Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC AGG EXECUTED | |
| 2 | L2₹2.5 L+₹25.42 (0.01%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
11 Feb 2026, 5:00 pmClosed
O/O Assistant Engineer, LIDEW Section, Vithura Gp
O/O Assistant Engineer, LIDEW Section, Vithura Gp
Annual Plan -VITHURA GP PRO NO 35/25-26 Maintenance of Peppara Pannikuzhi anganwadi
2026_LSGD_833280_9
07/2025/AE/LIDEW/VTRA/ 07 PHASE
Open Tender
Civil Works - Others
Percentage
180 days
O/O Assistant Engineer, LIDEW Section, Vithura Gp
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,355
Yes
4 May 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
building maintenance
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.5.1:Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
OD283646/2025-2026:PVC Weep Holes-providing weep holes using 63mm dia. PVC pipes working pressure 4kg/cm2 including cost of materials, conveyance, labour charges etc. complete.
11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment
OD321902/2025-2026:Supplying and fixing granite name board of size 75x60 cm size installed in appropriate place complete as per direction of Engineer-in-charge
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1401306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 0.30 MB
Tendernotice_4.pdf
PDF • 0.33 MB
Tendernotice_5.pdf
PDF • 0.25 MB
sbd35.pdf
Other Document • 1.91 MB
pag35.pdf
Other Document • 0.10 MB
BOQ_1401306.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .