| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC Accepted since lowest quoted rate |
| 2 | L2₹2.1 LRejected-AOC | ₹2.1 L | L2 | Rejected-AOC Rejected since higher rate |
| Sl No | Description | Qty | Unit | Prebin S.V L1 | Babu M L2 |
|---|---|---|---|---|---|
| 1.00Cleaning of thodu | |||||
| 1.00 | OD35370/2025-2026: Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the thodu by mechanical means or manual means with all lead and lift including disposal of the removed earth, silt, clay, mud etc to places as directed by the Engineer in charge, complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of
water in the thodu. | 483 | cum | 263 ₹1.3 L | 263.35 ₹1.3 L |
| 1.00 | OD35371/2025-2026:Premonsoon cleaning - conveyance /carriage charges for rubbish/silt/plastic collected from the site to contractors own dumping area within 5 km without causing damages to environment or society. | 386.4 | cum | 120.53 ₹46,572.79 | 120.53 ₹46,572.79 |
| 1.00 | OD35372/2025-2026:Engaging man coolies for removing the solid wastes including slaughter house waste
etc....complete as directed by the departmental officers at site. | 27 | each | 1,106.22 ₹29,867.94 | 1,106.22 ₹29,867.94 |
| 1.00 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 0.53 | cum | 6,311.55 ₹3,313.56 | 6,311.55 ₹3,313.56 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 0.75 | cum | 2,598.49 ₹1,948.87 | 2,598.49 ₹1,948.87 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.23 | cum | 10,608.4 ₹2,386.89 | 10,608.4 ₹2,386.89 |
Tender Value
₹2.1 L
EMD Value
₹5,282
Closing Date
2 Feb 2026, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sub Division Thiruvananthapuram
GENERAL-Urban flood 2025-Emergency cleaning of thodu near Kanakanagar Rajeev lane Kanakanagar ward Thiruvananthapuram Corporation Vattiyoorkavu LAC-General Civil Work
2026_Irrig_831828_1
IRR/IA/TR/2682/2025_5_1_1/1
Open Tender
Civil Works - Others
kanakanagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,282
Yes
24 Mar 2026
29 Jan 2026
4 Feb 2026
29 Jan 2026
2 Feb 2026
29 Jan 2026
Cleaning of thodu
OD35370/2025-2026: Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the thodu by mechanical means or manual means with all lead and lift including disposal of the removed earth, silt, clay, mud etc to places as directed by the Engineer in charge, complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu.
OD35371/2025-2026:Premonsoon cleaning - conveyance /carriage charges for rubbish/silt/plastic collected from the site to contractors own dumping area within 5 km without causing damages to environment or society.
OD35372/2025-2026:Engaging man coolies for removing the solid wastes including slaughter house waste etc....complete as directed by the departmental officers at site.
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1397885.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1397885.xls
BOQ • 0.23 MB
BID.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid