Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43.7 LAdmitted-Fee/PreQual/Technical/Finance AT DUMDUMA HB COLONY PO DUMDUMA DIST KHURDHA | BALANGIR | ODISHA | 767001 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹43.7 LAdmitted-Fee/PreQual/Technical/Finance AT KAIJANGA PO SISILO BALAKATI DIST KHURDA | BALAKATI | KHURDA | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹43.7 LAdmitted-Fee/PreQual/Technical/Finance KALAHANDI ODISHA | KALAHANDI | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹43.7 LAdmitted-Fee/PreQual/Technical/Finance AT KALIGHADI PO GADASAHI PURI | PURI | PURI | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹43.7 LAdmitted-Fee/PreQual/Technical/Finance NEAR SIRULI MAHAVIR TEMPLE KALIKANUAPADA SIRULIPURI | SIRULIPURI | PURI | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹43.7 L
EMD Value
₹43,680
Closing Date
9 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE L.I. DIVISION BHUBANESWAR
EE L.I. DIVISION BHUBANESWAR
REINFORCEMENT OF GUADIA-II AND MULABASANTA-I AND MULABASANTA-II AND KARAMALA OLD OPERABLE LI PROJECT (RIVER LIFT) UNDER SSS 2026-27 IN KANAS BLOCK OF PURI DISTRICT
2026_OLIC_144401_33
BID NO.01/2026-27 DT.15.10.2026
Open Tender
Civil Works - Lift Irrigation Schemes
Percentage
90 days
KANAS
Please refer tender documents
2 documents required · 2 mandatory
₹7,080
Yes
₹43,680
Yes
11 Nov 2026
29 Oct 2026
10 Nov 2026
29 Oct 2026
9 Nov 2026
29 Oct 2026
29 Oct 2026 - 7 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of Foundation and plinth in hard soil including dressing and levelling of bed within initial lead of 50mtr.andlifi 1.5mtr etc complete as per the direction of the Engineer-in-charge. | 1,894.78 | Cum | 129.69 | ₹2,45,734.02 |
| 2 | Filling in foundation and plinth with sand including watering and ramming etc complete as per the direction of the Engineer-incharge. | 92.71 | Cum | 1,221.15 | ₹1,13,212.82 |
| 3 | Cement concrite(1:4:8) with 4cm size h.g.b. crusser broken metal of approved quality from approved quarry with ramming watering and curring etc.complete including cost , taxes, royality convence charges of all materials to work site,supply of cement T&P required etc.comelete as per the direction of the Engineer-incharge. | 9.19 | Cum | 7,215.09 | ₹66,306.68 |
| 4 | Cement concrite(1:2:4) with 12mm size black Crusher broken chips of approved quality from approved quarry with ramming watering and curring etc.complete including supply of all labours, cost.taxes,royality convence charges of all materials to work site,supply of cement T&P required etc.comelete as per the direction of the Engineer-incharge. | 2.56 | Cum | 9,295.61 | ₹23,796.76 |
| 5 | Brick work with flyash Brick 25cm x 12cm x 8cm size having croshing strength not less than 100kg/cm2 to149kg/cm2 with dimensional tolerrance± 8% in cement morter (1:6) in foundation and plinth etc. complete as per the Engineer-incharge. | 19.88 | Cum | 6,469.62 | ₹1,28,616.05 |
| 6 | 12mm thick cement plaster in cement morter(1:6)finished smooth to brick work after racking out joints including watering and curring etc.complete including cost.taxes,royality convence charges of all materials to work site,supply of cement T&P required etc.comelete as per the direction of the Engineer-in-charge. | 299.94 | Sqm | 205.6 | ₹61,667.66 |
| 7 | R.C.C worrk for walls and fins of M-20 grade with 20 mm and down grade black hard granite (crushbroken) stone chips including hoisting and laying with centering and shuttering complete. | 18.78 | Cum | 11,878.34 | ₹2,23,075.23 |
| 8 | Cost of suplying HYSD steel bars for R.C.C. work including Labour charges for cutting, bending,binding,Straightening and laying grills and placing in position including cost of binding wire 18 to 20 gauge | 18.78 | Qntl | 8,590.88 | ₹1,61,336.73 |
| 9 | Cement punning over plastering including watering & curing with cost, taxes, royality & conveyance charges of all materials & supply of all materials & T& P etc complte as per direction of Engineer- in - charge. | 282.75 | Sqm | 41.81 | ₹11,821.78 |
| 10 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-incharge. | 1,819.75 | Cum | 72.05 | ₹1,31,112.99 |
stage.html
html • 0.03 MB
finance_616224.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_616224.xls
BOQ • 0.34 MB
Corrigendum-01-2026-27.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .