| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance LOWEST ON QUOTED RATES | |
| 2 | K P BIJU L2₹3.6 L+₹20,790 (6.15%)Rejected-Finance | L2 | Rejected-Finance QUOTEDRATES ARE HIGH | |
| 3 | L3₹3.7 L+₹30,455 (9.01%)Rejected-Finance | L3 | Rejected-Finance REJECTED SINCE THE QUOTED RATES BEING HIGH |
Tender Value
Refer Docs
EMD Value
₹7,228
Closing Date
26 Jun 2023, 6:00 pmClosed
EE(c) BSNL CIVIL
EE(c) BSNL CIVIL DIVISION ,THRISSUR
Re-construction of the Slanted portion of Compound Wall at Telephone Exchange Compound ,VALAPPAD.
2023_BSNL_158111_1
14/EE/TCD/TCR/2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
Valappad
2 documents required · 2 mandatory
₹590
Ao(cash) O/o PGMT,BSNL Thrissur
₹7,228
3 Jul 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
26 Jun 2023
20 Jun 2023
Amount
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
a) Beyond 60 cm girth up to and including 120 cm girth
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
a)1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
a) Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level / Above Plinth Level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Brick work with available bricks of class at site in superstructure above plinth level up to floor V level in all shapes and sizes in :
a) Cement Mortar 1:6 (1 cement : 6 coarse sand).
Random rubble masonry with available stones in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :
a) Cement Mortar 1:6 (1 cement : 6 coarse sand).
Providing and Laying Precast Machine Moulded Cement concrete solid Blocks in Block Masonry of specified thickness with Blocks of grade C95) with minimum compresssive strength of 5N/mm2 and block density not less than 1800Kg/Cum conforming to IS:2185 nominal size 400x200x200mm in cement concrte 1:4:8 ( 1cement ; 4Coarse Sand ( Crushed Stone sand ) -: 8 graded stone aggregate 12mm nominal size ) with cement mortar 1:4 (1cement : 4 Coarse Sand ( Crushed Stone sand ) -) including scaffolding,raking out joints and filling the joints with cement mortar ,finishing neatly etc.above plinth level upto all floor Level complete as directed by the Engineer-in-Charge. a) In Cement Mortar 1:6 ( 1cement : 6 Coarse Sand -CC Solid block masonry : i) Compound walls
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :
a) Cement mortar 1:6 (1 cement : 6 coarse sand).
12 mm cement plaster of mix :
a) 1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
a)1:6 (1 cement: 6 fine sand)
Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) :
a)Flush/ Ruled pointing
Finishing walls with Acrylic Smooth exterior paint of required shade :
a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
a) In cement mortar
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
a)From brick work in cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :
a) In cement mortar
K P BIJU
LIJO V O
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .