Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L Quoted ₹4.8 L | L1 | Accepted-AOC Award |
| 2 | L2₹5.3 LRejected-Finance | ₹5.3 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹5.6 LRejected-Finance | ₹5.6 L | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | Ramesh Kumar Chaudhary L3 | Vikram Guleria L1 | BILBIR SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared in all leads and lifts. | 960 | Sqm. | 30 ₹28,800 | 26 ₹24,960 | 28 ₹26,880 |
| 2.00 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portions requiring blasting upto a distance 20 meters in all leads and lifts complete in all respect as per direction of the Engineer-in-Charge. | 775 | Cum | 475 ₹3.7 L | 400 ₹3.1 L | 450 ₹3.5 L |
| 3.00 | Boulder filling dry hand packed tightly under floors in all leads and lifts. | 63 | Cum | 1,375 ₹86,625 | 1,300 ₹81,900 | 1,350 ₹85,050 |
| 4.00 | Laying,Jointing Testing and commissioning of HDPE pipes(High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 fusion welding process including all necessary fittings in all leads and lifts to be entitre satisfaction of Engineer-In- Charge(Earth work in trenches to be measured and separately.) HDPE Pipe 315mm dia PE PN 4.00 | 200 | Rmt. | 385 ₹77,000 | 320 ₹64,000 | 370 ₹74,000 |
Tender Value
₹5.2 L
EMD Value
₹10,350
Closing Date
15 Jan 2026, 5:00 pmClosed
Executive Engineer
EE JSV MAndi
Providing Laying Jointing and Testing of HDPE pipe 315mm dia PE 80 PN 6.00 200 Rmt at Sain Curve for temporary restoration of main sewer line
2026_HPIPH_125108_1
15914-16013
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹10,350
17 Mar 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared in all leads and lifts.
Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portions requiring blasting upto a distance 20 meters in all leads and lifts complete in all respect as per direction of the Engineer-in-Charge.
Boulder filling dry hand packed tightly under floors in all leads and lifts.
Laying,Jointing Testing and commissioning of HDPE pipes(High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 fusion welding process including all necessary fittings in all leads and lifts to be entitre satisfaction of Engineer-In- Charge(Earth work in trenches to be measured and separately.) HDPE Pipe 315mm dia PE PN 4.00
BILBIR SINGH (BID ID -609248)
Ramesh Kumar Chaudhary (BID ID -609258)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.58 MB
BOQ_184194.xls
BOQ • 0.28 MB
Form8.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid