Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹20.3 Laccepted-aoc | ₹20.3 L | accepted-aoc |
Tender Value
₹21.3 L
EMD Value
₹53,300
Closing Date
4 Mar 2026, 3:00 pmClosed
Chief Engineer, TTD, Tirupati
O/o Divisional Engineer(Elec)-I Room No.126, Ground floor, T.T.D.Administrative Buildings, K.T.road, Tirupati, Chittoor(Dist), A.P, India
Hire charges for providing Electrical illumination, Flood lighting & DG Sets to parking areas, (i.e., outside of Kalyanavedika compound wall) & roads from Saibaba temple through villages up to Kalagangamma circle in connection with the Kalyanostavam-2026 of Sri Kodandarama Swamy at Vontimitta in YSR Kadapa (Dist
901630
306/DE(Elec.)-I/TTD/TPT/2025-26
OPEN - NCB
Electrical Works
TIRUPATHI
6 documents required · 6 mandatory
₹754
₹53,300
19 Mar 2026
16 Feb 2026
16 Feb 2026
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Single pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, laying, connecting PVC / XLPE insulated armoured / unarmoured UG cable with necessary cable glands sockets etc., as required wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
Note : 1) Errection and Testing should be completed before one day of the Festival / Utsavam etc. begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
3 1/2 core 50 sq.mm U.G Cable for 2 days
3 1/2 core 95 sq.mm U.G Cable for 2 days
3 1/2 core 185 sq.mm U.G Cable for 2 days
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT change over board as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
250/400 Amps 4 pole change over switch for 2 days
Note: 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc. begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, wiring and maintaining suitable size of Joint box as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
Cable joint box for Two days
Note : 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc. begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For Ten days
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc. begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For Two days
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc. begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Transportation charges for DG set of 62.5 KVA to 125 KVA to the site including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For Two days.
Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Supply, Transportation of Diesel Oil for DG set
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Two days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for MS Pipes scaffolding - using MS Pipes of 40 mm dia mtr and special type clamps ("Nandu" clamps) and after completing of work/festival the scaffolding should be removed carefully. The rate is inclusive of hire charges, conveyance charges of all materials and lobour charges for fixing and removing after completing of the work/ festival etc.,complete the scaffolding measurements shall be take as "length X average height" (one side of the scaffolding only) upto 15 mtrs height.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ 306.xlsx
TENDER_DOCUMENT • 0.02 MB
306 NIT.doc
TENDER_DOCUMENT • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].