Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC 6201 M G ROAD KOLKATA 700 009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹14,552.40+₹18.60 (0.13%)Rejected-Finance VILL SONABHARUI PO TARAPUR DIST MURSHIDABAD | SONABHARUI | MURSHIDABAD | WEST BENGAL | L2 | Rejected-Finance Higher Than L1 | |
| 3 | L3₹14,564.20+₹30.40 (0.21%)Rejected-Finance | L3 | Rejected-Finance Higher Than L1 | |
| 4 | L4₹14,568.80+₹35 (0.24%)Rejected-Finance JHETA JAMBONI MOHOBONI WESTMEDINIPUR WESTBENGAL | HOOGHLY | WEST BENGAL | 712122 | L4 | Rejected-Finance Higher Than L1 | |
| 5 | L5₹14,570.34+₹36.54 (0.25%)Rejected-Finance VILL PO PANCHTHUPI MURSHIDABAD | KOLKATA | WEST BENGAL | 700023 | L5 | Rejected-Finance Higher Than L1 |
| Sl No | Description | Qty | Unit | ARIYAN ENTERPRISE L1 | FIKIR SHAIKH L3 | MIR ENTERPRISE L4 | S.R.M. ENTERPRISE L2 | KAZI RIJAUN AHAMMED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface Dressing of the ground in any kind of soil including removing vegetation equalities notexceeding 15 cm depth and disposal of therubbish within a lead upto 75 m as directed. | 1 | SQM | 10 ₹10 Lowest | 11.5 ₹11.5 | 10 ₹10 Lowest | 11 ₹11 | 10 ₹10 Lowest |
| 2.00 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and stone dust (in proportion of 60:40). | 1 | CUM | 1,710 ₹1,710 Lowest | 1,718 ₹1,718 | 1,720 ₹1,720 | 1,715 ₹1,715 | 1,720 ₹1,720 |
| 3.00 | Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (Payment to be made on length of wall) (Schedule of rate PWD Building 2017, Page No- 217,, Item-11) (b) With bamboos of length above 1.80 m. and up to 2.40 m. each | 1 | RUNNING MITRE | 796 ₹796 Lowest | 797 ₹797 | 797 ₹797 | 797 ₹797 | 797 ₹797 |
| 4.00 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
100. SOR'2018, vol-III, Sl. 18.29, p- 336. | 1 | Each | 3.5 ₹3.5 Lowest | 3.6 ₹3.6 | 3.5 ₹3.5 Lowest | 3.55 ₹3.55 | 3.5 ₹3.5 Lowest |
| 5.00 | Supplying empty Cement bags in good condition. SOR'2018, vol-III, Sl. 18.28, p- 336. (Assuming area occupied one bag is 0.40m.x0.175m.) | 1 | Each | 3.3 ₹3.3 Lowest | 3.4 ₹3.4 | 3.3 ₹3.3 Lowest | 3.35 ₹3.35 | 3.3 ₹3.3 Lowest |
| 6.00 | Filling With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth. SOR'2017,vol-I, Sl.3(iii),P-2 | 1 | CUM | 255 ₹255 Lowest | 255.7 ₹255.7 | 255 ₹255 Lowest | 255.5 ₹255.5 | 255.92 ₹255.92 |
| 7.00 | Spreading & consolidation of Stone Dust to requisite thickness( mearsured after compaction ) in layer including Spreading, Watering and Consolidation all complete. | 1 | CUM | 994 ₹994 Lowest | 998 ₹998 | 1,004 ₹1,004 | 996 ₹996 | 1,004 ₹1,004 |
| 8.00 | Supplying and laying Polythene sheet (150grm/ Sq.m) below P.C.C. | 1 | SQM | 24 ₹24 Lowest | 26 ₹26 | 24 ₹24 Lowest | 25 ₹25 | 24 ₹24 Lowest |
| 9.00 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure . The rate is inclusive of fitting, fixing and striking out after completion of work as perspecification and direction. (b) Where staging is not required. | 1 | SQM | 200 ₹200 Lowest | 204 ₹204 | 205 ₹205 | 203 ₹203 | 205 ₹205 |
| 10.00 | Providing and laying M 20 Grade concrete for plain/ reinforced concrete (1:1.5:3) work in any part of Road including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works | 1 | CUM | 5,520 ₹5,520 Lowest | 5,523 ₹5,523 | 5,522 ₹5,522 | 5,522 ₹5,522 | 5,522.31 ₹5,522.31 |
Tender Value
₹3.5 L
EMD Value
₹6,980
Closing Date
14 Jan 2026, 4:00 pmClosed
Prodhan
Vill-Po- Sahapur Ps- Bharatpur Dist- Murshidabad.
Repairing and maintenance of CC road under Sijgram GP XV Finance Commission Basic Grant untied WORK CODE 110170493
2025_ZPHD_978793_1
15/2025-26/SGP/15th CFC
Open Tender
CIVIL WORKS
Item Rate
30 days
All sansad Sigram GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹6,980
Yes
25 May 2026
23 Dec 2025
16 Jan 2026
23 Dec 2025
14 Jan 2026
23 Dec 2025
Surface Dressing of the ground in any kind of soil including removing vegetation equalities notexceeding 15 cm depth and disposal of therubbish within a lead upto 75 m as directed.
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and stone dust (in proportion of 60:40).
Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (Payment to be made on length of wall) (Schedule of rate PWD Building 2017, Page No- 217,, Item-11) (b) With bamboos of length above 1.80 m. and up to 2.40 m. each
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. 100. SOR'2018, vol-III, Sl. 18.29, p- 336.
Supplying empty Cement bags in good condition. SOR'2018, vol-III, Sl. 18.28, p- 336. (Assuming area occupied one bag is 0.40m.x0.175m.)
Filling With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth. SOR'2017,vol-I, Sl.3(iii),P-2
Spreading & consolidation of Stone Dust to requisite thickness( mearsured after compaction ) in layer including Spreading, Watering and Consolidation all complete.
Supplying and laying Polythene sheet (150grm/ Sq.m) below P.C.C.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure . The rate is inclusive of fitting, fixing and striking out after completion of work as perspecification and direction. (b) Where staging is not required.
Providing and laying M 20 Grade concrete for plain/ reinforced concrete (1:1.5:3) work in any part of Road including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and bending to correct shape, placing in proper position and binding with 16 gauge black wire.
Providing and laying M 15 Grade concrete for plain/ reinforced concrete (1:2:4) work in any part of Road including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_2385447.xls
BOQ • 0.24 MB
NIT15.pdf
Tender Documents • 1.09 MB
rateanalysis.pdf
Additional Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .