 10000 Ltr
Okkarai - 85000 Ltr
Pachaperumalpatti - 55000 Ltr
Sirunavalur - 90000 Ltr
Sobanapuram - 150000 Ltr
Thalugai - 130000 Ltr
Vairachettipalayam - 155000 Ltr
Venkatachalapuram - 40000 Ltr
Aiyampalayam - 55000 Ltr
Gunaseelam - 20000 Ltr
Perur - 10000 Ltr
T.Pudupatti - 10000 Ltr
Neyveli - 10000 Ltr
Evoor - 35000 Ltr
Adhanur (Kattanampatti Kottam) - 35000 Ltr
Aiyampalayam New - 20000 Ltr
Kalingamudaiyanpatti - 25000 Ltr
Kannanur - 100000 Ltr
Kannanur palayam - 50000 Ltr
Keerambur - 20000 Ltr
Kollaptti - 35000 Ltr
Kombai - 10000 Ltr
Kottaiyur - 65000 Ltr
Kunnupatti - 80000 Ltr
Madhurapuri (Devanganagar) - 25000 Ltr
Maruvathur - 15000 Ltr
Murugur - 45000 Ltr
Muthaiyampalaym - 25000 Ltr
Naduvalur - 20000 Ltr
Narasingapuram - 55000 Ltr
Pagalavadi (Thavittupatti) - 100000 Ltr
Perumalpalayam - 70000 Ltr
Ponnusangampatti - 20000 Ltr
Sellipalayam - 50000 Ltr
Senappanallur - 10000 Ltr
Sikkathambur - 20000 Ltr
Singalanthapuram - 95000 Ltr
Sorathur - 20000 Ltr
T.Renganathapuram - 65000 Ltr
VA Samuthram - 15000 Ltr
Veeramachampatti - 20000 Ltr
Venkatathanur - 40000 Ltr
Venkatesapuram - 10000 Ltr
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2028 - 2029. (From 01.04.2028 to 31.03.2029)
For Operation and Maintenance of Electro-mechanical equipments, components, pipelines valves and appurtenances, water retaining structuress including protection of all scheme components from damages/theft undertaking legal actions for such untoward incidents, preventive maintenance, disinfection and deliverance of water as per standards adopted time to time and supply of earnmarked quantity of water to the beneficiaries as per stanndard operating procedures, acts and rules in force and as directected by TWAD Board Officers. Excluding cost towards attending leak, burst, repairs and replacement works of electro-mechanical equipments/ components, consumables for disinfection of water and cleaning of all water retaining structure.
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing, civil works, cost of materials and all other incidental charges etc. complete with in the stipulated time limit as specified in clause 2.6.4 of General conditions of Contact-Part II.(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.The specification has to be mentioned under the clause 1.7 of GCC-Part-I)
For Minor Leak
450mm DI K7 CL
400mm DI K7 CL
350mm DI K7 CL
300mm DI K7 CL
250mm DI K7 CL
200mm DI K7 CL
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 10 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 10 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
150mm GI Pipe
125mm GI Pipe
100mm GI Pipe
80mm GI Pipe
65mm GI Pipe
50mm GI Pipe
For Minor Leak/ Burst/Damages
450mm DI K7 CL
400mm DI K7 CL
350mm DI K7 CL
300mm DI K7 CL
250mm DI K7 CL
200mm DI K7 CL
200mm PVC 6 KSC
200mm PVC 4 KSC
160mm PVC 10 KSC
160mm PVC 6 KSC
160mm PVC 4 KSC
140mm PVC 10 KSC
140mm PVC 6 KSC
140mm PVC 4 KSC
110mm PVC 10 KSC
110mm PVC 6 KSC
110mm PVC 4 KSC
90mm PVC 6 KSC
90mm PVC 4 KSC
75mm PVC 6 KSC
75mm PVC 4 KSC
63mm PVC 10 KSC
63mm PVC 6 KSC
63mm PVC 4 KSC
50mm PVC 6 KSC
Repair works in pumping station in the Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.8 of General conditions of Contract Part II etc as directed by TWAD Board officers
Repair work of Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
5 HP - Submersible Pumpset
7.5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
15 HP - Submersible Pumpset
20 HP - Submersible Pumpset
30 HP - Submersible Pumpset
50 HP - Submersible Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
100 HP - VT Pumpset
75 HP - HSC Pumpset
1 HP - Submersible Pumpset
2 HP - Submersible Pumpset
3 HP - Submersible Pumpset
4 HP - Submersible Pumpset
5 HP - Submersible Pumpset
7.5 HP - Submersible Pumpset
10 HP - Submersible Pumpset
15 HP - Submersible Pumpset
20 HP - Submersible Pumpset
30 HP - Submersible Pumpset
50 HP - Submersible Pumpset
Supply and delivery of the following Electrical works:consumable items at the site of work carry out the general maintenance works
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS:2834 with ISI marking
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications-
Supply and Delivery of Breather Unit for Transformer
Supply and Delivery of Silica Gel for filling the Breather Unit
Supply and Delivery of Drop Out fuse Unit with fuse wire
Supply and Delivery of Transformer oil
SUPPLY AND DELIVERY OF GI PIPES,VALVES AND SPECIALS
Replacement of GI Pipe and Specials damaged during Road widening works and Accidential Damages for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers.
50 MM GI Pipe
65 MM GI Pipe
80 MM GI Pipe
100 MM GI Pipe
125MM GI Pipe
150 MM GI Pipe
Cutting and Threading of GI pipes
Cutting of 80 mm GI Pipes
Threading of 80 mm GI pipes
Cutting of 65 mm GI Pipes
Threading of 65 mm GI pipes
Cutting of 65 mm GI Pipes
Threading of 65 mm GI pipes
Cutting of 50 mm GI Pipes
Threading of 50 mm GI pipes
Supply and Delivery of Gi Specials
50 MM GI coupling
50 MM GI Bend
50m GI Union
65 MM GI Coupling
65 MM GI Bend
80 MM GI Coupling
80 MM GI Bend
100 MM GI Coupling
100 MM GI Bend
125MM GI Coupling
125 MM GI Bend
150MM GI Coupling
150 MM GI Bend
Replacement of non functioning unserviceble Gun metal Valve without affecting existing alignment by contractor tools excluding cost of valve but including required length of GI nipple, coupling etc., complete
50 MM Gm Gate valve in OHT inlet connection/Sump Inlet Connection
50 MM Flow Control valve OHT inlet connection/Sump Inlet Connection
Charges for Repair and Reconditioning of Sluice valve in pumproom and pipeline including cost of check nut and labour charges etc.,
50 MM Sluice valve in 50mm Pvc pipe line
65 MM Sluice valve in 75mm Pvc pipe line
80 MM Sluice valve in 90mm Pvc pipe line
100 MM Sluice valve in 110mm Pvc pipe line
125MM Sluice valve in 140mm Pvc pipe line
150MM Sluice valve in 160mm Pvc pipe line
200MM Sluice valve in 200mm Pvc Pipe line
200MM Sluice valve in 200 DI pipe line
250MM Sluice valve in 250 DI Pipe line
300MM Sluice valve in 300 DI Pipe line
350MM Sluice valve in 350 DI Pipe line
400MM Sluice valve in 400 DI Pipe line
450MM Sluice valve in 450 DI Pipe line
Repair and Reconditioning of the double Air valve / Single Chamber Air Release valve including the cost of Air Valve Ball, Rubber washer and required Bolt & Nuts, etc., complete
50mm SAV in 50mm Pvc Pipe line
50mm SAV in 63mm Pvc Pipe line
50mm SAV in 75mm Pvc Pipe line
50mm SAV in 90mm Pvc Pipe line
80 MM DAV in 110mm Pvc pipe line
100 MM DAV in 140mm Pvc pipe line
100 MM DAV in 160mm Pvc pipe line
100 MM DAV in 200mm Pvc pipe line
100 MM DAV in 200mm DI pipe line
100 MM DAV in 250mm DI pipe line
150 MM DAV in 300mm DI pipe line
150 MM DAV in 350mm DI pipe line
150 MM DAV in 400mm DI pipe line
150 MM DAV in 450mm DI pipe line
Supply and Delivery of Non Return Valves
50 mm NR valve
65 mm NR valve
80 mm NR valve
200 MM NR valve
250 MM NR valve
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
Devanur - 375000 Ltr
Valavanthi - 520000 Ltr
Karugudi - 105000 Ltr
Serugudi - 10000 Ltr
Kottapalayam - 145000 Ltr
Pachaperumalpatti - 60000 Ltr
Aiyampalayam - 20000 Ltr
Murugur - 80000 Ltr
T.Renganathapuram - 15000 Ltr
Thavittupatti - 45000 Ltr
VA Samuthram - 10000 Ltr
Aaraichi - 10000 Ltr
Anjalam - 15000 Ltr
Devanur - 5000 Ltr
Karugudi - 10000 Ltr
Mahadevi - 45000 Ltr
Mangalam - 15000 Ltr
Muthampatti - 15000 Ltr
Oorudiyapatty - 35000 Ltr
Paithamparai - 20000 Ltr
Pillapalayam - 100000 Ltr
Poolancheri - 35000 Ltr
Serugudi - 20000 Ltr
Sittalarai - 30000 Ltr
Thulayanatham - 25000 Ltr
Thumbalam - 20000 Ltr
Valasiramani - 55000 Ltr
Valavanthi - 35000 Ltr
Alagapuri - 45000 Ltr
Alathudayanpatti - 190000 Ltr
Angiyam - 15000 Ltr
E.Badarpettai - 55000 Ltr
Kamachipuram - 20000 Ltr
Koppampatti - 100000 Ltr
Kottapalayam - 110000 Ltr
Maradi - 20000 Ltr
Nanganallur - 75000 Ltr
Oduvampatti Puthur - 10000 Ltr
Okkarai - 85000 Ltr
Pachaperumalpatti - 55000 Ltr
Sirunavalur - 90000 Ltr
Sobanapuram - 150000 Ltr
Thalugai - 130000 Ltr
Vairachettipalayam - 155000 Ltr
Venkatachalapuram - 40000 Ltr
Aiyampalayam - 55000 Ltr
Gunaseelam - 20000 Ltr
Perur - 10000 Ltr
T.Pudupatti - 10000 Ltr
Neyveli - 10000 Ltr
Evoor - 35000 Ltr
Adhanur (Kattanampatti Kottam) - 35000 Ltr
Aiyampalayam New - 20000 Ltr
Kalingamudaiyanpatti - 25000 Ltr
Kannanur - 100000 Ltr
Kannanur palayam - 50000 Ltr
Keerambur - 20000 Ltr
Kollaptti - 35000 Ltr
Kombai - 10000 Ltr
Kottaiyur - 65000 Ltr
Kunnupatti - 80000 Ltr
Madhurapuri (Devanganagar) - 25000 Ltr
Maruvathur - 15000 Ltr
Murugur - 45000 Ltr
Muthaiyampalaym - 25000 Ltr
Naduvalur - 20000 Ltr
Narasingapuram - 55000 Ltr
Pagalavadi (Thavittupatti) - 100000 Ltr
Perumalpalayam - 70000 Ltr
Ponnusangampatti - 20000 Ltr
Sellipalayam - 50000 Ltr
Senappanallur - 10000 Ltr
Sikkathambur - 20000 Ltr
Singalanthapuram - 95000 Ltr
Sorathur - 20000 Ltr
T.Renganathapuram - 65000 Ltr
VA Samuthram - 15000 Ltr
Veeramachampatti - 20000 Ltr
Venkatathanur - 40000 Ltr
Venkatesapuram - 10000 Ltr
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE A4 (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
For the Year 2026 - 2027. (From 01.04.2026 to 31.03.2027)
( For the Year 2026 - 2027 - 7 Months) Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.26 LL to 1.50 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
1.76 LL to 2.00 LL capacity of sump
2.00 LL to 3.00 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the OPVC pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm OPVC 12.5KSC
160mm OPVC 12.5KSC
110mm OPVC 12.5KSC
Attending Leaks in the HDPE pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Fusion joint and Stud End and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm HDPE PN- 6SKC
180mm HDPE PN- 6KSC
160mm HDPE PN- 6KSC
140mm HDPE PN- 6KSC
125mm HDPE PN- 6KSC
110mm HDPE PN- 6KSC
90mm HDPE PN- 6KSC
75mm HDPE PN- 6KSC
63mm HPDE PN- 6KSC
50mm HDPE PN- 6KSC
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
350mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
150mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
25mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
50 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in FCMA Soft , MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988 .
3C 50sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. .
Upto 5 A
Supply and Delivery of Porcelian Fuse Units
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS .
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator .
Ammeter .
Digital Ammeter 3 Phase
Voltmeter .
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications .
Change Over Switch .
Light Emitting Diode .
15W Led Bulb
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004 .
Supply and Delivery of GI Specials as per IS 1239/PART II/2004 .
GI Bend
Supply and Delivery of End Termination and Joint Kits
Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete.
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2027 - 2028. (From 01.04.2027 to 31.03.2028)
Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.26 LL to 1.50 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
1.76 LL to 2.00 LL capacity of sump
2.00 LL to 3.00 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the OPVC pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm OPVC 12.5KSC
160mm OPVC 12.5KSC
110mm OPVC 12.5KSC
Attending Leaks in the HDPE pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Fusion joint and Stud End and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm HDPE PN- 6SKC
180mm HDPE PN- 6KSC
160mm HDPE PN- 6KSC
140mm HDPE PN- 6KSC
125mm HDPE PN- 6KSC
110mm HDPE PN- 6KSC
90mm HDPE PN- 6KSC
75mm HDPE PN- 6KSC
63mm HPDE PN- 6KSC
50mm HDPE PN- 6KSC
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
350mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
150mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
25mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
FROM 60 HP TO 200 HP VERTICAL TURBINE PUMPSETS
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
60 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
50 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
FROM 1 HP TO 30 HP MONO BLOCK PUMPSETS
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in FCMA Soft , MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988 .
3C 50sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. .
Upto 5 A
Supply and Delivery of Porcelian Fuse Units .Pg.219, item 6)M-1392, M-1393, M-1394
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS .
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator .
Ammeter .
Digital Ammeter 3 Phase
Voltmeter .
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications .
Change Over Switch .
Light Emitting Diode .
15W Led Bulb
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004 .
Supply and Delivery of GI Specials as per IS 1239/PART II/2004 .
GI Bend
Supply and Delivery of End Termination and Joint Kits
Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete.
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
For the Year 2028 - 2029. (From 01.04.2028 to 31.03.2029)
Operation and Maintenance of the Electro Mechanical installations, equipments, components, pipelines, valves and appurtenances,water retaining structures including protection of all scheme components from damages/theft, undertaking legal actions for such untoward incidents,preventive maintenance, disinfection and deliverance of water as per quality standards and supply of earmarked quantity of water to the beneficiaries, carrying out the O & M as per standard operating procedures,Acts and rules in force and as directed by TWAD Board Officers and excluding cost towards attending leak,burst, repairs and replacement works to electro mechanical installations, consumables for disinfection of water, cleaning of all water retaining structures, electricity
Cleaning of all storage points like sumps, stand posts of various capacities available in this scheme at a frequency of once in two months including scrapping the inner side of compartment completely, dewatering, desilting using rquired machineries , materials , labour, all incidental chargs , application of bleaching powder/ solution etc complete and as directed by TWAD Board officers
0.05 LL to 0.15 LL capacity of sump
0.31 LL to 0.45 LL capacity of sump
0.46 LL to 0.60 LL capacity of sump
0.61 LL to 0.75 LL capacity of sump
0.76 LL to 1.00 LL capacity of sump
1.01 LL to 1.25 LL capacity of sump
1.26 LL to 1.50 LL capacity of sump
1.51 LL to 1.75 LL capacity of sump
1.76 LL to 2.00 LL capacity of sump
2.00 LL to 3.00 LL capacity of sump
Attending Leaks in the pipelines of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying,jointing,civil works,cost of materials and all other incidental charges etc complete with in the stipulated time limit .(The specifications for attending leaks has to be detailed based on the data prepared and rate approval obtained for each size and material of pipes.
50mm 6 ksc PVC Pipes
63mm 6 ksc PVC Pipes
75mm 6 ksc PVC Pipes
90mm 6 ksc PVC Pipes
110mm 6 ksc PVC Pipes
140mm 6 ksc PVC Pipes
160mm 6 ksc PVC Pipes
200mm 6 ksc PVC Pipes
Charges for attending MS Pipe Leak by welding as per the standard specifications including hire charges for welding machine 3 phase, cutting set and grinding machine, diesel generator 3 phase 20 KVA which is used for lighting and to operate welding and grinding machine, transport to convey material machinery such as generator and tools, labour charges for welding around the MS Plate bits to required strength, ensuring no leakage and anti rust painting, including earthwork excavation ,removal of slushy soil ,dewatering , providing night lamps, barrigading arrangements, caution sign boards ,traffic diversion arrangements and all other incidental charges, supply of MS plate of suitable size and refilling etc., complete
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the DI pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
350mm DI K7 Pipes
300mm DI K7 Pipes
250mm DI K7 Pipes
200mm DI K9 Pipes
Attending Leaks in the OPVC pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Hemp Yarn and lead wool and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm OPVC 12.5KSC
160mm OPVC 12.5KSC
110mm OPVC 12.5KSC
Attending Leaks in the HDPE pipelines joints of this CWSS for the following items as per the standard procedure including earthwork excavation, dewatering, removing, relaying, jointing,civil works, hire charges of all equipments, cost of all materials such as cement, Quick setting compound, Fusion joint and Stud End and all other incidental charges etc complete with in the stipulated time limit and as directed by TWAD board Officers
200mm HDPE PN- 6SKC
180mm HDPE PN- 6KSC
160mm HDPE PN- 6KSC
140mm HDPE PN- 6KSC
125mm HDPE PN- 6KSC
110mm HDPE PN- 6KSC
90mm HDPE PN- 6KSC
75mm HDPE PN- 6KSC
63mm HPDE PN- 6KSC
50mm HDPE PN- 6KSC
Charges for Repair and Reconditioning of the Sluice Valves and Air Valves fixed in the Pumping Main, Feeder Main and Branch Main including cost of all materials and labour charges etc., complete
350mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
300mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
250mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
200mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
150mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
100mm Sluice Valve
Removing the top housing of the sluice valve by removing the rope gland and cutting the damaged / rusted bolt & nuts and removing the shutter with damaged check nut and spindle rod and providing necessary arrangement in the valve to block the flow of water beyond the valve including labour charges and tools materials.
Reconditining of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Supply and delivery of check nut in Gunmetal suitable for sluice valve including machining to square shape and inside threading to suit the spindle rod including cost of materials and lath work after deducting the cost of old materials.
Labour charges for fixing the spindle rod with check nut in the sluice valve body with shutter and fixing the top housing with required rubber sheet and bolt & nuts after deducting the cost of old materials.
Reconditioning of spindle rod (SS) suitable for sluice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of spindle rod (Brass) suitable for slice valve including machining the materials cutting and threading to suit the shutter and check nut including labour charges and lath work etc.,
Replacement of non functioning unserviceble Gun Metal Gate valve without affecting existing alignment by using contractor tools excluding the cost of valve but including required length of GI nipple, coupling etc., complete
65mm GM Valve
50mm GM Valve
Repair and Reconditioning of the Double Air Valve / Single Chamber Air Release Valve including the Cost of Air Valve Ball, Rubber Washer and required Bolt & Nuts, etc., complete
80mm Air Valve
50mm Air Valve
25mm Air Valve
Rewinding of motors in pumping station in the Electrical, Mechanical and Electro-mechanical items to bring back the scheme / components into normal running conditition as per standard specification including all labour charges, cost of materials and all incidental charges, taxes within the stipulated time limit etc., complete
FROM 0.5 HP TO 30 HP OPENWELL SUBMERSIBLE PUMPSETS
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
Removing the Submersible pumpset by using tripod set after disconnecting the power supply cable and delivery pipe line fittings
Transporting the pumpset from Pump House to work shop.
Rewinding the submersible motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Reconditioning the worn-out shaft and fittings, impeller and Gun Metal/ SS Bushes including cost of lath work & labour charges etc.,
Replacement of carbon type thrust bearing and pumpside Gun Metal Bush including cost of labour charges after deducting the cost of old material
Transporting charges for Submersible pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using tripod set and required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipeline arrangements testing to trial pumping.
FROM 60 HP TO 200 HP VERTICAL TURBINE PUMPSETS
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
60 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
Charges for removing the motor from bed after disconnection of power supply cable, Earthing line and Coupling arrangements by using contractor tools and materials.
Transportation charges for conveying the motor from the Station to Our work shop including loading and unloading charges.
Labour Charges for removing the two end side cover with fan arrangements and Dismantling the damaged NDE Side ball Bearing from the motor after removing the Rachet assembly load bearing safely and Fixing the New ball Bearing in the appropriate place with required lubricants without any damage to the motor shaft and winding after deducting the old damaged materials.
Charges for removing the burnt wires from the rotor assembly and cleaning and checking the slots of rotor and labour charges for rewinding of Centrifugal Squirrel Cage Induction Motor after deducting the cost of old materials and including suppy and delivery of Class ‘F’ Insulation Super enameled Copper wire, required for rewinding and Fiber Glass wire, Fiber Glass Sleeves, Class ‘F’ insulation paper, Copper Socket and FG thread required for rewinding of Squirrel Cage Induction Motor
Labour Charges for reconditioning the worn out shaft for driven end and non driven end bearing seating, knurling, bend checking, and etc.,
Supply and delivery of Non Driven End Deep Grove ball Bearing SKF Make suitable for the Squirrel Gage Induction Motor.
Labour Charges fixing the NDE bearings correctly and neatly with required lubrications by contractors tools & Materials
Transportation charges for conveying the motor from work shop to site of work
Charges for reassembling the motor with bed and pump coupling, alignment checking connecting power supply cable, including required bolt and Nuts and testing trial running etc.,
Carrying out the repair works occuring during the maintenance period in the Electrical, Mechanical and Electromechanical items to bring back the scheme / components into normal runnign condition as per specification
50 HP VT Pump
Supply and Delivery of SS 410 New Pump Head Shaft for required mm and required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and Delivery of SS 410 New Pump Line Shaft for required mm and required length. (including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete)
Supply and delivery of stuffing box brone bush suitable for the Discharge Head assembly
Supply and Delivery of Required TVS Bolt , Nut and Washer for Bowl Assembly and all Column Pipe for inplace of Wornout Bolt and Nuts after deducting the cost of scrap materials and as Directed by TWAD Board Officers.
Supply and Delivery of Line shaft SS Coupling with Bush (including Raw Materials, Machining , Polishing etc., Complete)
Supply and Delivery of SS Sleeves Suitable for the Line Shaft for Inplace of Wornout SS Sleeves after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and Delivery of Spider Rubber Bush made in Hard Rubber and Finishing to Suit in Between the Casting Spider and Line shaft inplace of wornout Rubber Bush after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of Bronze Bush Bearing Suitable for Bowl Assembly and Pump Shaft inplace of wornout bronze Bush Bearing after deducting the cost of scrap materials as directed by TWAD Board Officers.
Supply and Delivery of 1.Bronze Bush Bearing Suitable for the Bowl Assembly (Top Side) 2. Bronze Bush Bearing Suitable for the Bell Mouth(Bottom) for inplace of wornout Bronze Bush Bearings after deducting the cost of scrap materials as Directed by TWAD Board Officers.
Supply and delivery of MS Seamless required size of Coloumn pipe suitable for the VT Pumpset
Supply and delivery of spider suitable for the coloumn pipe including cost of Raw Materials, welding, polishing etc., complete as directed by TWAD officers
Supply and delivery of new intermedia ring (Prosperous bronze metal) between bowl assembly and as directed by TWAD officers
Supply and delivery of new bowl shaft for required size for required length.(including Charge for Lathe Works, Grinding, Polishing, Threading, Key Way and other works etc.,Complete) and as directed by TWAD officers
Supply and delivery of Load Bearing (Ratchet assembly) including Required Grade lubricating components
FROM 1 HP TO 30 HP MONO BLOCK PUMPSETS
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Removing the Monblock Centrifugal Pumpset from the Bed assembly by using contractors tools and materials after disconnecting the power supply cable and delivery pipe line fittings with required dummy plate arrangements.
Transporting the pumpset from the Pumping Station to work shop.
Removing the Burnt winding materials from the stator slots and cleaning the stator and rotor assembly by using contractor tools and materials
Reconditioning the worn-out shaft and fittings, impeller and Rope gland bush including cost of lath work & labour charges etc.,
Rewinding the Monblock Centrifugal Motor using best quality winding wire including cost of wire, Sleeve, other insulating and fibre class materials after deducting the cost of old materials.
Replacement of driven end (No: XXXX) and Non driven end (No:XXXX) Bearings suitable for Monblock Centrifugal Motor including the cost of Bearing and labour charges after deducting the cost of old materials.
Replacement of cooling fan at motor end and Terminal Board for suitable for Monblock Centrifugal Pumpset and labour charges after deducting the cost of old materials.
Transporting charges for Monblock Centrifugal Pumpset from work shop to Pump House after attending repair works.
Re-erection of pumpset in the Sump / Well by using required Rubber washer and Bolt & Nuts and connecting the power supply cable and delivery pipe line arrangements, testing and trial pumping.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in DOL and Star Delta Starters, MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Labour Charges for Repair and replacement of spares in FCMA Soft , MV Panel Board with required cables and allied works excluding the cost of Volt Meter, Ammeter, Single Phase Preventor, timer, MCCB,Contactor and required KVA Capacitor.
Supply and Delivery of LT Aluminium Armoured Cable conforming to IS 7098 (Part I) / 1988 .
3C 50sq.mm
Supply and Delivery of PVC Insulated and Sheathed 3 Core Flat copper cable conforming to IS 694 / 1990
Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS with ISI marking
Directly operated Bimetallic Thermal overload relay which operates in case of overload and also in case of under voltage with manual and auto reset mode. .
Upto 5 A
Supply and Delivery of Porcelian Fuse Units
Supply and Delivery of Moulded Case Circuit Breaker For FCMA Soft Starter and other starters in TS, BS and GS .
M-1859 400A 3 Pole MCCB
250A 3 Pole MCCB
Supply and Delivery of MCB Isolator .
Ammeter .
Digital Ammeter 3 Phase
Voltmeter .
Digital Voltmeter 3 Phase
Supply and Delivery of 150mm dia Pressure Guage and Vaccum Guage including all accessories as per specifications .
Change Over Switch .
Light Emitting Diode .
15W Led Bulb
Supply and Delivery of GI Pipes (Medium) as per IS 1239/PART I/2004 .
Supply and Delivery of GI Specials as per IS 1239/PART II/2004 .
GI Bend
Supply and Delivery of End Termination and Joint Kits
Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete.
Supply and delivery of Woltman model with removal mechanism water meters, (No domestic use) conforming to ISO 4064 part I, II, III Class B and IS-2373 with life cycle test certificate from FCRI/ NABL accredited lab. The watermeter shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.
Supply, delivery and application of disinfection dosages as per standard norms / guidelines including cost of disinfectents such as bleaching powder/ Common Salt as applicable. The supply should be with the quality test certificate from approved organisations.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BID2.pdf
Tender Documents • 2.21 MB
Flowdigram1.pdf
Additional Documents • 19.14 MB
Flowdigram2.pdf
Additional Documents • 11.20 MB
BOQ_767274.xls
BOQ • 1.83 MB
Download all tender documents and submit your bid