| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.2 LAccepted-Finance | L-1 | Accepted-Finance being a lowest | |
| 2 | L-2₹25.0 L+₹3.8 L (17.8%)Rejected-Finance VILL JIA PO BHUNTAR DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | L-2 | Rejected-Finance being a highest | |
| 3 | L-3₹26.5 L+₹5.3 L (25.2%)Rejected-Finance | L-3 | Rejected-Finance being a highest | |
| 4 | L-4₹27.4 L+₹6.3 L (29.5%)Rejected-Finance S O SH BHAWANI SINGH VPO BHRAIN TEHSIL BHUNTAR DISTT KULLU HP PIN 175125 | KULLU | HIMACHAL PRADESH | 175125 | L-4 | Rejected-Finance being a highest | |
| 5 | L-5₹28.5 L+₹7.3 L (34.4%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | L-5 | Rejected-Finance being a highest |
Tender Value
₹30.3 L
EMD Value
₹52,910
Closing Date
5 Aug 2022, 9:30 amClosed
DFO Kullu
DFO Kullu
Const of Water Pond at Kothi beat Manali Forest Range
2022_FD_62766_1
2/2022-23
Open Tender
Civil Works
Item Rate
120 days
Kothi
Please refer Tender Documents
8 documents required · 8 mandatory
₹1,500
Yes
Payable To DFO Kullu
₹52,910
Yes
Kullu
5 Aug 2022
15 Jul 2022
5 Aug 2022
15 Jul 2022
5 Aug 2022
15 Jul 2022
3 Aug 2022
Amount
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depath, breading clods, watering , rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and topmost layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift 1.5 Mtr: All kind of soil.
Excavation work by mechanical means (Hydraulic excavator) / Manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out the excavated soil and disposal of suplus excavated soils as directed, withing a lead of 50m: Hard rock(requiering blasting)
Providing and Laying in position cement Conrate of specified grade excluding the cost of centrering and shuttering -All work up to plinth level: (PCC M 10, 1:3:6)
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete
Carriage of materials :- Soling Stone (0.5km lead)
Stone Works:- (A) Randome rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:2 sand :12 graded stone aggregate 20 mm nominal size) up to plingth level with cement mortar 1:6 (1 cement: 6 sand)
(B) Randome rubble masonry with hard stone in superstructure above plinth level and up to floor five level including levelling up with cement concrete 1:6:12 (1 cement:2 sand :12 graded stone aggregate 20 mm nominal size) up to plingth level with cement mortar 1:6 (1 cement: 6 sand)
Stone for masonry work
ishan rana
DEVI CHAND THAKUR
RANDHIR JAMWAL
Narender singh pal
rumal singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .