Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹10,183
Closing Date
29 Sept 2026, 5:00 pm6d left
Executive Officer NAC Nuapada
NAC Nuapada
Completion of Weekly Market near NAC Office, W. No-6, NAC Nuapada
2026_ORULB_140730_2
NPD/EO/05/2026-27
Open Tender
Civil Works - Buildings
Percentage
NAC Nuapada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Executive Officer, NAC Nuapada
₹10,183
Yes
10 Sept 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
29 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil in excavation of foundation trenches including cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge. | 80.14 | Cum | 282.9 | ₹22,671.61 |
| 2 | Supplying & Filling in foundation and plinth with good quality river sand well watered & rammed etc. including cost. Conveyanace, royalties etc. complete as per direction of the Engineer-in-charge. | 96.29 | Cum | 712.4 | ₹68,597 |
| 3 | Cement concrete (1:3:6) with 40mm size c.b.h.g. metal including cost, conveyances, royalties, taxes of materials, cost of labour, T&P etc. complete. | 26.96 | Cum | 5,837.2 | ₹1,57,370.91 |
| 4 | Fly Ash Brick masonry in cement mortar (1:6) in Foundation & Plinth using brick of size 23cmx11cmx8cm having compressive strength not less than 75kg/mm2 including cost, conveyances, royalties, taxes of all materials, labour, T&P etc. complete. | 4.61 | Cum | 5,665.6 | ₹26,118.42 |
| 5 | RCC of M-20 grade of concrete using 20mm & downgraded c.b.h.g. chips including mixing, laying upto required level & compacting, watering, curing including cost, conveyances, royalties, taxes of all materials, labour, T&P with centering & shuttering (excluding cost of reinforcement) etc. complete. | 42.25 | Cum | 5,867.8 | ₹2,47,914.55 |
| 6 | Providing Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentalling them after casting . | 143.72 | Sqm | 249.8 | ₹35,901.26 |
| 6.1 | Providing Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentalling them after casting . | 60.75 | Sqm | 1,219.7 | ₹74,096.78 |
| 7 | Cutting, straightening, bending & binding M.S./ T.S. rods & tying grill for R.C.C. work including placing the same in position with cost, conveyances, taxes, royalties of reinforcement & binding wire, cost of labour, T&P etc. complete. | 40.22 | Qntl | 9,553.2 | ₹3,84,229.7 |
| 8 | Towards Display Board & Photo Ghraps | 1 | NOS | 1,300 | ₹1,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
DTCN.pdf
Tender Documents • 0.30 MB
BOQ_609122.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .