Loading…
Loading…
Tender ID
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
2 Apr 2026, 6:00 pmClosed
Executive Engineer, R & B Division, Patan
Construction of New Slab Drain Instead of Old Slab Drain on Dethali-Chandesar-Hishor Road Ch.3/800, Dist.Patan
288302
33 of 2025-26
Open
Civil Works - Bridges
Works
Patan
7 documents required · 7 mandatory
₹3,600
Yes
Executive Engineer, R&B Division, Patan
₹2.1 L
Yes
20 Mar 2026
20 Mar 2026
20 Mar 2026
2 Apr 2026
20 Mar 2026
Name of Work :-
Construction of New Slab Drain Instead of Old Slab Drain on Dethali-Chandesar-Hishor Road Ch.3/800,
Bill of Quantity
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
1 100.00 Diversion :- 1,818.31 Rupees One Rmt.
Providing Diversion of Road 5.50 mt width Hundred Eighteen
(having 5.80 mt Formation width) for Structure And Paise Thirty
by Providing & spreading Earth Work, 150mm
GSB,150mm WMM, 50mm BM, NP-3 900mm
dia pipe & Removing after completion of work.
The length of Road is Depend on site condition
etc. as directed by Engineer in charge.
2 872.00 Demolition including stacking of serviceable 1,133.89 Rupees One Cum.
materilas and disposal of unserviceable Hundred Thirty
materials with all lead and lift. Three And Paise
Eighty Nine Only
(i) R.C.C. work
3 1,275.00 Excavation for foundation in sand, gravel, clay 535.45 Rupees Five Cum.
Hundred Thirty Five
soft soils and murrum etc. including shoring, And Paise Forty
strutting dewatering as necessary and Five Only
disposing of the excavated stuff as directed.
(A) Depth upto 3.0 M. and lead upto 100m for
4 716.00 Excavation for foundation in sand, gravel, clay 628.19 Rupees Six Cum.
soft soils and murrum etc. including shoring, Eight And Paise
strutting dewatering as necessary and Nineteen Only
disposing of the excavated stuff as directed.
(B) Depth from 3.0 to 6.0 M.and lead upto
100m for 10 Cum
5 203.00 Providing and casting in situ Ordinary cement 3,573.53 Rupees Three Cum.
concrete M-150 for R.C.C. Raft and cut-off Hundred Seventy
walls including necessary shuttering laying, Three And Paise
Fifty Three Only
vibrating, ramming and curing complete.
6 1,830.00 Providing and casting in Controlled cement 4,982.99 Rupees Four Cum
concrete M-200 for R.C.C. return as per Hundred Eighty
drawings including centering shuttering, Two And Paise
Ninety Nine Only
scaffolding where necessary, laying vibrating,
curing and finishing complete.
(A) Height from 0.0 to 5.0 M.
(1) Piers (2) Abutment (3) RCC return
7 18.00 Providing and fixing in position Mild steel dowel 341.29 Rupees Three No.
Hundred Forty One
bars in pier caps or abutment caps for And Paise Twenty
anchorage in fixed end as per detailed Nine Only
drawings including cutting, bending and welding
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 1 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
8 18.00 Providing and fixing in position Mild steel dowel 399.70 Rupees Three No.
bars in pier caps or abutments caps for Nine And Paise
anchorage in free end as per detailed drawing Seventy Only
including cutting, bending and welding
9 36.00 Providing and casting in Controlled cement 4,705.59 Rupees Four Cum.
concrete M.250 for R.C.C. works in pier cap Hundred Five And
abutment cap and dirt wall including ordinary Paise Fifty Nine
cement concrete M.250 Bed block or pedestal
or required size below bearings as per detailed
drawings, centering, shuttering, scaffoldiring,
tar paper, wherever necessary, laying vibrating
curing and finishing complete.
10 297.00 Providing and casting in Controlled Cement 4,682.60 Rupees Four Cum.
concrete M.250 for R.C.C. solid slab including Hundred Eighty
centering, scaffolding, Tar Paper, Curing and Two And Paise
finishing complete.
11 35.00 Providing and casting in Controlled cement 4,142.66 Rupees Four Cum.
concrete M-200 for average 75 mm thick Hundred Forty Two
wearing coat laid as directed including And Paise Sixty Six
Hardner, tamping, vibrating, finishing, curing
and filling in joints with bitumen complete.
12 36.00 Providing and casting in Controlled cement 4,005.30 Rupees Four Cum.
Thousand Five And
concrete M.200 for approach slab including Paise Thirty Only
formwork curing and finishing complete.
13 64.33 Providing and laying in position FE 500D TMT 73,858.69 Rupees Seventy MT
bar reinforcement including cutting, bending, Eight Hundred Fifty
hooking and tying complete as per detailed Eight And Paise
Sixty Nine Only
drawings for the following.(A) Piers (B)
Abutments (C) R.C.C. Returns (D) Solid Slab
14 1,356.00 Filling available excavated earth (excluding 137.47 Rupees One Cum
rock) in trenches. plinth, sides of foundations Seven And Paise
etc. in layers not exceeding 20cm. in depth Forty Seven Only
consolidating each disposited layer by ramming
15 51.00 Providing and filling sand behind abutments 462.99 Rupees Four Cum
Hundred Sixty Two
and between returns in layers as directed. And Paise Ninety
16 13.00 Providing Pre-moulded asphalt filler joints as 703.53 Rupees Seven Sqm
Hundred Three And
per drawings. Paise Fifty Three
17 300.00 Providing & laying weep hole in Abutments, and 90.83 Rupees Ninety And No.
Paise Eighty Three
returns by using A.C. pipe of 100mm including Only
laying in proper grade and jointing the
completed as per detailed specification.
18 58.00 Providing and laying - Fitter Media 900mm 1,543.61 Rupees One Sqm
thick directed at the back of abutments, returns Hundred Forty
and wing walls as per detailed specifications. Three And Paise
19 12.00 Providing G.I. 100mm diameter water spouts 536.03 Rupees Five No.
Hundred Thirty Six
including necessary iron gratings as per And Paise Three
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 2 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
20 176.00 Construction of granular sub-base by 1,818.73 Rupees One Cum
providing well graded material, (Metal 25.60 Hundred Eighteen
mm to 53 mm 35%, B.T. Kapachi 25.60 mm to And Paise Seventy
4.75 mm 45% & Coarse sand below 2.38 mm
20% }spreading in uniform layers with motor
grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and
compacting with smooth wheel roller to
achieve the desired density, complete as
per Technical Specification Clause
21 220.00 Providing and laying, spreading and 1,835.01 Rupees One Cum
compacting graded stone aggregate to Wet Hundred Thirty Five
Mix Macadam (W.M.M.) specification including And Paise One
premixing the material with water at OMC in
mechanical mix plant carriage of mixed material
by tipper to site, laying in uniform layers with
mechanical means Paver Finisher in sub-base
/base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density.
22 66.00 Providing and laying 37.50 mm Th. Builtup 2,839.48 Rupees Two MT
spray grout base (BUSG) in Varying thickness Hundred Thirty Nine
for grade correction with asphalt VG-30 for tack And Paise Forty
coat at the rate of 2.50 Kg./ 10 Sqmt. B.T.
surface and using B.T. stone aggregates as per
required gradation with the asphalt of VG-30
grade at the rate of 1.99% i.e.19.90 Kg./M.T. by
weight by mix including heating and mixing in
drum mix plant, transporting the mix spreading
the same by paver finisher and consolidation by
vibrator roller MORTH specification including
cost of all materials, fuel labours, tools and
plant etc using contractor own drum mix plant
[With Tack Coat]
23 97.00 Providing & Laying 50mm thick Compacted 3,531.66 Rupees Three MT
Bituminous Macadam (BM) using crushed Hundred Thirty One
stone aggregate as per MORT & H gradation And Paise Sixty Six
with Asphalt VG-30 for Tack coat @ rate of
Kg. / 10 Sqm with mechanical sprayer & VG-30
Grade Bitumen @ Rate of 3.40% by weight of
total mix (i.e. 34kg/mt by wt. of total mix) for
binding including heating and mixing the
Asphalt and aggregates by continuous batch
mix plant and transporting the mix and
spreading the same by paver finisher and
consolidation with vibratory road roller including
using all necessary equipments, tools, plants,
including cost of all materials, firewood, oil,
lubricants, labour charges etc. complete. (With
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 3 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
24 41.00 Providing & laying 25mm. thick compacted 4,272.08 Rupees Four MT
SDBC with B.T. Stone chips as per MORT&H Hundred Seventy
gradation & specification with bulk asphalt VG- Two And Paise
30 (60/70) for mixing at the rate of
Kg./MT by wt. of total mix i.e.(5.00% by weight
of total mix) incl. heating the asphalt &
aggregates by contineous batching drum mix
plant & spreading the same by paver finisher
incl. rolling & Consolidation with 10-12 tonnes
vibratory & paver roller & pro. all materials,
equipments, tools and plants, fire wood, oil,
kerosene, labour charges etc and using
contractor's own machinaries drum mix plant &
paver finisher including supplying etc. complete
(Without tack coat)
25 75.00 Road Marking with Hot Applied thermoplastic 367.72 Rupees Three Sqm
Paints with Reflectorising glass beads on Seven And Paise
bitumen surface providing and laying a hot Seventy Two Only
applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250 gms
per Sqm area, thickness of 2.5 mm is excluding
of surface applied glass beds as per IRC:35-
2015.The Finished surface to be level, uniform
and free from streaks and holes, zebra patta /
bump patta lane / center line / edge line / cut
patta. The white colour marking should provide
luminance coefficient on cement road shall be
min 130 mcd/m2/lux and Asphalt road shall be
min 100 mcd/m2/lux during the service life
during the day time. The marking should meet
the performance criteria for night time
reflectivity, wet reflectivity and skid resistance
as mentioned in the section-15 of IRC 35-2015
and as directed by engineer in charge.
Warranty for retroreflectivy shall be two year.
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 4 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
26 54.00 Cat Eye / Road Stud / RPM : 326.23 Rupees Three No.
Hundred Twenty Six
Supplying Molded Twin Shanks Raised And Paise Twenty
Pavement Markers made of Polycarbonate and Three Only
ABS Molded body and Reflective Panels with
Micro Prismatic lens (No Glass bead lens)
capable of providing total internal reflection of
the light entering the lens face and shall
support a load of 13635 kgs. tested in
accordance to ASTM D 4280 Type H and
complying to Specifications of Category A of
MORTH Circular No. RW/NH/33023/10-97-DO
III, Dt.11/06/1997.The height, width and length
shall not exceed 20mm, 130mm and 130mm
and with minimum reflective area of 13 Sqcm
on each side and the slope to the base shall be
35+/-5 degree. The Strength of detachment of
the integrated cylindrical shanks. (of diameter
not less than 19+/-2mm and height not less
than 30+/-2mm) from The body is to be a
minimum value of 500 kgf. Fixing will be by
drilling holes on the road for the shanks to go
inside, without nails and using epoxy resin
based adhesive as per manufactures
recommendation and the colour of the marker
should be as per the IRC 35-2015 and as
directed by Engineer in charge.
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 5 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
27 2.00 Cautionary Warning Sign :- 3,906.19 Rupees Three No.
Providing and fixing sign boards made out of Hundred Six And
2mm aluminium sheet / 4mm ACP (Aluminum Paise Nineteen
composite Panel); size 90 x 90 x 90 cms.
equilateral triangle as per design of IRC-67-
2012. Pre treated with phospheting process &
acid etching; coated with one coat of epoxy
primer and two coats of best quality epoxy paint
; reflectorised with High Intensity Prismatic
Grade retro refiectivesheeting of Type-4 as per
ASTM D-4956 and latest M.O.S.T.
Specifications; 3.6mtr long stand post of Iron
Angle 75 x 75 x 6mm / 65NB Circular MS Pipe
as required and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm; painted with
bestquality epoxy coatings in black and white
bends. The details of symbol for each board
shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC
blockof size 45 x 45 x 60 Cms. for each leg
including excavation, curing etc.complete under
the supervision of engineer in charge. A
warranty for 7 years for the Retro reflective
sheeting from original manufacturer & a
certified copy of 3 year outdoor exposure test
report from third party test lab for the product
offered shall be submitted by contractor.
(B) Class-B Type-4 Retro Reflective sheeting
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 6 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
28 51.00 Providing Yellow & Black Patta (three coat) 97.48 Rupees Ninety Sqm
Seven And Paise
including Distempeing (Three coats) with oil Forty Eight Only
bound distemper of approved brand and
manufacture and of required shade on wall
surfaces to give an even shade, over and
including a priming coat with distemper primer
of approved brand and manufacture after
thoroughly brushing the surface free from
mortar dropping and other foreign matter and
also including preparing the surface even and
sand papered smooth as per instruction of
Engineer Incharge
29 709.00 Finishing wall with weather proof exterior 122.14 Rupees One Sqm
emulsion paint on wall surface (two coats) to Two And Paise
give an required shape even shade after Fourteen Only
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials.etc complete.
30 50.00 Type - A, "W" : Metal Beam Crash Barrier 3,405.72 Rupees Three Rmt
(Providing and erecting a "W" metal beam Hundred Five And
crash barrier comprising of 3 mm thick Paise Seventy Two
corrugated sheet metal beam rail, 70 cm above
road/ground level, fixed on ISMC series
channel vertical post, 150 x 75 x 5 mm spaced
2 m centre to centre, 1.8 m high, 1.1 m below
ground/road level, all steel parts and fitments to
be galvanised by hot dip process, all fittings to
conform to IS:1367 and IS:1364, metal beam
rail to be fixed on the vertical post with a spacer
of channel section 150 x 75 x 5 mm, 330 mm
long complete as per clause 811)
I / We am / are willing to carry out the work at …………………………………. % Above / Below percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of my / our tender works
Estimated Amount Estimated Amount
Put to Tender Rs……………………. Put to Tender Rs…………………….
Add ……..…. % Above Rs……………………. Deduct .………. % Below Rs…………………….
Net Rs……………………. Net Rs…………………….
* (Please strike out whichever is not applicable)
Note 1 :- All work shall be carried out as per public works department Handbook and other specifications of
Division or as directed.
Note 2 :- All the columns is Schedule should be filled in ink and the total of the entries in the last column
should be struck by the contractor under his signature.
Note 3 :- Rates quoted include clearance of site (prior commencement of work and at its close) in all respects
and hold good for work under all conditions, site, moisture, weather etc.
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 7 of
It Quantities Item of Work Estimated Rate Unit Total Amount
It Quantities Item of Work Estimated Rate Unit Total Amount
No. estimated According to
Rs. In In Words
but may Estimated
Note 4 :- To be continued on additional sheets, if found necessary.
Note 5 :- Credit for Dismantle Material Rs.3,25,000/- will be deduct from R.A.Bill (Fix Deduction)
Dated Signature of the contractor
Deputy Executive Engineer Executive Engineer
Road & Building Sub Division Road & Building Division
F:\T.I. 2025-26\NIVIDA-33\DTP (3.800 Slab)\DTP D-C-H (3.800) Sh-B Page 8 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BRIDGE WORKS SPECIFICATIONS1.pdf
Tender GR Road - Bridges (1).pdf
BOQ.pdf
DTP Spec D-C-H _3.800_.pdf
Index Specifications.pdf
MTS.pdf
Notes.pdf
SBD Booklet _D-C-H_ 3.800.pdf
Speci. Quality.pdf
Spl. Condition (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .