Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.8 LAccepted-Finance 0 2 | NAINITAL | UTTARAKHAND | 244713 | L1 | Accepted-Finance LOWEST | |
| 2 | L2₹71.7 L+₹1.9 L (2.70%)Accepted-Finance | L2 | Accepted-Finance HIGHER | |
| 3 | L3₹73.5 L+₹3.6 L (5.18%)Accepted-Finance | L3 | Accepted-Finance HIGHER | |
| 4 | L4₹74.3 L+₹4.4 L (6.37%)Accepted-Finance | L4 | Accepted-Finance HIGHER | |
| 5 | L5₹75.4 L+₹5.5 L (7.94%)Accepted-Finance | L5 | Accepted-Finance HIGHER |
| Sl No | Description | Qty | Unit | Prakash chandra bhatt L1 | Sanjay Pandey L15 | m/s gautam singh mehta L4 | Yogesh Tewari Contractor L10 | Rajesh giri L7 | Rohit Kumar Bisht L3 | SACHIN JOSHI L5 | Naveen Chandra Bhatt L11 | HIMALAYA CONSTRUCTION & BUILDERS L13 | SURVIKSH CONSTRUCTION L14 | Manoj rai L6 | OMKAR CONSTRUCTION L12 | Khilanand Bhatt L2 | RAJENDRA SINGH BOHRA L9 | s d construction L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 59.62 | Cum | 800 ₹47,696 | 1,869 ₹1,11,429.78 | 1,919.42 ₹1,14,435.82 | 1,736 ₹1,03,500.32 | 900 ₹53,658 | 250 ₹14,905 Lowest | 1,930.55 ₹1,15,099.39 | 1,983.62 ₹1,18,263.42 | 800 ₹47,696 | 1,129 ₹67,310.98 | 900 ₹53,658 | 1,800 ₹1,07,316 | 750 ₹44,715 | 1,601 ₹95,451.62 | 1,000 ₹59,620 |
| 2.00 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead : Of area 3 sq. metres and below | 14 | nos | 50 ₹700 | 130 ₹1,820 | 112.38 ₹1,573.32 | 121 ₹1,694 | 120 ₹1,680 | 50 ₹700 | 113.93 ₹1,595.02 | 121.37 ₹1,699.18 | 150 ₹2,100 | 30 ₹420 Lowest | 150 ₹2,100 | 100 ₹1,400 | 80 ₹1,120 | 117 ₹1,638 | 150 ₹2,100 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 167.5 | Cum | 100 ₹16,750 | 160 ₹26,800 | 139 ₹23,282.5 | 149 ₹24,957.5 | 160 ₹26,800 | 100 ₹16,750 | 140.92 ₹23,604.1 | 150.12 ₹25,145.1 | 120 ₹20,100 | 75 ₹12,562.5 Lowest | 150 ₹25,125 | 140 ₹23,450 | 100 ₹16,750 | 145 ₹24,287.5 | 150 ₹25,125 |
| 4.00 | CARRIAGE OF MATERIALS By Mechanical Transport including loading,unloading and stacking Earth 3km | 134 | Cum | 100 ₹13,400 | 248 ₹33,232 | 214.41 ₹28,730.94 | 230 ₹30,820 | 300 ₹40,200 | 50 ₹6,700 Lowest | 217.31 ₹29,119.54 | 231.57 ₹31,030.38 | 200 ₹26,800 | 75 ₹10,050 | 220 ₹29,480 | 200 ₹26,800 | 270 ₹36,180 | 201 ₹26,934 | 200 ₹26,800 |
| 5.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | 205.88 | Cum | 200 ₹41,176 | 343 ₹70,616.84 | 296.09 ₹60,959.01 | 318 ₹65,469.84 | 360 ₹74,116.8 | 100 ₹20,588 Lowest | 300.17 ₹61,799 | 319.77 ₹65,834.25 | 240 ₹49,411.2 | 150 ₹30,882 | 150 ₹30,882 | 290 ₹59,705.2 | 320 ₹65,881.6 | 310 ₹63,822.8 | 200 ₹41,176 |
| 6.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25 | 67.62 | Cum | 5,200 ₹3,51,624 Lowest | 6,892 ₹4,66,037.04 | 5,948 ₹4,02,203.76 | 6,400 ₹4,32,768 | 6,800 ₹4,59,816 | 6,400 ₹4,32,768 | 6,030.96 ₹4,07,813.52 | 6,424.82 ₹4,34,446.33 | 6,000 ₹4,05,720 | 8,000 ₹5,40,960 | 7,800 ₹5,27,436 | 7,000 ₹4,73,340 | 6,450 ₹4,36,149 | 7,000 ₹4,73,340 | 6,000 ₹4,05,720 |
| 7.00 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 Height upto 5m | 16.18 | Cum | 5,200 ₹84,136 Lowest | 7,941 ₹1,28,485.38 | 6,854.22 ₹1,10,901.28 | 7,374 ₹1,19,311.32 | 8,800 ₹1,42,384 | 6,800 ₹1,10,024 | 6,948.76 ₹1,12,430.94 | 7,402.56 ₹1,19,773.42 | 8,000 ₹1,29,440 | 8,200 ₹1,32,676 | 7,800 ₹1,26,204 | 8,100 ₹1,31,058 | 8,450 ₹1,36,721 | 7,500 ₹1,21,350 | 8,000 ₹1,29,440 |
| 8.00 | Hand Packed stone filling in back ofwallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in-charge. (As per PWD Uttarakhand specifications) | 80.42 | Cum | 750 ₹60,315 | 880 ₹70,769.6 | 760.3 ₹61,143.33 | 817 ₹65,703.14 | 600 ₹48,252 | 300 ₹24,126 Lowest | 770.79 ₹61,986.93 | 821.13 ₹66,035.27 | 1,000 ₹80,420 | 400 ₹32,168 | 500 ₹40,210 | 900 ₹72,378 | 480 ₹38,601.6 | 800 ₹64,336 | 800 ₹64,336 |
| 9.00 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 6.64 | Tonne | 62,000 ₹4,11,680 | 55,492 ₹3,68,466.88 | 47,895 ₹3,18,022.8 Lowest | 51,528 ₹3,42,145.92 | 60,000 ₹3,98,400 | 65,000 ₹4,31,600 | 48,556 ₹3,22,411.84 | 51,727 ₹3,43,467.28 | 60,000 ₹3,98,400 | 62,000 ₹4,11,680 | 59,000 ₹3,91,760 | 57,000 ₹3,78,480 | 59,800 ₹3,97,072 | 62,207 ₹4,13,054.48 | 50,000 ₹3,32,000 |
| 10.00 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 1.59 | Tonne | 62,000 ₹98,580 | 56,750 ₹90,232.5 | 48,980.57 ₹77,879.11 Lowest | 52,696 ₹83,786.64 | 60,000 ₹95,400 | 65,000 ₹1,03,350 | 49,656 ₹78,953.04 | 52,899.01 ₹84,109.43 | 60,000 ₹95,400 | 63,500 ₹1,00,965 | 59,000 ₹93,810 | 58,000 ₹92,220 | 59,800 ₹95,082 | 61,350 ₹97,546.5 | 55,000 ₹87,450 |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
12 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RWD Champawat
EE RWD Champawat
Construction of Class Rooms 4 N0 at Goverment Inter College Champawat
2026_RES_100708_1
1554 Dated 26.09.2026
Open Tender
Civil Works
Item Rate
270 days
Champawat
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE RWD Champawat
₹2.0 L
28 Oct 2026
28 Sept 2026
13 Oct 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
45 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 59.62 | Cum | 2,225.42 | ₹1,32,679.54 |
| 2 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead : Of area 3 sq. metres and below | 14 | nos | 155.01 | ₹2,170.14 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 167.5 | Cum | 191.73 | ₹32,114.77 |
| 4 | CARRIAGE OF MATERIALS By Mechanical Transport including loading,unloading and stacking Earth 3km | 134 | Cum | 295.75 | ₹39,630.5 |
| 5 | Excavation in foundation for retaining, breast walls etc, in all types of soils
and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical
specifications Clause 305.1 of MORD Specifiction | 205.88 | Cum | 408.4 | ₹84,081.39 |
| 6 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25 | 67.62 | Cum | 8,205.4 | ₹5,54,849.15 |
| 7 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 Height upto 5m | 16.18 | Cum | 9,454.1 | ₹1,52,967.34 |
| 8 | Hand Packed stone filling in back ofwallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in-charge. (As per PWD Uttarakhand specifications) | 80.42 | Cum | 1,048.7 | ₹84,336.45 |
| 9 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 6.64 | Tonne | 66,062.9 | ₹4,38,657.66 |
| 10 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 1.59 | Tonne | 67,559.4 | ₹1,07,419.45 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.12 MB
BOQ_118705.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .