| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹20,972.11 (5.55%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.3 L+₹56,684.77 (15.0%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.5 L+₹69,830.78 (18.5%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹4.7 L+₹94,635.76 (25.1%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Bince Joy L3 | Nikhil C L1 | Rijo George L4 | JIJESHKUMAR P L6 | SUKUMARAN.R.K. L5 | NASIR K A L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Renovation | |||||||||
| 1.00 | 15.23.2:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm | 184.68 | sqm | 97.81 ₹18,063.65 | 85.04 ₹15,705.27 Lowest | 101 ₹18,652.78 | 109.31 ₹20,187.48 | 106.36 ₹19,642.67 | 90.07 ₹16,634.22 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 1.65 | cum | 1,298.18 ₹2,138.1 | 1,128.73 ₹1,859.02 Lowest | 1,331 ₹2,192.16 | 1,450.8 ₹2,389.47 | 1,411.63 ₹2,324.95 | 1,195.52 ₹1,969.02 |
| 1.00 | OD123293/2025-2026:Demolishing brick / laterite work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as per
direction of Engineer-in-Charge.In cement mortar (modified from 15.7.4) | 1.27 | cum | 1,778.73 ₹2,253.65 | 1,545.11 ₹1,957.65 | 1,831 ₹2,319.88 | 1,987.85 ₹2,518.61 | 1,934.18 ₹2,450.61 | 1,236.15 ₹1,566.2 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.21 | cum | 6,625.13 ₹14,654.79 | 5,760.34 ₹12,741.87 Lowest | 6,821 ₹15,088.05 | 7,404.03 ₹16,377.71 | 7,204.12 ₹15,935.51 | 6,101.64 ₹13,496.83 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 36.78 | sqm | 137.68 ₹5,063.87 | 119.71 ₹4,402.93 Lowest | 142 ₹5,222.76 | 153.87 ₹5,659.34 | 149.72 ₹5,506.7 | 126 ₹4,634.28 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 451.42 | sqm | 17.11 ₹7,723.8 | 14.88 ₹6,717.13 Lowest | 18 ₹8,125.56 | 19.12 ₹8,631.15 | 18.6 ₹8,396.41 | 15.66 ₹7,069.24 |
| 1.01 | 13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) | 451.42 | sqm | 170.03 ₹76,754.94 | 147.84 ₹66,737.93 Lowest | 175 ₹78,998.5 | 190.02 ₹85,778.83 | 184.89 ₹83,463.04 | 160 ₹72,227.2 |
| 1.01 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. | 206.16 | sqm | 1,483.63 ₹3,05,859.23 | 1,289.97 ₹2,65,935.06 Lowest | 1,528 ₹3,15,006.37 | 1,658.06 ₹3,41,819.02 | 1,613.29 ₹3,32,589.41 | 1,355 ₹2,79,341.38 |
| 1.01 | 17.7.4:Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Flat back wash basin size 550x 400 mm with single 15 mm C.P. brass pillar tap | 1 | each | 1,759.02 ₹1,759.02 | 1,529.42 ₹1,529.42 Lowest | 1,811 ₹1,811 | 1,965.82 ₹1,965.82 | 1,912.74 ₹1,912.74 | 1,620.02 ₹1,620.02 |
Tender Value
₹4.9 L
EMD Value
₹12,133
Closing Date
19 Sept 2025, 6:00 pmClosed
Pranam K T
O/o The Assistant Engineer, LID EW Section, Chittariparamba GP
Building maintenance
2025_LSGD_796757_7
AE/LIDEW/CPBA /ETEN/02/26
Open Tender
Civil Works - Roads
Item Rate
210 days
Chittariparamba
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,070
Yes
₹12,133
Yes
3 Feb 2026
12 Sept 2025
23 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .