| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.5 L+₹14,061.31 (1.24%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.6 L+₹25,401.08 (2.24%)Rejected-Finance 435 A SIRAJ MONDAL ROAD JORA MONDIR KANCHRAPARA NORTH 24 PARGANAS | KANCHRAPARA | NORTH 24 PARGANAS | WEST BENGAL | L3 | Rejected-Finance L3 |
Tender Value
₹11.3 L
EMD Value
₹22,680
Closing Date
16 Mar 2026, 6:10 pmClosed
Chairman Kalyani Municipality
Office of the Chairman, Kalyani Municipality
Construction of CC Road with Brick Drain and Drain at B-9 New Colony, in ward No-10, Under Kalyani Municipality.
2026_MAD_1014830_14
WBMAD/ULB/KM/NIT-18(e) /Dev/2025-2026
Open Tender
CIVIL WORKS
Percentage
90 days
Kalyani Municipality
Please Refer Tender Document
8 documents required · 8 mandatory
₹3,085
₹22,680
1 Oct 2026
3 Mar 2026
19 Mar 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1.5 m
Ref. Page -1, Item -2 a), PWD SOR Vol-I w. e. f. 1.11.2017 | 175.66 | %Cum | 11,927 | ₹20,95,096.82 |
| 2 | Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 | 734.5 | Sqm | 24 | ₹17,628 |
| 3 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion
Ref. Page -23, Item -1a), PWD SOR Vol-I w. e. f. 1.11.2017 and P-9 of 96, Item -26, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 55.09 | Cum | 4,630.25 | ₹2,55,080.47 |
| 4 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
Ref.Page -15, Item -8 a), PWD SOR Vol-I w. e. f. 1.11.2017 and P-2 of 96, Item -4, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 32.5 | Cum | 5,368.05 | ₹1,74,461.63 |
| 5 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Ref. Page -16, Item -16, PWD SOR Vol-I w. e. f. 1.11.2017 and P-3 of 96, Item -8, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 130 | Sqm | 728.53 | ₹94,708.9 |
| 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor).
(i) With 1:6 cement mortar (c) 15 mm thick plaster
Ref. Page -189, Item -1, PWD SOR Vol-I w. e. f. 1.11.2017 and P-49-50 of 96, Item -1, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 409.5 | Sqm | 148.55 | ₹60,831.23 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.
Ref. Page -41, Item -33 PWD SOR Vol-I w. e. f. 1.11.2017 and P-20 of 96, Item -49, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 1.95 | Cum | 5,269.23 | ₹10,275 |
| 8 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
NOTE : Cement 0.152 cu.m. per 100 sq.m.
Ref. Page -192, Item -15, PWD SOR Vol-I w. e. f. 1.11.2017
(0.125+0.375+0.3+0.375+0.125) | 409.5 | Sqm | 32.75 | ₹13,411.13 |
| 9 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.
(a) Pakur Variety
Ref. Page -24, Item -4 a), PWD SOR Vol-I w. e. f. 1.11.2017 3rd CORRIGENDA & ADDENDA wef 04.06.2018 | 51.78 | Cum | 5,221.57 | ₹2,70,346.79 |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
III. Other then SAIL/TATA /RINL
Bsaed on Analysis Rate
Ref. Page -43-44, Item -40 II), PWD SOR Vol-I w. e. f. 1.11.2017 8th Addenda & Corrigenda w. e. f. 18.04.2018) | 0.57 | M.T. | 53,162.07 | ₹30,355.54 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 4.14 MB
BOQ_2500198.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .