| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance 00 NEAR SHIV MANDIR NASIRABAD MILAK RAMPUR UTTAR PRADESH 243701 | 243701 | L1 | Admitted-Finance |
Tender Value
₹13.1 L
EMD Value
₹26,150
Closing Date
27 Feb 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
RCC drain construction work in Ward-27, Mathurapur, from Rajeshs house to Kailashs house.
2026_DOLBU_1118911_1
392/CE/CD/25-26 (1 To 20) Sr No 17 LIST NO 35 DATE 18-02-2026
Open Tender
Civil Works
Percentage
90 days
NAGAR NIGAM BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
Bareillyetender.com
₹26,150
13 May 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251)
Sand filling in plinth including supply of necessary quality of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc rquired for proper completion of the work. (Rate is including Royality)
Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3.1 including supply of all materials, labour and T&P etc., required for proper completion of the work
R.C.C In Sub Structure: Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate retard setting of concrete, to improve durability and workability without impairing strength, including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering. finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. 5.33.1 All works upto plinth level 5.33.1.1 Concrete of M25 grade with minimum cement content of 330 kg/cum RATE (DSR Rate x 0.735x109/107)-9504.75 x 0.735x109/107
Providing and laying in position ready mixed or site hatched design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength, including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Note. Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement 5.33.2 All works above plinth level upto floor V level 5.33.2.1 Concrete of M25 grade with minimum cement content of 330
Foundations, footings, bases of columns, etc. for mass concrete RATE= (DSR Rate x 0.735x109/107) =392.15 x 0.735x109/107 raft
Columns, Pillars, Piers, Abutments, Posts and Struts RATE= (DSR Rate x 0.735x109/107) 961.30 x 0.735x109/107 Wall upto NGL Slab
Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
PVC Pipe 63mm for Weep hole
Supply and laying of empty cement bags filled with local earth sand and carriage up to site of work including stiching loading and unloading stacking and also including supply of all material labour T&P required for proper completion of the work etc.as per direction of Engineer In charge.
Providing cost of dewatering including cost of boring, laying of 4" dia P.V.C. Pipe, Hire charges of 7.50 K.V. Deisal pumping Set, Hire Charges of P.V.C. pipe & cost of 4" dia plastic pipe for disposal of water as required distance also including wages of repairing leakage during operation with hire charges of tractor including loading and unloading of pumping set.
Providing Barricading for three days with sall ballies having vertical posts (dia 10-15 cm.) at distance 2.1 mtr. c/c and horizontal ballies (dla 7.5 to 10 cm.) in 3 rows including digging holes for fixing vertical post and binding with nariyal rope complete. Height of vertical post should not be less than 1.8m above ground level and it should be minimum 0.45m belaw ground level. The job work includes erection & dismantling of barricades and also includes reffilling of dugged holes after dismantling of barricades.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.03 MB
BOQ_2080028.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .