Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
19 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of Xen PMGSY Budhal
Office of Xen PMGSY Budhal
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of snow likely to be occurred during the financial year 2025-26 on 1. L027 to Kothra, Pkg No. JK12-332, Length 09s
2025_JKRRD_145878_7
EE/PMGSY/B/27OF 2025-26 DT.12.12.2025
Open Tender
CIVIL
Percentage
1 days
Budhal
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of snow likely to be occurred during the financial year 2025-26 on
1. L027 to Kothra, Pkg No. JK12-332, Length 0
3 documents required · 3 mandatory
₹600
Office of Xen PMGSY Budhal
₹30,000
Yes
Office of Xen PMGSY Budhal
13 Dec 2025
13 Dec 2025
20 Dec 2025
13 Dec 2025
19 Dec 2025
13 Dec 2025
16 Dec 2025
Clearing snow (without frost) from roads manually / Mechanically
Snow depth upto 150mm
Snow depth over 150mm but upto 250mm
Snow depth over 250 mm but upto 350mm
Snow depth over 350 mm but upto 450mm
Snow depth over 450 mm but upto 550 mm
Snow depth over 550 mm but upto 650 mm
Snow depth over 650 mm but upto 750 mm
Snow depth over 750 mm but upto 850 mm
Snow depth over 850 mm but upto 950 mm
Snow depth over 950 mm but upto 1050 mm
Snow depth over 1050 mm but upto 1150 mm
Snow depth over 1150 mm but upto 1250 mm
Galla Cutting in Compressed Snow
1200mm deep and 4m wide
Felling of Trees
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth.
Slip Clearance
Disposal of excavted earth / mulba by M.T for 1 KM Average. (Accumulated in drain)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_226287.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .