Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Complied |
| 2 | Accepted-Technical | Accepted-Technical Complied |
| 3 | Accepted-Technical | Accepted-Technical Complied |
| 4 | Accepted-Technical | Accepted-Technical Complied |
| 5 | Accepted-Technical PIPE NAGAR VILLAGE SUKELI BKG ROAD NH 17 TALUKA ROHA RAIGAD MAHARASHTRA 402126 | RAIGAD | MAHARASHTRA | 402126 | Accepted-Technical Complied |
Tender Value
Refer Docs
EMD Value
₹2.3 Cr
Closing Date
6 May 2026, 3:00 pmClosed
Aashish Gurawariya
Central Procurement Department, CDWG 15th Floor, Maker Tower E, Cuffe Parade, Mumbai- 400005
Charter Hiring of two or more MLT/BMC Jack up Rigs for 03 years
2026_ONGC_274451_1
ZW3AC26003
Global Tenders
Miscellaneous Services
Lump-sum
1095 days
CPD Mumbai
As per Tender
12 documents required · 12 mandatory
₹0
₹2.3 Cr
Yes
26 May 2026
10 Apr 2026
7 May 2026
10 Apr 2026
6 May 2026
10 Apr 2026
Annexure - IV - Appendix - 1
Please enter values in yellow shaded cells only.
Name of Bidder and name of Rig offered
Type of rig Charter Hiring of two or more rigs MLT/BMC Jack up Rig for 03 years Tender No. ZW3AC26003
Bidder's Quotation Reference
Currency of Quote
Table-A: Cost for Rig Hiring
SN Particulars Estimated Qty (a) UOM Unit Rate exclusive of GST (b) GST % (c) Amount of GST on the Unit rates (d) Unit Rate inclusive of GST (e=b+d) Total Rate inclusive of GST (f=a*e)
1 Mobilization Fee of rig along with all equipment and accessories as per tender document (A), if any (Lumpsum) 1 Lumpsum
2 Operating Day Rate (R1) 310 Days
3 Non-Operating Day Rate (R2) 38 Days
4 Equipment Break Down Rate (R3) 12 Days
4 Moving Day Rate (R4) 5 Days
6 De-mobilization Fee of rig along with all equipment and accessories as per tender document (B), if any (Lumpsum) 1 Lumpsum
Total cost for Rig Hiring (T1)=[A + {R1 (310x3) + R2 (38x3 + R3(12x3) + R4(5x3} + B]
Table-B: Cost for Diesel consumption (For Evaluation purpose only)
Price of diesel per KL intimated along with NIT by ONGC in INR (P) 84526
SN Particulars Estimated Qtr (a) UOM Average Diesel consumption per day in KL (b) Total Cost for Diesel consumption (c =a*b*P)
7 Average Diesel consumption for Drilling operations: D 288 Days
8 Average Diesel consumption forWorkover operations: W 23 Days 72 Days
9 Average Diesel consumption for Rig Move operations: R 18 Days 5 Days
Total cost on account of Diesel consumption (T2)= P * (D (288x3) + W (72x3)+ R (5x3)).
i) ONGC would provide required undertaking/ certificate to contractor for availing concessional rate of customs for import of rigs/ equipment/ tools required in connection with Petroleum operations, as per BEC clause. As per clause 15.6 of MCC, for rigs and ancillary items imported for Oil & Gas exploration & production, taken on lease by the Importer would be exempted from IGST, subject to certain conditions. If the rig is imported on Ownership basis, Bidder is to ascertain taxes & input tax credit, based on legal provisions considering nature of transaction. The bidder is advised to check latest position in their own interst and ONGC will not bear any responsibilites for any incorrect assessment of statutory leves by bidder. Rates should be quoted accordingly.
ii) Day Rate of rig should be inclusive of rig crew day rate.
iii) Bidders should quote rates / prices strictly, as per price format.
v) In case of foreign bidders, if GST registration certificate is not available at the time of submission of bid, the bidder shall submit an undertaking to provide copy of the same at least two weeks before submission of first invoice.
vi) Bidder must indicate the value of the rig and equipment as required at Appendix-2 of the price format.
vii) Bidder shall furnish alongwith technical bid (unpriced bid), a copy of Bidder's response sheet which is a Price format with the prices duly blanked out. While submitting alongwith the techno-commercial unpriced bid, bidder shall fill up information pertaining to “Type of rig offered” & “Quoted currency” and select option ‘Quoted’ or ‘Not Quoted’ against S. No. 1 to 9 as an indication of the item having been quoted by the bidder in the priced bid. If not quoted against any item, bidder may clearly indicate as ‘Not Quoted’.
viii) Bidders should quote the prices, clearly indicating the applicable rate of GST, nature / category of service as per GST rules (under which the respective service is covered) alongwith all other taxes and duties applicable. Details of abatements / deductions available, if any, should also be indicated by bidder specifically.
ix) Only for evaluation purpose, Price of diesel per KL is cnsider as INR 84,526.00. Bidders to quote average diesel consumption per day for three activities defined as above
x) Evaluation of bids shall be as per BEC clause C)
xi) Non Operating Day Rate & Rig Move day rate should not exceed 95% of Operating Day Rate. Equipment breakdown rate should not exceed 60% of Operating Day Rate. Ceiling on mobilization charges shall be as per BEC clause 15. The bidder(s) must adhere to the limits of Mobilisation fee , NODR, MDR and EBDR. However, after opening of price bids, if it is observed that such charges/amount quoted are higher than the limits for above parameters, the offer (s) of such bidder (s) shall be evaluated restricting the charges/amount up to the specified limit. Contract (in case the bidder becomes L-1) shall also be awarded restricting the charges / amount up to specified limit as above.
xii) Rate of Boarding & lodging as per STCC clause no.9 shall be included by contractor in their offered price.
xiii) The average quoted diesel quantity in KL/day for Workover/Testing mode and for Rig Move mode should not be equal to or more than the average quoted diesel quantity in KL/day for Drilling mode in price format
xiv) The bidders offering rigs to be mobilised from different zones will not be paid mobilization fee (MOB Fee) more than the amount as mentioned below: (i) Rigs to be mobilized from Indian EEZ- 2.6% of the total evaluated value for 01 Rig (excluding GST) as per the offer of the bidder (ii) Rigs to be mobilized from Middle East- 5.2% of the total evaluated value for 01 Rig (excluding GST) as per the offer of the bidder (iii) Rigs to be mobilized from Singapore/Far East-7.8% of the total evaluated value for 01 Rig (excluding GST) as per the offer of the bidder (iv) Rigs to be mobilized from areas other than (i), (ii) & (iii) above- 18.1% of the total evaluated value for 01 Rig (excluding GST) as per the offer of the bidder Note: The mob fee limitation is excluding GST. The bidder(s) must adhere to the above limits. However, after opening of price bids, if it is observed that such charges/amount quoted by the bidder (s) are higher than the limit for above parameter, the offer (s) of such bidder (s) shall be evaluated restricting the charges/amount up to the specified limit. Contract (in case the bidder becomes B-1) shall also be awarded restricting the charges / amount up to specified limit as above. The bidder shall submit an undertaking in this regard along-with techno-commercial bid as per format at Annexure –VI, Appendix– ...
xv) The number of days mentioned are indicative and for evaluation purpose only which may change (increase or decrease w/o restriction) as per operational requirement. However, payment shall be made as per actual days.
xvi) All quoted cost will be converted to INR as per BEC clause C.2 for evaluation
Annexure - IV - Appendix-2
ITEM Nature / category of service as per GST rules (under which the respective service is covered) SAC Code
i) In case the bidder has Indian Agent, the details of Indian Agent may be provided as under:
Amount or % of IAC included in quoted prices
ii) Value of the rig and equipment for customs duty purpose
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tender_Document.rar
Tender Documents • 5.06 MB
Price_Format.xls
Other Document • 0.04 MB
Corrigendum.rar
PDF • 0.09 MB
Date_Corrigendum.pdf
PDF • 0.08 MB
Corrigendum.rar
PDF • 3.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .