Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
20 Mar 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Arbeena Bilal Pala
Srinagar Depot, Bharat Petroleum Corporation Limited
ok
20242
1000432229
Limited Tender
Lump-Sum
Srinagar Depot
20 Mar 2025
6 Mar 2025
21 Mar 2025
6 Mar 2025
20 Mar 2025
7 Mar 2025
6 Mar 2025 - 7 Mar 2025
NOTICE INVITING TENDER
REQUEST FORR QUOTATION CRFQ -
REQUEST FORR QUOTATION CRFQ -
BHARAT PETROLEUM CORPORATION LIMITED,
LOCATION INCHARGE
Sempora Balhama Srinagar
PROVIDING SECURITY SERVICES
AT BPCL SRINAGAR DEPOT
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
NOTICE INVITING TENDER – PROVIDING SECURITY SERVICES AT BPCL
ISSUED BY: - LOCATION INCHARGE
BHARAT PETROLEUM CORPORATION LIMITED
SEMPORA ZAFFRON COLONY SRINAGAR
TABLE OF CONTENTS
1) Annexure I- Scope of Work
2) Annexure II – GENERAL CONDITIONS OF CONTRACT (GCC)
3) Annexure III- Integrity Pact
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
BPCL is having its Petroleum Oil Depot at Sempora Srinagar and company is naturally
concerned about the said property and wants to ensure its safety and security thereof.
1. The security agency is to be engaged in the business of safeguarding property
(both movable and immovable) round the clock as mentioned above for a period of
1.1. All property ( both movable & immovable ) situated at above places will be
secured round the clock and the schedule for security personnel for guarding the site
would be as below :-
Sr. No. Name of The Security Security Security
Location Guard Gunmen Supervisor
1 Srinagar POL Depot 13 0
1.2. The actual deployment of number of Supervisor/Guard/Gunman in the shifts
will be decided by the Concerned officer and Company will make payment for the
above numbers of Security personnel.
1.3. All security Guards Armed/Unarmed/Supervisor should be Ex-servicemen and
proof for this should be given to us before deployment.
2. WORKING HOURS:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Except in case of different strength of guards required in different shifts, which would
be separately advised in writing, services are required on round the clock basis on
hours a day duty Rota, including all Sundays and holidays. Relievers will have to be
arranged by it against leave, absence etc. Extra working hours of Supervisors/Guards
would be avoided. Any overtime duty, prior permission to be taken from concerned
officer. OT will be permitted in case of extreme emergency only.
3. THE FIRM SHALL GIVE AN UNDERTAKING THAT FOR THE PURPOSE OF CARRYING OUT
IT’S OBLIGATIONS:
3.1. It shall not allow any unauthorized person inside the premises.
3.2. The Agency will provide full security and safety of the valuable property of the
Company such as Motor Sprit, High Speed Diesel, Lubricants, Pump machinery,
Generator sets, Air Compressor etc and also of the vehicles of the customers parked
within the said premises. The firm will provide additional security guards, Gunmen
and/or Supervisors to the company as & when so required by the company. The
payment in respect of such additional staff shall be made on the same basis as
mentioned in the agreement.
3.3. The firm will ensure that the security guards/Gunmen/Supervisors deployed
shall have suitable qualifications, sufficient experience & good personality.
3.4. On the advice of the concern officer to remove any of it's {viz. Firm's}
employee from company's premises mentioned above.
3.5. It will also be required to make payment of EPF to its staff as per EPF Act
Payment of bonus as per bonus Act and it will maintain all records in accordance with
Contract Labor Act, Factory act as applicable & indemnify against the legislations
which the corporation may be called upon to make under the provisions of these Acts.
3.6. It will be responsible for making payment of salaries & other payments to its
3.7. The firm shall maintain regularly, punctually & faithfully the attendance
register of the employees deployed by it in the Company's premises showing therein
the persons attending their duties and the FIRM shall produce the register as & when
so required by the company.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
3.8. The firm will also ensure that the staff while deployed in the Company's
premises shall wear uniform approved by the company. In addition, the staff deployed
would also carry lathi/or Gun etc as specified. The Firm shall also ensure that the
uniforms are neat & clean. The company shall not be liable to pay for these uniforms.
3.9. In case of non-compliance of any contractual obligation (s) and / or in case of
any damages, breakages (other than normal wear and tear) or loss of property or theft
in the said premises or fittings or assets and equipments and / or burglary in the office
/ common facilities which is attributable to the security agency representatives/
employee or due to their negligence, the security agency shall indemnify the BPCL
after joint enquiry for any loss or damage that may be caused to the company on
account of negligence of the personnel posted at the said premises. Under such
circumstances, the security agency shall be responsible for repairing/ replacing the
same and making good the loss at their cost failing which, the actual cost
incurred towards repair/replacement shall be imposed on the security agency
3.10. The security agency will ensure that he or his partners (if is a partnership firm)
or his employees, representatives, agents shall not smoke or carry matchboxes,
mechanical lighters etc. inside the BPCL premises and would ensure that their
employees do not smoke and do not use tobacco in the site or within the safety
distance limits.
3.11. Proper and thorough frisking of all people entering in the BPCL premises
should be ensured by security agency. And agency shall be responsible for not to carry
any match box, metallic things, mobiles, tape recorders, weapons, any other
electronic/ electrical gadget inside BPCL premises from any visitors, guests,
contactors, contactor workmen, tank lorry drivers, cleaners etc.
3.12. The agency will ensure to safeguard the said premises its property (both
moveable and immoveable) situated at all locations.
3.13. It shall maintain liaison with the local police authorities & with the permission
of the Plant In-charge to report any untoward incident to the local police & to pursue
such complaint with the Police authorities.
3.14. To carry out complete vigilance of the premises and to attempt to thwart any
attempt of forcible intrusion into the Location premises.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
3.15. It shall maintain a record of men, material, vehicles etc. coming in and/or going
out of the Plant and observe the rules and regulations framed by the Location In-
charge in respect of entry/exit to the location.
3.16. It shall check the In/Out going material & ensure that the same is taken In/Out
only with the required gate-pass & to complete In/Out register at Main Gate as per
Plant requirement.
3.17. It shall check, frisk, control & search the staff of the company as well as of the
contractors/visitors at the time of their entry & departure from the Plant.
3.18. It shall keep Vigilance inside & outside the boundary of the Plant.
3.19. It shall ensure the safety & security of Property of the corporation.
3.20. To maintain record of the gate passes issued to visitor/contractor & their staff
coming in/ out of gate during the shift hours & showing it on daily basis to the
assigned Officer.
3.21. In case, any of the supervisors/guards/armed guards is found indulging in any
act of misconduct in the opinion of Plant In-charge, he should be dismissed from the
services and in extreme conditions, the individual will be dismissed from the firm as
well and in such case, the firm will submit the proof of dismissal of that individual to
3.22. It shall ensure practice of all safety measures evolved from time to time as per
the corporation's Policy.
3.23. It shall introduce & implement anti-theft gadgets and to check pilferage.
3.24. It shall maintain a log book where detailed events/ observations of the
guards/supervisors will be recorded and submit the same to the Plant In-charge.
3.25. It shall attend the telephone calls while the office is closed and convey all
messages to the concerned officials.
3.26. It shall carry out the instructions of the assigned officers without any dilution.
3.27. The firm shall, also ensure that the staff deployed at the company's premises
will be fully trained in firefighting equipments as and when so required. The firm shall
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
maintain a register of the training in firefighting imparted by it to its staff from time to
time. BPCL may also ask registers/log books related to firefighting system.
3.28. It shall lock & open all office rooms, switch off lights and air conditioners,
heaters room, coolers & close the water taps etc. & all other electrical gadgets after
office timings.
3.29. It shall carry out any other task necessary in the interest of security of the
3.30. It shall keep all the stores closed & arrange issue of materials against
authorized issue form only. Incoming material also to be counted & records to be
maintained as per the requirement.
3.31. Security agency shall be fully responsible for the verification of the reliability of
each individual deployed by it in the Company's premises. Police verification is
mandatory for all employees deployed by security agency. Proof of police verification
shall be submitted at location.
3.32. Security agency shall also be responsible for the good conduct of the personnel
deployed by it in the Company's premises and they shall not consume alcohol and
Smoke while in the Company's premises (as well as on duty) and shall not come to the
Company's premises after consuming alcohol (also any other kind of banned drugs). In
such cases, the individual should be dismissed from the services and in extreme cases
from the firm as well, the firm will submit the proof of dismissal of that individual to
3.33. The Agency shall also be under obligation to deduct, contribute and deposit
towards EPF and ESI contributions for all the contract labor (s) engaged by it. The
Agency shall submit proof of such deposition in the form of attested copies of Form 6A
(EPF-Annual return) by 30th April of the year and Form 6 (ESI - six-monthly returns) by
31st May and 30th November. The bill towards service charges for services rendered
during a month should be submitted along with proof of submission of challan
towards EPF and ESI contributions for the previous month. Any short payment noticed
during the course of the contract shall be made good by the Agency, and the
Corporation reserves its right to deduct any such amount equivalent to such short
payment from the security deposit, in case of failure on part of the Agency to make
good the default. Security agency to comply with all statutory Rules, Regulations
including Employees State Insurance Act, Employees provident Fund (And
Miscellaneous Provisions ) Act, Minimum wages Act, Contract Labor ( Regulation &
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Abolition ) act 1970, Payment of Bonus Act etc. as applicable and shall pay wages as
prescribed by DGR to the employees deployed by you in the BPCL premises.
3.34. To indemnify the corporation against consequences arising out of it's
workmen's default or negligence or violations of the rules applicable to the place of
work. It shall observe & comply with the requirement of the minimum wages act, EPF
Act, the ESI act and all other industrial/labor Legislations being in force or may later be
brought into force governing the relationship between the employer & the employee
& keep the corporation indemnified against all claims, payments, losses that
corporation may have to make or suffer on account thereof. It will also accept liability
for payment of compensation in accordance with the provisions of the workmen's
compensation Act 1926 read with ESI Act 1946 or amendments thereafter & keep the
corporation indemnified from & against all payments by way of compensation or
otherwise which the corporation may be called upon to make under the provisions of
the said act to ant such workmen as aforesaid and any expenses incurred by the
corporation in connection with any claim preferred by it's workmen and/or against all
actions, claims & demand whatsoever in respect thereof or in respect of any loss,
injury or damages whatsoever to any third person caused by it's workmen.
3.35. Ensure to rotate the security staff regularly.
3.36. In case any of Supervisors/Security Guards are found violating the instructions
of Location in-charge or their services found unsatisfactory, they would be discharged
then and there from the Location. Such man should not be redeployed at any of our
3.37. Any deviation from the instructions issued by the Concern officer or in case of
any deviation observed from the contract terms & conditions, the contract shall be
terminated with immediate effect and without any notice.
3.38. If at any time during the period of contract, it is observed by the Company, or
its authorized representatives that the services rendered by the Firm are not to the
satisfaction of the Company or any terms of the agreement are violated, the company
with its sole discretion has right to terminate the contract without any notice to the
3.39. All payments will be made through NEFT only after verification of the bill and
no payment will be made through any cheque or demand draft.
3.40. That the Firm shall submit bill every month and each bill shall be submitted on
or before 7th day of the succeeding month and the company shall make payment
thereof within a period of two weeks on receipt of such bill.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
3.41. It shall maintain a key register and ensure that the keys of the facilities in
common area and such other gates or lockable spaces provided under their
supervision and control, are stored in safe custody by its personnel. It shall also ensure
that details about the movement of such keys are properly recorded in the key
3.42. The Firm shall strictly comply with all the guidelines of Directorate of
Employment, Directorate General Resettlement, Ministry of Defence for sponsoring
and operating of security agencies and related activities.
3.43. The Firm shall deploy adequate number of personnel to discharge its obligation
under this agreement and would have to arrange for relievers against leave absence,
extra /extended working hours. However extra /extended working hours shall be done
only in cases of extreme exigency, with prior intimation, keeping in mind the
sensitivity of the said premises.
3.44. The strength of personnel can be increased/ decreased subsequently, if the
Firm so desires, with prior approval of the Company through its authorized
representative. The payment in respect of such increase / decrease in personnel shall
be made as applicable.
3.45. The Firm shall be responsible for the good conduct of its personnel deployed
by it in the said premises and shall rotate the postings of its personnel regularly. It
would be the responsibility of the Firm to check the character and antecedents of its
personnel and ensure that its representatives are having experience in such
surveillance activities and for the same it would engage and deploy only Ex-
servicemen personnel.
3.46. The Firm shall indemnify the Company against the consequences arising out of
its personnel's default or negligence or violations of the rules applicable to the place
3.47. The Firm shall observe and comply with the requirements of the Minimum
Wages Act, the ESI Act, the EPF & MP Act,
3.48. Workmen Compensation Act and all other Industrial / Labor Legislations (for
the time being in force and as amended from time to time) governing the relationship
between the Firm and its employees and keep the Company indemnified against all
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
claims, payments, losses, damages or levies etc. that the Company may have to suffer
on account therefore.
3.49. That the Firm shall also accept and indemnify the Company against any liability
for payment of compensation arising under the Workmen's Compensation Act or
otherwise which the Company may be called upon to make good under the provisions
of the said Act or any other Act for the time being in force, to any such personnel of
the firm on account of death or any injury sustained or claim arising from permanent
disablement of the personnel during the course of employment and also indemnify
the Company for any expenses incurred by the Company in connection with any claim
preferred by its personnel and/or against all actions, claims and demand whatsoever
in respect thereof or in respect of any loss, injury or damages whatsoever to any third
person caused by its personnel.
3.50. The Firm shall also be required to comply with the provisions of Contract Labor
(R&A) Act, 1970 for the time being in force and as amended from time to time and it
shall maintain all records in accordance with the said Act, as applicable and indemnify
the Company against any claim or fine or levy or interest etc that it may be called
upon to sustain/ pay under the provisions of the said Act. As and when necessary, the
Firm shall obtain necessary licenses /permits as required under the Contract Labor
(Regulation & Abolition Act, 1970) or such other laws as applicable and produce the
same to the authorized representative of the Company as and when called upon for.
3.51. The Firm shall be responsible for making payment of salaries and such other
payments to its personnel as per the rates applicable and as per guideline of the DGR.
The Firm shall maintain an attendance register of its personnel deployed at the said
premises under its control and supervision and produce the register and such other
records/ registers / documents as and when required/ called for by the Company or its
authorized Officials.
3.52. The strategic points where surveillance personnel are to be deployed would be
discussed and decided by the Firm in consultation with the Company through its
authorized representative and the Firm shall ensure that the required personnel are
strictly deployed at those strategic points. If the need arises, these strategic points
may be changed by the Firm, with prior approval of the Company through its
authorized representative.
3.53. In case of any loss/ theft/ burglary of the property of the Company in the said
premises, the Firm and the Company would have a joint enquiry consisting of
representatives of the Firm and of the Company. The Firm shall have to depute its
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
special investigator at its own cost to conduct preliminary enquiry to fix / apportion
blame and responsibility to make good the loss.
3.54. In case of any FIR with the police as and when the need arises and the Firm
shall provide all necessary cooperation, documents, materials required and help, for
lodging the FIR.
3.55. In case of noncompliance of any contractual obligation(s) and/or in case of any
damages, breakage or loss of property or theft, vehicles parked in the said premises or
fittings, assets and equipment and /or burglary in the offices/common facilities which
is attributable to the personnel deployed by the Firm or due to their negligence, the
Firm shall indemnify the Company after joint enquiry for any loss or damage that may
be caused to the Company on account of negligence of the personnel posted at the
said premises. Under such circumstances, the Firm shall be responsible for repairing/
replacing the same and making good the loss at their cost failing which the actual cost
incurred towards repair/ replacement shall be imposed on the Firm by the Company.
3.56. That the Firm would under no circumstances sub-let or sub-contract its
obligations responsibilities under the present agreement to any other body or person
for rendering the Surveillance and caretaking services at the said premises.
3.57. The contract shall be valid for a period of two years w.e.f. 01.05.2025 (00:00
Hrs) to 30.04.2027 (23:59 Hrs.). All payments will be made on monthly basis by means
of NEFT on production of Bill along with attendance sheets and such other records
returns or documents called for which should be duly verified by the authorized
representative of the Company. The bill shall not be honored for payment without the
verification of the concerned authorized representative of the Company.
3.58. BPCL reserve the right to terminate the contract any time before expiry of the
period of contract by giving the security agency one month advance notice in writing
without assigning any reason whatsoever.
3.59. Due to any policy decisions or otherwise, BPCL on its sole discretion can
terminate the contract without assigning any reason.
3.60. The BPCL at its sole discretion may reject the quotations without assigning any
3.61. All legal disputes arising out of this contract shall be settled as per arbitration
of company policy.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
4. OTHER COMMITMENTS OF THE FIRM:
4.1. We shall not be liable to pay any damage or compensation for any death
or injury caused to the person (s) engaged by you for the above job either under the
Workmen’s compensation Act or Act in force at that time and you agree to
indemnify us against all such claims.
4.2. Security agency would be liable to pay the required minimum wages, ESI under
the Contract Labor Act/ Minimum Wages Act and as applicable service tax. The entire
statutory requirement as per Minimum Wages Act, EPF Act, Labor Laws and other
applicable acts from time to time are to be adhered by you. The contractor
shall submit a copy of the appointment letter (issued to the employees deployed by
him at the Company’s premises) and maintain regularly, punctually and
faithfully an attendance register of the employees deployed by it in
the Company's premises showing therein the person's attending their duties and other
registers and records as required under different laws. The security agency shall
produce the registers as and when required by the company.
4.3. The security agency shall observe and comply with the requirements of
the Contract Labor (R&A) Act, Minimum Wages Act, the ESI Act, the EPF & MP Act,
Workmen compensation Act and all other Industrial /
Labor Legislation (for the time being in force and as amended from time to
time) governing the relationship between the Contractor and its employees and keep
the BPCL indemnified against all claims, payments, losses, damages or levies etc. that
the BPCL may have to suffer on account thereof.
5. NO OF PERSONS TO BE EMPLOYED:
Total no. of persons to be employed will be as per the minimum requirement of the
company & will be in mutual agreement with the firm. The tentative number for
regular placement will be as below:
Sr. No. Name of The Security Security Security
Location Guard Gunmen Supervisor
1 Srinagar POL Depot 13 0
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
6. In the case of additional requirement due to the unforeseen situations, Company may
advise the Firm in advance.
7. CONTRACT VALIDITY: Unless otherwise specified contract will be valid for a period of
two years w.e.f 01.05.2025 to 30.04.2027
8. Final quoted prices as recorded in the statement are subject to change due to
arithmetical/totaling and calculation errors and loading if any, after completion of
detailed evaluation statement.
9. Firm has to submit affidavit mentioning all the governing terms and conditions
10. Following document is to be enclosed along with the tender documents failing which
your offer will be disqualified.
a) DGR registration Certificate.
b) Details of P F Number & its certificate
c) ESI no. & Details
d) Income tax Clearance certificate
e) Details of GST
f) Experience and Name of the Establishment where party is engaged for the security
services alone with the detailed address & Tel nos.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
GENERAL CONDITIONS OF CONTRACT (GCC)
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
BHARAT PETROLEUM CORPORATION LIMITED
SECTION DETAILS
I DEFINITION OF TERMS
II GENERAL INFORMATION ABOUT SITE
III GENERAL INSTRUCTION FOR THE TENDERER
IV INTERPRETATION OF CONTRACT DOCUMENTS
V PERFORMANCE OF WORK
VI BILLS / MEASUREMENT / PAYMENT
VII TAXES AND DUTIES
VIII LABOUR LAWS AND OTHER REGULATIONS
IX VARIOUS PROFORMA
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS
In the contract documents as herein defined where the context so admits, the following
words and expressions will have following meanings:
1) “The Owner/Company/BPCL” means the Bharat Petroleum Corporation Limited,
incorporated in India having its registered office at 4 & 6, Currimbhoy Road, Ballard Estate,
Mumbai - 400 038 or their successors or assigns
2) “The Contractor” means the person or the persons, firm or Company whose tender
has been accepted by the Owner and includes the Contractor’s legal representative, his
successor and permitted assigns.
3) The “Managing Director” shall mean the Chairman and Managing Director of the
Bharat Petroleum Corporation Limited or his successor in office designated by the Owner.
4) The “Engineer-in-Charge” shall mean the person designated as such by the Owner
and shall Include those who are expressly authorized by the Owner to act for and on his
behalf for operation of this contract.
5) The “Work” shall mean the works to be executed in accordance with the contract or
part thereof as the case may be and shall include extra, additional, altered or substituted
works as required for purpose of the contract.
6) The “Permanent Work” means and includes works which will be incorporated in and
form a part of the work to be handed over to the Owner by the Contractor on completion of
7) The “Construction Equipment” means all appliances, Tools/Tackles and equipment
of whatsoever nature for the use in or for the execution, completion, operation or
maintenance of the work unless intended to form part of the Permanent work.
8) The “Site” means the areas on which the permanent works are to be executed or
carried out and any other places provided by the Owner for purpose of the contract.
9) The “Contract Document” means collectively the Tender Document. Designs.
Drawings or Specifications, agreed variations, if any, and such other document constituting
the tender and acceptance thereof.
10) The “Consultant” means the consulting engineers Nominated/appointed by the
Owner for this Project / job.
11) The “Sub-Contractor” means any person or firm or Company (other than the
Contractor) to whom any part of the work has been entrusted by the Contractor, with the
written consent of the Engineer-in-Charge, and the legal personal representatives,
successors and permitted assigns of such person, firm or company.
12) The “Contract” shall mean the Agreement between the Owner and the Contractor
for the execution of the works including therein all contract documents.
13) The “Specification” shall mean the various technical specifications attached and
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
referred to in the tender documents. It shall also include the latest editions, including all
addenda/corrigenda, of relevant Indian Standard Specification, specifications of the other
country published before entering into Contract.
14) The “Drawings” shall include maps, plans and tracings or prints thereof with any
modifications approved in writing by the Engineer-in-Charge and such other drawings as
may, from time to time, furnished or approved in writing by the Engineer-in-Charge.
15) The “Tender” means the tender submitted by the Contractor for acceptance by the
16) The “Alteration Order” means an order given in writing by the Engineer-in-Charge to
effect additions to or deletion from and alterations in the works.
17) The “Completion Certificate” shall mean the certificate to be issued by the Engineer-
in-Charge to the contractor when the works have been completed to his satisfaction.
18) The “Final Certificate” in relation to a work means the certificate issued by the
Engineer-in-Charge after the period of liability is over for releasing the retention
19) The “Period of Liability” in relation to a work means the specified period during
which the Contractor stands responsible for rectifying all defects that may appear in the
GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY:
The site location is described in the Special Conditions of Contract. The intending tenderer
should inspect the site and make himself familiar with site conditions and available facilities.
Entry into the BPCL areas is restricted depending on location/site. Only pass holders as also
vehicles with special permits are permitted in such restricted areas. Inside the premises
access to various work spots is also further regulated by permits issued for each area. Non-
availability of access roads or permits for entry of vehicles/equipment to any specific area
shall in no case be the cause to condone any delay in execution of works or be the cause for
any claims or extra compensations.
2.2 SCOPE OF WORK:
The scope of work is defined in the Special Conditions of Contract and specifications. The
Contractor shall provide all necessary materials, equipments / Tools and Tackles /
Supervision / labour etc. for the execution and maintenance of the work till completion
unless otherwise mentioned in these tender documents. All materials that go with the work
shall be approved by Engineer-in-Charge prior to procurement and use.
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND WORKSHOP:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
The tenderer should visit the site and acquaint himself with site conditions, availability of
water, electricity, approach roads, construction materials as per specifications, shelter for
his staff, etc. since these are to be provided/arranged by the tenderer (unless otherwise
specified) at his cost. The owner will, at his discretion and convenience based on availability
for the duration of the execution of the work, make available, land for construction of
contractor’s field office, go-downs, workshop and fabrication yard required for the
execution of the contract. The contractor shall at his own cost construct all these temporary
buildings and provide suitable water supply and sanitary arrangement approved by the
Engineer-in-Charge.
On completion of the works undertaken by the Contractor, he shall remove all temporary
works/ shed erected by him and have the site cleaned as directed by Engineer-in-Charge if
the contractor shall fail to comply with these requirements, the Engineer-in-charge may at
the expenses of the Contractor remove such surplus and rubbish material, dispose off the
same as he deems fit and get the site cleared as aforesaid; and the contractor shall
forthwith pay the amount of all expenses so incurred and shall have no claim in respect of
any such surplus materials disposed off as aforesaid. But the Owner reserves the right to ask
the Contractor any time during the pendency of the contract to vacate the land by giving
seven days notice on security reasons or on material interest otherwise.
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS:
All temporary buildings, sheds, workshops, field stations etc. shall be constructed in
conformation with the safety and security regulations of the owner as regards location and
type of structure.
GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER:
3.1 The quotation should be submitted only in the manner and the form prescribed in
the Request for Quotation (RFQ)/Tender enquiry.
3.2 Addenda/Corrigenda to this tender document if issued must be signed and
submitted along with the tender document. The tenderer should consider the
Addenda/Corrigenda and should price the work based on revised quantities when
amendments for quantities are issued in addenda.
3.3 Instructions for two-part bidding (If Applicable)
i) The bid should be submitted in two parts viz.
a. Techno-commercial bid.
ii) Techno-commercial bid shall have the following information/details
a. Technical deviation if any.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
b. Commercial deviation if any like extra taxes, duties etc.
c. Copy of price bid with prices blanked off.
d. Any other relevant information.
iii) Price Bid shall have only prices as per schedule of Rates.
iv) Techno-commercial bid and price bid shall be enclosed in two separate envelopes
with the subject job, type of bid, bidders name super-scribed on top. Both these envelopes
shall be sealed in a common envelope and submitted as specified above and in covering
letter. (This will not be applicable in the case of e-tenders)
4.1 The tenders, as submitted shall include all documents/details asked for by BPCL in
the RFQ/Tender enquiry.
4.2 All pages to be initialed:
Wherever signed tender documents are submitted, all signatures in the documents shall be
dated, as well as all the pages of the documents shall be initialed at the lower right-hand
corner and signed wherever required in the tender papers by the tenderer or by a person
holding power of attorney authorizing him to sign on behalf of the tenderer before
submission of tender. Tenders without signatures as stated above are liable to be rejected.
4.3 Rates to be in Figures and Words:
The tenderer should quote the rates in English both in figures as well as in words. Offers
received without the rates in figures and in words are liable for rejection. In case of
discrepancy exists between the rate quoted in figures and in words, the rates quoted in
words will prevail.
4.4 Corrections and Erasures:
All corrections and alteration in the entries of tender papers will be signed in full by the
tenderer with date. No erasures or over-writings are permissible.
In case of priced bids containing overwriting/cuttings/erasures in the quoted rates and in
case these are not attested by the signatory of the bid, such priced bids are liable to be
rejected without giving any further notice.
4.5 Signature of Tenderer:
The tender shall contain the name, residence and place of business of person or persons
making the tender and shall be signed by the tenderer with his usual signature with
company stamp. Partnership firms shall furnish the full names of all partners in the tender.
It should be signed in the partnership name by all the partners or by duly authorized
representative followed by the name and designation of the person signing with company
Tender by Company or Corporation registered under the relevant companies act, shall be
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
signed by the authorized representative and a power of attorney in that behalf shall
accompany the tender.
4.6 Transfer of tender documents issued to one intending tenderer to another is not
5 PURCHASE PREFERENCE:
Owner reserves its right to allow Public Sector Enterprises (Central/State), purchase
preference as admissible/applicable from time to time under the existing Govt. policy.
Purchase preference to a PSE shall be decided based on the price quoted by PSE as
compared to L1 Vendor at the time of evaluation of the price bid.
Owner reserves its right to allow Micro and Small Enterprises (MSEs) and MSEs owned by
Scheduled Caste (SC) or the Scheduled tribe (ST) entrepreneurs, purchase preference as
admissible/applicable from time to time under the existing Govt. policy. Purchase
preference to a MSE and a MSE owned by SC/ST entrepreneurs shall be decided based on
the price quoted by the said MSEs as compared to L1 Vendor at the time of evaluation of
6 (a) EARNEST MONEY:
The tenderer must submit/ deposit earnest money, if specified in the RFQ/Tender enquiry,
failing which the tender is liable to be rejected. The earnest money can be deposited in the
form of Demand Draft or Bank Guarantee in favor of Bharat Petroleum Corporation Limited.
Earnest Money deposit (EMD) is not applicable for registered contractors of BPCL.
NOTE: The Bank Guarantee so furnished by the tenderer shall be in the proforma prescribed
by the owner. No interest shall be paid by the Owner on the earnest money deposit by the
tenderer. The earnest money of the unsuccessful tenderer will be refunded.
(b) SECURITY DEPOSIT:
Unless otherwise specified in the special conditions of contract, in the case of contractors
not registered with BPCL, the earnest money deposit (EMD), of the contractor whose tender
may be accepted, will be converted to security deposit for due performance of the contract.
The “performance security deposit/retention money” vide clause 18 shall also be applicable
limiting to a maximum of 10% of the contract value.
Tender submitted by tenderers shall remain valid for acceptance for a period of four
months from the date of opening of the tender (Technical Bid in the case of two bid). The
tenderer shall not be entitled during the said period of four months, without the consent in
writing of the Owner, to revoke, or cancel his tender or vary the tender given or any term
thereof. In case of tenderer revoking or canceling his tender, varying any terms in regard
thereof without the consent of Owner in writing, appropriate penal action will be taken by
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
BPCL as deemed fit including putting the tenderer/contractor on ‘Holiday listing’/’Delisting’
barring the tenderer/contractor from participating in future tenders for an appropriate
period from the date of revocation/cancellation/varying the terms. Further in the case of
contractors who are not registered with BPCL, the earnest money deposited by him will be
forfeited. Once the quotation is accepted the rates quoted shall be firm till the entire work
8 ADDENDA / CORRIGENDA:
Addenda/ Corrigenda to the tender documents may be issued prior to the date of opening
of the tenders to clarify documents or to effect modification in the design or tender terms.
All addenda/corrigenda issued shall become part of tender Document.
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER:
9.1 The right to accept the tender will rest with the Owner. The Owner, however, does
not bind itself to accept the lowest tender, and reserves to itself the authority to reject any
or all the tenders received without assigning any reason whatsoever.
9.2 The whole work may be split up between two or more contractors or accepted in
part and not entirely if considered expedient.
9.3 Tenders in which any of the particulars and prescribed information’s are missing or
are incomplete in any respect and/or the prescribed conditions are not fulfilled are liable to
9.4 Canvassing in connection with tenders is strictly prohibited and tenders submitted
by the tenderer who resort to canvassing will be liable to rejection.
9.5 Tender containing uncalled remarks or any additional conditions are liable to be
10 INTEGRITY PACT (IP):
Vendors are requested to sign & return our pre-signed IP document, if applicable. This
document is essential & binding. Vendor's failure to return the IP document duly signed
along with Bid Document may result in the bid not being considered for further evaluation.
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE:
The tenderer shall visit the site and acquaint himself fully of the site and no claims
whatsoever will be entertained on the plea of ignorance or difficulties involved in execution
of work or carriage of materials.
The time period allowed for carrying out the job shall be as shown in tender document.
Request for revision for time schedule after tenders are opened will not be received for
12 RETIRED GOVERNMENTS OR COMPANY OFFICER:
No Engineer of Gazetted rank or other Gazetted Officer, employed in Engineering or
Administrative duties in an Engineering Department of the States/Central Government or of
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
the Owner is allowed to work as a Contractor for a period of two years after his retirement
from Government service or from the employment of the Owner without the previous
permission of the Owner. The contract, if awarded, is liable to be cancelled if either the
contractor or any of his employees is found at any time to be such a person, who had not
obtained the permission of the State/ Central Government, or of the Owner as aforesaid
before submission of tender, or engagement in the Contractor’s service as the case may be.
13 SIGNING OF THE CONTRACT:
The successful tenderer shall be required to execute an agreement in the proforma
attached with tender enquiry within a period of one month of the receipt by him of the
notification of acceptance of tender. The payment will not be processed till the time the
agreement is executed.
14 FIELD MANAGEMENT:
The field management will be the responsibility of the Engineer-in-Charge, who will be
nominated by the Owner. The Engineer-in-Charge may also authorize his representatives to
perform his duties and functions.
Coordination of Work - The Engineer-in-Charge shall coordinate the work of various
agencies engaged at site to ensure minimum disruption of work carried out by different
agencies. It shall be the responsibility of the contractor to plan and execute strictly in
accordance with the site instructions to avoid hindrance to the works being executed by
other agencies.
CONSULTANCY CONTRACTS:
This General Conditions of Contract (GCC) will be binding for Consultancy jobs only to the
extent of its applicability to the context of consultancy.
INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT:
15.1 Except if and to the extent otherwise provided by the Contract, the provisions of the
General Conditions of Contract and special conditions shall prevail over those of any other
documents forming part of the contract. Several documents forming the contract are to be
taken as mutually explanatory. Should there be any discrepancy, inconsistency, error or
omission in the contract or any of the matter may be referred to Engineer-in-Charge, who
shall give his decisions and issue to the Contractor instructions directing in what manner the
work is to be carried out. The decision of the Engineer-in-Charge shall be final and
conclusive, and the contractor shall carry out work in accordance with this decision.
15.2 Works shown upon the drawing but not mentioned in the specifications or described
in the specification without being shown on the drawings shall nevertheless be held to be
included in the same manner as if they had been specifically shown upon the drawings and
described in the specifications.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
15.3 Headings and marginal notes to the clauses of these General Conditions of Contract
or to specifications or to any other tender document are solely for the purpose of giving a
concise indication and not a summary of the content thereof, and they shall never be
deemed to be part thereof or be used in the interpretation or construction thereof
of the Contract.
15.4 Singular and Plural:
In these contract documents unless otherwise stated specifically, the singular shall include
the plural and vice-versa wherever the context so requires. Words indicating persons shall
include relevant incorporated companies/ registered as associations/ body of individual/
firm or partnership.
16 SPECIAL CONDITIONS OF CONTRACT:
16.1 Special Conditions of contract shall be read in conjunction with the General
Conditions of Contracts, specification of work, Drawings and any other documents forming
part of this contract wherever the context so requires.
16.2 Notwithstanding the sub-division of the documents into these separate sections and
volumes every part of each shall be deemed to be supplementary to and complementary of
every other part and shall be read with and into the contract so far as it may be practicable
16.3 Where any portion of the General Conditions of Contract is repugnant to or at
variance with any provisions of the Special Conditions of Contract then, unless a different
intention appears the provisions of the Special Conditions of Contract shall be deemed to
over-ride the provision of the General Conditions of Contract and shall to the extent of such
repugnance or variations, prevail.
16.4 Wherever it is mentioned in the specifications that the Contractor shall perform
certain work or provide certain facilities, it is understood that the contractor shall do so at
16.5 The materials, designs and workmanship shall satisfy the relevant Indian Standards,
the Job specifications contained herein, and codes referred to. Where the job specifications
stipulate requirements in addition to those contained in the standard codes and
specifications, these additional requirements shall also be satisfied.
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION:
The contractor in fixing rate shall for all purposes whatsoever be deemed to have himself
independently obtained all necessary information for the purpose of preparing his tender.
The contractor shall be deemed to have examined the Contract Documents, to have
generally obtained his own information in all matters whatsoever that might affect the
carrying out the works at the scheduled rates and to have satisfied himself to the sufficiency
to his tender. Any error description of quantity or omission there from shall not vitiate the
contract or release the Contractor from executing the work comprised in the contract
according to drawing and specifications at the scheduled rates. He is deemed to have
known the scope, nature and magnitude of the works and the requirements of materials
and labor involved etc. and as to what all works, he must complete in accordance with the
contract documents whatever be the defects, omissions or errors that may be found in the
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Contract Documents. The Contractor shall be deemed to have visited surrounding to have
satisfied himself to the nature of all existing structures, if any, and also as to the nature and
the conditions of the Railways, roads, bridges and culverts means of transport and
communications, whether by land, water or air, and as to possible interruptions thereto and
the access to and regress from the site, to have made enquiries, examined and satisfied
himself as to the sites for obtaining sand, stones, bricks and other materials, the sites for
disposal of surplus materials the available accommodation as to whatever required, depots
and such other building as may be necessary for executing and completing the works, to
have made local independent enquiries as to the sub-soil water and variations thereof,
storms, prevailing winds, climate conditions and all other similar matters affecting these
works. He is deemed to have acquainted himself as to his liability for payment of
Government taxes, customs duty, and other charges.
Any neglect or failure on the part of the Contractor in obtaining necessary and reliable
information upon the foregoing or any other matters affecting the contract shall not relieve
him from any risk or liabilities or the entire responsibility from completion of the works at
the scheduled rates and time in strict accordance with the contract documents. No verbal
agreement or inference from conversation with any officer or employee of the owner either
before or after the execution of the contract agreement shall in any way affect or modify
any of the terms or obligations herein contained.
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY:
18.1 To ensure performance of the contract and due discharge of the contractual
obligations, the successful contractor will have to provide security deposit of 10% of the
contract value unless otherwise specified in the Special Conditions of Contract.
This Security deposit may be furnished in the form of an Account payee Demand Draft
payable to BPCL or Bank Guarantee in the prescribed format. The contractor shall have the
option to adjust any Earnest Money Deposit-(EMD) if paid by demand draft towards security
deposit if he so desires or otherwise if submitted by way of bank guarantee the validity of
the same to be extended suitably as advised by BPCL.
In the case of security deposit submitted in the form of Bank guarantee, the Bank
Guarantee shall be valid and remain in force till the contractual completion period (expiry of
the defect liability period- refer clause-72, if applicable) and with a claim period of six
months thereafter. The Bank Guarantee shall be in the form prescribed.
In case the successful contractor is not furnishing the performance security deposit as
referred above on award of the job, the same shall be deducted from each running account
bills at the rate of 10% of bill value till overall security deposit of 10% as mentioned above is
The security deposit will be retained till the successful completion of the work and
thereafter till the expiry of the defect liability period (refer clause-72), if applicable. This
retention money/Bank guarantee held shall be released after the expiry of the defect
liability period provided that any defects appearing during that period are corrected by the
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
contractor and subject to Clause 18.2 below.
In the case of value/rate/quantity contracts, the security deposit shall be based on
individual release orders issued.
18.2 If the contractor/ sub-contractor or their employees shall break, deface or destroy
any property belonging to the Owner or other agency during the execution of the contract,
the same shall be made good by the Contractor at his own expenses and in default thereof,
the Engineer-in-Charge may cause the same to be made good by other agencies and recover
expenses from the contractor (for which the certificate of the Engineer-in-Charge shall be
final). These expenses can be recovered from the security deposit/retention money if
recovery from other sources is not possible.
18.3 All compensation or other sums of money payable by the contractor to the Owner
under terms of this contract may be deducted from his security deposit/retention money or
from any sums which may be or may become due to the contractor by the Owner on any
account whatsoever and in the event of his security deposit/retention money being reduced
by reasons of any such deductions. The contractor shall within ten days thereafter make
good any sum or sums, which may have been deducted from his security Deposit/retention
money. No interest shall be payable by the Owner from sum deposited as security
deposit/retention money.
18.4 The security deposit shall be held by the Owner, as security for the due performance
of the Contractor’s obligations under the contract, if nothing herein stated shall make it
incumbent upon the Owner to utilize the security deposit/retention money in preference to
any other remedy which the Owner may have, nor shall be construed as confining the
claims of the Owner against the contractor to the quantum of the Security
Deposit/retention money.
18.5 The Bank guarantee if submitted shall be from any Indian scheduled bank or an
international bank of repute having a branch in India or a corresponding banking
relationship with an Indian scheduled bank. The security deposit/retention money shall be
in Indian Rupee in the case of domestic bidders and in US Dollars in the case of foreign
19 TIME OF PERFORMANCE:
19.1 The work covered by this contract shall be commenced as detailed in the purchase
order or as per the instructions of the Engineer in charge and be completed in stages on or
before the dates as mentioned in the time schedule of completion of work. The contractor
should bear in mind that time is the essence of this agreement unless such time be
extended pursuant to the provision of clause No. 21. Request for revision of Completion
time after tenders are opened will not receive consideration.
19.2 Time Schedule of Completion: The general time schedule of completion is given in
the tender document. Contractor should prepare a detailed monthly and weekly execution
programme, jointly with the Engineer-in-Charge within two weeks of receipt of Letter of
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Intent or acceptance of tender. The work shall be executed strictly as per the time schedule
given in this document. The period of completion given includes the time required for
testing, rectifications, if any, retesting and completion in all respects to the entire
satisfaction of the Engineer-in-Charge.
20 FORCE MAJEURE:
Any delays in or failure of the performance of either part hereto shall not constitute default
here under or give rise to any claims for damages, if any, to the extent such delays or failure
of performance is caused by occurrences such as Acts of God or the public enemy
expropriation or confiscation of facilities by Govt./authorities, compliances with any order
or request of any Government authorities, acts of war, rebellion or sabotage or fires, floods,
explosions, riots or strikes. The contractor shall keep records of the circumstances referred
to above and bring these to the notice of Engineer-in-Charge in writing immediately on such
21 EXTENSION OF TIME:
If the contractor shall desire an extension of the time for completion of the work on the
grounds of his having been unavoidably hindered in its execution or on any other grounds,
he shall apply in writing to the Engineer-in-Charge within two weeks of the date of
hindrance on account of which he desires such extension as aforesaid, and the Engineer-in-
Charge shall if in his opinion (which shall be final), reasonable grounds have been shown
thereof, authorize such extension of time as may in his opinion be necessary or proper.
In the event of extension of Time of the contract, if granted, the contractor shall be required
to suitably extend the period of Bank Guarantee if submitted, towards security
Deposit/retention money suitably.
22. LIQUIDATED DAMAGES FOR DELAY:
22.1 Time is the essence of the contract. In case the contractor fails to complete the
whole work within the stipulated period, he shall be liable to pay liquidated damages of
0.5% of the value of contract per week and or part thereof of the delay subject to a
maximum of 5% of the value of the contract. The parties agree that this is a genuine pre-
estimate of the loss/damage which will be suffered by the owner on account of delay on the
part of the contractor and the said amount will be payable on demand without there being
any proof of the actual loss or damages having been caused by such delay/breach. The
owner shall be at liberty to adjust or deduct the said amount of liquidated damages from
any amount due to the contractor including Security Deposit.
22.2 The owner shall be at liberty to deduct or retain from any amount payable to the
contractor periodically, the proportionate or full amount of liquidated damages as the case
may be for the delay periodically caused by the contractor.
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS REASONABLE
COMPENSATION WITHOUT REFERENCE TO ACTUAL LOSS:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
All sums payable by way of compensation under any of the conditions shall be considered as
reasonable compensation without reference to the actual loss or damage, which shall have
been sustained by the Owner.
24 TERMINATION/OFFLOADING:
24.1 The contractor fully understands that timely completion of the work as per the
schedule is of paramount necessity as otherwise it would lead to adversely affecting the
schedules of other works/project with resultant financial and other losses to the
Company/owner. In view of this, the contractor unconditionally agrees and binds himself to
be liable for all the consequences for non-completion of the work within the stipulated
24.2 In case a situation is brought about by the contractor warranting termination/off-
loading of the whole or any part of the work for any reason whatsoever, the
Company/owner shall have the liberty and right to entrust/engage/award the work so
terminated/off loaded at the risk and cost of the contractor to any other agency/contractor
by adopting any mode of inviting tenders, i.e. open/limited/single party/negotiation basis
etc. in order to ensure completion of the work as per the schedule or at the quickest
25. FORFEITURE OF SECURITY DEPOSIT:
Whenever any claim against the Contractor for the payment of a sum of money arises out of
or under the contract, the Owner shall be entitled to recover such sum by appropriating in
part or whole, security deposit of the contractor, forming whole or part of such security
being insufficient or if no security has been taken from the Contractor then the balance or
the total sum recoverable, as the case may be, shall be deducted from any sum then due or
which at any time thereafter may become due to the Contractor. The contractor shall pay to
the owner on demand any balance remaining due.
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which, under any clause or clauses of this contract, the contractor shall have
forfeited the whole of his security deposit (whether paid in one sum or deducted by
installment) or have committed a breach of any of the terms contained in this contract the
owner shall have power to adopt any of the following courses as he may deem best suited
to his interest. To rescind the contract (of which rescission notice in writing to the
contractor under the hand of the owner shall be conclusive evidence) in which case the
security deposit of the contractor shall stand forfeited and be absolutely at the disposal of
a) To employ labour paid by the owner and to supply materials to carry out the
work any part of the work, debiting contractor with the labour cost of tools and plants and
equipment charges, the cost of the materials for which a certificate of the Engineer-in-
Charge shall be final and conclusive against the Contractor and 10% of costs as above to
cover all departmental charges and crediting him with the value of the work done in all
respects in the manner and at the same rates as if it had been carried out by the Contractor
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
under the term of his contract. The certificate of Engineer-in-Charge as to the value of the
work done shall be final and conclusive against the contractor.
b) To measure up the work of the contractor and to take such part thereof as
shall be unexecuted out of his hand to give it to another contractor to complete in which
case any expenses which may be incurred in excess of the sum which would have been paid
to the original contractor, if the whole work had been executed by him (of the amount of
which excess, the certificate in writing of the Engineer-in-Charge shall be final and
conclusive) shall be borne and paid by the original contractor and may be deducted from
any money due to him by the Owner under the contract or otherwise or from his security
deposit or from the proceeds of sale thereof, of a sufficient part thereof.
In the event of any of the above course being adopted by the Owner, the contractor shall
have no claim to compensation for any loss sustained by him by reason of his having
purchased or procured any materials or entered into any agreements or made any advances
on account of or with a view to the execution of the work of the performance of the
contract. In case the Contractor shall not be entitled to recover or be paid any sum for any
work actually performed under this contract unless the Engineer-in-Charge will certify in
writing the performance of such work and the value payable in respect thereof and he shall
only be entitled to be paid the value so certified.
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT TAKEN
UNDER CLAUSE 26:
In any case in which any of the powers conferred upon the owner by clause 26 thereof shall
have become exercisable and the same had not been exercised, the non exercise thereof
shall not constitute a waiver of any of the conditions hereof and such powers shall
notwithstanding be exercised in the event of any further case of default by the contractor
for which any clause of hereof he is declared liable to pay compensation amounting to the
whole of his security deposit and the liability of the contractor for past and future
compensation shall remain unaffected. In the event of the Owner putting in force the power
under sub-clause (a), (b) or (c) vested in him under the proceeding clause he may, if he so
desires takes possession of all or any tools and plants materials and stores in or upon the
works or the site thereof belonging to the contractor or procured by him and intended to be
used for the execution of the work or any part thereof paying or allowing for the same in
account at the contract rates or in case of these not being applicable at current market
rates to be certified by the Engineer-in-Charge whose certificate thereof shall be final
otherwise the Engineer-in-Charge may give notice in writing to the contractor or his clerk of
the works, supervisor or other authorized agent, requiring him to remove such tools, plant,
materials or stores from the premises (within a time to be specified in such notice) and in
the event of the contractor failing to comply with any such requisition, the Engineer-in-
Charge may remove them at the contractors expense or sell them by auction or private sale
on account of the contractor and at his risk in, all respects without any further notice as to
the date, time or place of sale and the certificate of the Engineer-in-Charge as to the
expense of any such removal and the amount of proceeds and any expenses of any such
sale shall be final and conclusive against the contractor.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK:
If at any time from the commencement of the work the owner shall for any reasons
whatsoever, not require the whole or part thereof as specified in the tender to be carried
out, the Engineer-in-Charge shall give notice in writing of the fact to the contractor, who
shall have no claim to any payment or compensation whatsoever on account of any profit or
advantage which he might have derived from the execution of the work in full, but which he
did not derive in consequence of the full amount of the work not having been carried out,
neither shall he have any claim for compensation by reason of any alterations having been
made in the original specifications, drawings, designs and instructions which shall involve
any curtailment of the work as originally contemplated.
29 CHANGES IN CONSTITUTION:
Where the contractor is a partnership firm, the prior approval, in writing, of the Owner shall
be obtained before any change is made in the constitution of the firm, where the contractor
is an individual or a Hindu undivided family business concern, such approval as aforesaid
shall likewise be obtained before sub-contractor enters into any agreement with other
parties, where under the reconstituted firm would have the right to carry out the work
hereby undertaken by the contractor. In either case if prior approval as aforesaid is not
obtained, the contract shall be deemed to have been allotted in contravention of clauses
hereof and the same action may be taken and, the same consequence shall ensure as
provided in the said clause.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
30 IF THE CONTRACTOR DIES:
Without prejudice to any of the rights or remedies under his contract, if the contractor dies,
the Owner shall have the option of terminating the contract without compensation to the
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE:
No director or official or employee of the Owner shall in any way be personally bound or
liable for the acts or obligations of the Owner under the contract or answerable for any
default or omission in the observance or performance of any of the acts, matters or things
which are herein contained.
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS:
The contractor shall not be entitled to any increase on the item rates of the contract or any
other right or claim whatsoever by reason of representation, explanation or statement or
alleged representation, promise or guarantees given or alleged to have been given to him
33 CONTRACTOR’S OFFICE AT SITE:
The contractor shall provide and maintain an office at the site, if space provided by the
owner, for the accommodation of his agent and staff and such office shall be open at all
reasonable hours to receive instruction, notices, or other communications.
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS:
34.1 The contractor, on or after award of the work shall name and depute
qualified personnel having sufficient experience in carrying out work of similar nature to
whom the equipments materials, if any, shall be issued and instructions for works given.
The contractor shall also provide to the satisfaction of the Engineer-in-Charge sufficient and
qualified staff to supervise the execution of the-works, competent sub-agents, supervisor
and leading hands including those specially qualified by previous experience to supervise
the type of works comprised in the contract in such manner as will ensure work of the best
quality, expeditious working. Whenever in the opinion of the Engineer-in-Charge, additional
properly qualified supervision staff is considered necessary, they shall be employed by the
contractor without additional charges on account thereof. The Contractor shall ensure to
the satisfaction of the Engineer-in-Charge that sub-contractors, if any shall provide
competent and efficient supervision over the work entrusted to them.
34.2 If and whenever any of the Contractor’s or sub-contractor’s agents, sub-
agents, assistants supervisor or other employees shall in the opinion of Engineer-in-Charge
be guilty of any misconduct or be incompetent or insufficiently qualified or negligent in the
performance of their duties or that in the opinion of the owner or Engineer-in-Charge, it is
undesirable for administrative or any other reason for such person or persons to be
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
employed in the works, the contractor, if so directed by the Engineer-in-Charge, shall at
once remove such person or persons from employment thereon. Any person or persons so
removed from the works shall not again be employed in connection with the works without
the written permission of the Engineer-in-Charge. Any person so removed from the works
shall be immediately replaced at the expense of the contractor by a qualified and
competent substitute. Should the contractor be requested to repatriate any person
removed from the works he shall do so and shall bear all costs in connection herewith.
34.3 The contractor shall be responsible for the proper behavior of all the staff,
supervisor, workmen and others and shall exercise a proper degree of control over them
and in particular, and without prejudice to the said generality, the contractor shall be bound
to prohibit and prevent any employees from trespassing or acting in any way detrimental or
prejudicial to the interest of the community or of the properties or occupiers of land and
properties in the neighborhood and in the event of such employee so trespassing, the
contractor shall be responsible therefore and relieve the Owner of all consequent claims or
actions for damages or injury or any other grounds whatsoever. The decision of the
Engineer-in-Charge upon any matter arising under this clause shall be final. Contractor shall
ensure that none of their employees are ever engaged in any anti-national activities.
34.4 All contractor’s personnel entering upon the Owner’s premises shall be
properly identified by badges issued by owner which must be worn all times on Owner’s
35 SUB-LETTING OF WORK:
Subletting of contracts shall not be generally permitted. However, owner may permit
subletting of work on specific cases subject to the following: -
i) No part of the contract nor any share of interest there shall in any manner or
degree be transferred assigned sublet by the contractor directly or indirectly to any firm or
corporation whosoever except as provided for in the succeeding sub-clause, without the
consent in writing of the Owner.
ii) Sub-Contractors for Temporary Works Etc.: - The Owner may give written
consent to sub-contract for execution of any part of the works at the site, being entered
into by the contractor provided each individual sub-contract is submitted to the Engineer-
in-Charge before being entered into and is approved by him.
iii) List of Sub-Contractors to be supplied: - At the commencement of every month
the contractor shall furnish to the Engineer-in-Charge list of all sub-contractors or firms
engaged by the contractor and working at the site during the previous month with
particulars of the general nature of the sub-contract or works.
iv) Contractor’s Liability Not Limited By Sub-Contractors:- Notwithstanding any sub-
letting with such approval as aforesaid and notwithstanding that the Engineer-in-Charge
shall have received copies of any sub-contracts, the contractor shall be and shall remain
solely responsible for the quality and proper and expeditious execution of the works and
the performance of all the conditions of the contract in all respects as if such sub-letting or
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
sub-contracting had not taken place and as if such work had been done directly by the
v) Owner may Terminate Sub-Contracts:- If any sub-contractor engaged upon the
works at the site executes any work which in the opinion of the Engineer-in-Charge is not in
accordance with the Contract documents, the owner may by written notice to the
contractor request him to terminate such sub-contract and the contractor upon the receipt
of such notice shall terminate such sub contract and the latter shall forthwith leave the
works, failing which the owner shall have right to remove such sub-contractors from the
vi) No Remedy for Action Taken Under This Clause: - No action taken by the owner
under the clause shall relieve the contractor of any of his liabilities under the contract or
give rise to any right to compensation, extension of time or otherwise failing which, the
owner shall have right to remove such sub-contractors from the Site.
36 POWER OF ENTRY:
If the contractor shall not commence the work in the manner previously described in the
contract document or if he shall, at any time in the opinion of the Engineer-in-Charge.
i. Fail to carry out the works in conformity with the contract documents, or
ii. Fail to carry out the works in accordance with the time schedule, or
iii. Substantially suspend work or the works for a period of Fourteen days
without authority from the Engineer-in-Charge, or
iv. Fail to carry out and execute the works to the satisfactions of the Engineer-
v. Fail to supply sufficient or suitable constructional equipments, temporary
works, labor materials or things, or
vi. Commit or suffer or permit any other breach of any of the provisions of the
contract on his part to be performed or observed or persist in any of the above-mentioned
breaches of the contract for the fourteen days, after notice in writing shall have been given
to the Contractor by the Engineer-in-Charge requiring such breach to be remedied, or
vii. Abandon the works, or
viii. During the continuance of the contract, become bankrupt, make any
arrangement or composition with his creditors, or permit any execution to be levied or go
into liquidation whether compulsory or voluntary not being merely a voluntary liquidation
for the purpose of amalgamation or reconstruction.
Then in any such case, the Owner shall have the power to enter upon the works and take
possession thereof and of the materials, temporary works, constructional equipment, and
stock thereon, and to revoke the contractor’s license to use the same, and to complete the
works, by his agents, other contractor or workmen, or to re-let the same upon any terms
and to such other person firm or corporation as the Owner in his absolute discretion may
think proper to employ and for the purpose aforesaid to use or authorize the use of any
materials, temporary works constructional equipment, and stock as aforesaid without
making payment or allowances to the contractor for the said materials other than such as
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
may be certified in writing by the Engineer-in-Charge to be reasonable, and without making
any payment or allowance to the contractor for the use of the temporary said works,
constructional equipments and stock or being liable for any loss of damage thereto, and if
the Owner shall by reason of his taking possession of the works or of the works being
completed by other contractors (due account being taken of any such extra work or works
which may be omitted) then the amount of such excess as certified by the Engineer-in-
Charge shall be deducted from any money which may be due for work done by the
contractor under the contract and not paid for. Any deficiency shall forthwith be made
good and paid to the Owner by the contractor and the Owner shall have power to sell in
such manner and for such price as he may think fit all or any of the constructional
equipment, materials etc. belonging to and to recoup and retain the said deficiency or any
part thereof out of the proceeds of the sale.
37 CONTRACTORS RESPONSIBILITY WITH OTHER AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor
executing the work of civil construction, to work in close co-operation and co-ordinate the
works with other contractors or their authorized representatives and the contractor will put
up a joint scheme, showing the arrangements, with other contractors / agencies for carrying
his portion of work to the Engineer-in-Charge, and get the approval. The contractor before
finally submitting the schemes to the Engineer-in-Charge shall have the written agreement
of the other agencies. The Engineer-in-Charge before communicating his approval of the
scheme, with any required modifications shall get the final agreement of all the agencies,
which shall be binding. No claim shall be entertained on account of the above.
The contractor shall conform in all respects with the provisions of any statutory regulations,
ordinances or by laws of any local or duly constituted authorities or public bodies which
may be applicable from time to time to the works or any temporary works. The contractor
shall keep the Owner Indemnified against all penalties and liabilities of every kind arising
out of non-adherence to such statute’s ordinances, laws, rules, regulations, etc.
38 OTHER AGENTS AT SITE:
The contractor shall have to execute the work in such place and condition where other
agencies might also be engaged for other works such as site grading, filling and leveling,
electrical and mechanical engineering works etc. No claim shall be entertained to works
being executed in the above circumstances.
Any notice hereunder may be served on the contractor or his duly authorized
representative at the job site or may be served by registered mail direct to the address
furnished by the Contractor. Proof of issue of any such notice could be conclusive of the
contractor having been duly informed of all contents therein.
40 RIGHTS OF VARIOUS INTERESTS:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
i) The Owner reserves the right to distribute the work between more than one
contractor. The contractor shall co-operate and afford other contractors’ reasonable
opportunity for access to the works for the carriage and storage of materials and execution
of their works.
ii) Whenever the work being done by any department of the Owner or by other
contractors employed by the Owner is contingent upon work covered by the contract, the
respective rights of the various interests involved shall be determined by the Engineer-in-
Charge to secure the completion of the various portions of the work in general harmony.
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT:
i) Owner shall, at any time be entitled to determine and terminate the contract, if in
the opinion of the Owner the cessation of the work becomes necessary owing to paucity of
funds or for any other cause whatsoever, in which case, the cost of approved materials at
the site at current market rates as verified and approved by Engineer-in-Charge and of the
value of the work done to date by the contractor shall be paid for in full at the rates
specified in the contract. A notice in writing from the Owner to the contractor of such
determination and termination and the reason thereof, shall be the conclusive proof of the
fact that the contract has been so determined and terminated by the Owner.
ii) Should the contract be determined under sub-clause (i) of this clause and the
contractor claims payments to compensate expenditure incurred by him in the expectation
of completing the whole of the work, the Owner shall consider and admit such claim as are
deemed fair and reasonable and are supported by vouchers to the satisfaction of the
Engineer-in-Charge. The Owner’s decision on the necessity and propriety of any such
expenditure shall be final and conclusive and binding on the contractor.
42 PATENTS AND ROYALTIES:
42.1 The contractor, if licensed under any patent covering equipment, machinery,
materials or compositions of matter to be used or supplied or methods and process to be
practiced or employed in the performance of this contract, agrees to pay all royalties and
licence fees which may be due with respect thereto. If any equipment, machinery, materials
or composition matters, to be used or supplied or methods and process to be practised or
employed in the performance of this contract, is covered by a patent under which
contractor is not licensed then the contractor before supplying or using the equipment,
machinery, materials, compositions method or processes shall obtain such licences, and pay
such royalties and licence fees as may be necessary for performance of the contract. In the
event, the contractor fails to pay any such royalties or obtain any such licence, any suit for
infringement of such patents which is brought against the contractor or the Owner as a
result of such failure will be defended by the contractor at his own expenses and the
contractor will pay any damages and costs awarded in such suit. The contractor shall
promptly notify the owner if the contractor has acquired knowledge of any patent under
which a suit for infringement could be reasonably brought because of the use by the Owner
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
of any equipment, machinery, materials, and process methods to be supplied hereunder.
The contractor agrees to and does hereby grant to Owner, together with the right to extend
the same to any of the subsidiaries of the Owner as irrevocable, royalty-free licence to use
in any country, any invention made by the contractor or his employee in or as a result of the
performance of the work under the contract.
The Owner shall indemnify and save harmless the contractor from any loss on account of
claims on contractor for the contributory infringement of patent rights arising out and
based upon the claim that the use by the Owner of the process included in the design
prepared by the Owner and used in the operation of the plant infringes on any patent right
with respect to any sub-contract entered into by contractor pursuant to the provisions of
sub-contractor an undertaking to provide the Owner with the same patent protection that
contractor is required to provide under the provisions of this clause.
42.2 All drawings, blue prints, tracings, reproducible, models, plans, specification and
copies thereof, furnished by the Owner as well as drawings, tracings, reproducible, plans
specifications, design, calculations etc. prepared by the contractor for the purpose of
execution of works covered in or connected with this contract shall be the property of
Owner and shall not be used for any other work but are to be delivered to the Owner at the
completion of the contract.
42.3 Where so desired by Engineer-in-Charge, the contractor agrees to respect the
secrecy of any document, drawings etc. issued to him for the execution of this contract, and
restrict access to such documents, drawing etc. to the minimum and further, the contractor
agrees to execute an individual SECRECY agreement from each or any person employed by
contractor having access to such documents, drawings and to any other agency or
individual, without the written approval by Engineer-in-Charge.
43.1 If, at any time, there should be evidence or any lien or claim for which the Owner
might have become liable and which is chargeable to the contractor, the Owner shall have
the right to retain out of any payment then due or thereafter to become due an amount
sufficient to completely indemnify the owner against such lien or claim and if such lien or
claim be valid the Owner may pay and discharge the same and deduct the amount so paid
from any money which may be or may become due and payable to the Contractor. If any
lien or claim remain unsettled after all payments are made, the contractor shall refund or
pay to the Owner all moneys that the latter may be compelled to pay in discharging such
lien or claim including all costs and reasonable expenses.
43.2 Contractor will not disclose details of the work to any person or persons except those
engaged in its performance, and only to the extent required for the particular portion of the
work being done.
Contractor will not give any items concerning details of the work to the press or a news
disseminating agency without prior written approval from Engineer-in-Charge. Contractor
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
shall not take any pictures on site without written approval of Engineer-in-Charge
44 OPERATION OF CONTRACT:
44.1 Law Governing:
Regardless of the place of contracting, place of performance or otherwise, this Agreement,
and all amendments, modifications, alterations, or supplements, thereto shall be governed
by the laws of India and respective state laws for the nature, validity and interpretation
44.2 Non-Waiver of Default:
Any failure by the Owner or Contractor at any time, or from time to time, to enforce or
require the strict keeping and performance of any of the terms or conditions of this
agreement, or to exercise a right hereunder, shall not constitute a waiver of such terms,
conditions or rights, and shall not affect or impair same, or the right of the Owner or the
Contractor, as the case may be at any time to avail itself of same.
PERFORMANCE OF WORK
45 EXECUTION OF WORKS:
45.1 All the works shall be executed in strict conformity with the provisions of the
contract documents and with such explanatory detailed drawings, specifications, and
instructions as may be furnished from time to time to the contractor by the Engineer-in-
Charge whether mentioned in the contract or not. The contractor shall be responsible for
ensuring that works throughout are executed in the most substantial, proper and workman
like manner with the quality of material and workmanship in strict accordance with the
specifications following all safety requirements of BPCL and as stipulated in work permits as
per the directions and to the entire satisfaction of the Engineer-in-Charge.
45.2 Wherever it is mentioned in the specifications that the Contractor shall perform
certain work or provide certain facilities/materials, it is understood that the contractor shall
do, so at his cost unless otherwise specified.
45.3 The materials, design and workmanship shall satisfy the relevant Indian Standards,
the Job specification contained herein and codes referred to. Where the job specification
stipulate requirements in addition to those contained in the standards codes and
specifications, these additional requirements shall also be satisfied.
46 COORDINATION AND INSPECTION OF WORK:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
The coordination and inspection of the day-to-day work under the contract shall be the
responsibility of the Engineer-in-Charge. The written instructions regarding any particular
job will be normally be passed by the Engineer-in-Charge or his authorized representative. A
work order book / logbook will be maintained by the Contractor for each job in which the
aforesaid written instructions will be entered. These will be signed by the contractor or his
authorized representative by way of acknowledgment within 12 hours. The non maintaining
of the order book or non signing by the contractor shall not preclude the contractor from
complying with the instructions.
47 WORK IN MONSOON AND DEWATERING:
47.1 The completion of the work may entail working in the monsoon also. The contractor
must maintain a minimum labour force as may be required for the job and plan and execute
the construction and erection according to the prescribed schedule. No extra rate will be
considered for such work in monsoon.
47.2 During monsoon and other period, it shall be the responsibility of the contractor to
keep the construction work site free from water at his own cost.
48 WORK ON SUNDAYS AND HOLIDAYS:
For carrying out work on Sundays and Holidays if needed, the contractor will approach the
Engineer-in-Charge or his representative at least two days in advance and obtain permission
in writing. No special compensation on this account will be payable.
49 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK:
49.1 Place of Work:
The work has to be executed at specified premises as per the tender. Contractor should
apprise himself of all the conditions prevailing in such location and the restrictions placed
on movement of personnel and equipment, types of equipment and tools permitted,
working methods allowed etc. in the light of security and safety regulations operative in the
The safety regulations to be complied with, by the contractor will also be provided along
with the tender. No idle time wages or compensation for temporary stoppage of work or
restrictions would be paid, and the rate quoted for the various items of work should cover
the cost of all such contingencies and eventualities. Substantial structures and utilities exist
both above ground and underground, adjacent to the work site. (The construction activity
gets restrained by the existence of such structures and utilities). Special care is necessary in
transportation, storage, working on equipments and other construction activities to protect
the existing features and prevent damage to any facility. Necessary protective structures
barricades etc. have to be erected at various places as directed by Engineer-in-Charge. No
extra payment of such protective works will be made unless specially provided in the
49.2 The working time or the time of work is 48 hours per week normally. Overtime work
is permitted in cases of need and the Owner will not compensate the same. Shift working at
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
2 or 3 shifts per day may become necessary and the contractor should take this aspect into
consideration for formulating his rates for quotation. No extra claims will be entertained by
the Owner on this account.
49.3 The contractor must arrange for the placement of workers in such a way that the
delayed completing of the work or any part thereof for any reasons whatsoever will not
affect their proper employment. The Owner will not entertain any claim for idle time
payment whatsoever.
49.4 The contractor shall submit to the Owner reports at regular intervals regarding the
state and progress of work. The details and preforma of the report will mutually be agreed
after the award of contract.
50 DRAWINGS TO BE SUPPLIED BY THE OWNER:
50.1 Where drawings are attached with tender, these shall be for the general guidance of
the contractor to enable him to visualize the type of work contemplated and scope of work
involved. The contractor will be deemed to have studied the drawings and formed an idea
about the work involved.
50.2 Detailed working drawings on the basis of which actual execution of the work is to
proceed will be furnished from time to time during the progress of the work. The contractor
shall be deemed to have gone through the drawings supplied to him thoroughly and
carefully and in conjunction with all other connected drawings and bring to the notice of
the Engineer-in-Charge, discrepancies, if any, therein before actually carrying out the work.
50.3 Copies of all detailed working drawings relating to the works shall be kept at the
contractor’s office of the site and shall be made available to the Engineer-in-Charge at any
time during the contract. The drawings and other documents issued by the Owner shall be
returned to the Owner on completion of the works. Reference is also invited to clause
and 42.3 above regarding drawings and other documents.
51 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR:
51.1 Where drawings/data are to be furnished by the contractor, they shall be as
enumerated in the special conditions of contract and shall be furnished within the specified
51.2 Where approval of drawings before manufacture / construction / fabrication has
been specified, it shall be contractor’s responsibility to have these drawings prepared as per
the directions of Engineer-in-Charge and got approved before proceeding with manufacture
construction / fabrication, as the case may be. Any changes that may have become
necessary in these drawings during the execution of the work shall have to be carried out by
the contractor to the satisfaction of Engineer-in-Charge at no extra cost. All final drawings
shall bear the certification stamps duly signed by both the contractor and the Engineer-in-
51.3 A period of 3 weeks from the date of receipt shall be required normally for approval
of drawings by the Engineer-in-Charge.
52 SETTING OUT WORKS:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
52.1 The Engineer-in-Charge shall furnish the contractor with only the four corners of the
work site and a level bench mark and the contractor shall set out the works and shall
provide efficient staff for the purpose and shall be solely responsible for the accuracy of
such setting out.
52.2 The contractor shall provide, fix and be responsible for the maintenance of all
stacks, templates, level marks, profiles and other similar things and shall take all necessary
precaution to prevent their removal or disturbance and shall be responsible for the
consequence of such removal or disturbance should the same take place and for their
efficient and timely reinstatement. The contractor shall also be responsible for the
maintenance of all existing survey marks, boundary marks, distance marks and centre line
marks, either existing or supplied and fixed by the contractor. The, work shall be set out to
the satisfaction of the Engineer-in-Charge. The approval thereof or joining in setting out the
work shall not relieve the contractor of any of his responsibilities.
52.3 Before beginning the works, the contractor shall at his own cost, provide all
necessary reference and level posts, pegs, bamboos, flags, ranging rods, strings and other
materials for proper layout of the work in accordance with the scheme, for bearing marks
acceptable to the Engineer-in-Charge. The centre, longitudinal or face lines and cross lines
shall be marked by means of small masonry pillars. Each pillar shall have distinct marks at
the centre to enable theodolite to be set over it. No work shall be started until all these
points are checked and approved by the Engineer-in-Charge in writing, but such approval
shall not relieve the contractor of any of his responsibilities. The contractor shall also
provide all labour, material and other facilities, as necessary, for the proper checking of
layout and inspection of the points during construction.
52.4 Pillars bearing geodetic marks located at the site of work under construction should
be protected and fenced by the contractor.
52.5 On completion of works, the contractor must submit the geodetic documents
according to which the work was carried out.
53 RESPONSIBILITY FOR LEVEL AND ALIGNMENT:
The contractor shall be entirely and exclusively responsible for the horizontal and vertical
alignment, the levels and correctness of every part of the work and shall rectify effectually
any errors or imperfections therein. Such rectifications shall be carried out by the
contractor, at his own cost, when instructions are issued to that effect by the Engineer-in-
54 MATERIALS TO BE SUPPLIED BY CONTRACTOR:
54.1 The contractor shall procure and provide the whole of the materials required for
construction including tools, tackles, construction plant and equipment for the completion
and maintenance of the works except the materials which will be issued by Owner and shall
make his own arrangement for procuring such materials and for the transport thereof. The
materials procured by the contractor shall be BPCL approved/specified quality.
54.2 All materials procured should meet the specifications given in the tender document.
The Engineer-in-Charge may, at his discretion, ask for samples and test certificates for any
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
batch of any material procured. Before procuring, the contractor should get the approval of
Engineer-in-Charge for any material to be used for the works.
54.3 Manufacturer’s certificate shall be submitted for all materials supplied by the
contractor. If, however, in the opinion of the Engineer-in-Charge any tests are required to
be conducted on the materials supplied by the contractor, these will be arranged by the
contractor promptly at his own cost.
55 MATERIALS SUPPLIED BY OWNER:
55.1 If the specification of the work provides for the use of any materials of special
description to be supplied from the Owner’s stores, price for such material to be charged
therefore as herein after mentioned being so far as practicable for the convenience of the
contractor but not so as in any way to control the meaning or effect of the contract. The
contractor shall be bound to purchase and shall be supplied such materials as are from time
to time required to be used by him for the purpose of the contract only. The sums due from
the contractor for the value of the actual materials supplied by the Owner will be recovered
from the running account bill on the basis of the actual consumption of materials in the
work covered and for which the running account bill has been prepared. After the
completion of the works, however, the contractor has to account for the full quantity of
materials supplied to him as per relevant clauses in this document.
55.2 The value of the materials as may be supplied to the contractor by the Owner will be
debited to the contractor’s account at the rates shown in the schedule of chargeable
materials and if they are not entered in the schedule, they will be debited at cost price,
which for the purpose of the contract shall include the cost of carriage and all other
expenses whatsoever such as normal storage supervision charges which shall have been
incurred in obtaining the same at the Owner’s stores. All materials so supplied to the
contractor shall remain the absolute property of the Owner and shall not be removed on
any account from the site of the work, and shall be at all times open for inspection to the
Engineer-in-Charge. Any such materials remaining unused at the time of completion or
termination of the contract shall be returned to the Owner’s stores or at a place as directed
by the Engineer-in-Charge in perfectly good condition, at contractor’s cost.
56 CONDITIONS FOR ISSUE OF MATERIALS:
i) Materials specified to be issued by the Owner will be supplied to the contractor
by the Owner from his stores/location. It shall be the responsibility of the contractor to take
delivery of the materials and arrange for its loading, transport and unloading at the site of
work at his own cost. The materials shall be issued between the working hours and as per
the rules of the Owner framed from time to time.
ii) The contractor shall bear all incidental charges for the storage and safe custody of
materials at site after these have been issued to him.
iii) Materials specified to be issued by the Owner shall be issued in standard sizes as
obtained from the manufacturer.
iv) The contractor shall construct suitable godown at the site of work for storing the
materials safe against damage by rain, dampness, fire, theft etc. He shall also employ
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
necessary watch and ward establishment for the purpose.
v) It shall be duty of the contractor to inspect the material supplied to him at the
time of taking delivery and satisfy himself that they are in good condition. After the
materials have been delivered by the Owner, it shall be the responsibility of the contractor
to keep them in good condition and if the materials are damaged or lost, at any time, they
shall be repaired and/ or replaced by him at his own cost, according to the directions of the
Engineer-in-Charge.
vi) The Owner shall not be liable for delay in supply or non-supply of any materials
which the Owner has undertaken to supply where such failure or delay is due to natural
calamities, act of enemies, transport and procurement difficulties and any circumstances
beyond the control of the Owner. In no case, the contractor shall be entitled to claim any
compensation or loss suffered by him on this account.
vii) It shall be the responsibility of the contractor to arrange in time all materials
required for the works other than those to be supplied by the Owner. If, however, in the
opinion of the Engineer-in-Charge the execution of the work is likely to be delayed due to
the contractor’s inability to make arrangements for supply of materials which normally he
has to arrange for, the Engineer-in-Charge shall have the right, at his own discretion, to
Issue such materials If available with the Owner or procure the materials from the market
or elsewhere and the contractor will be bound to take such materials at the rates decided
by the Engineer-in-Charge. This, however, does not in any way absolve the contractor from
responsibility of making arrangements for the supply of such materials in part or in full,
should such a situation occur, nor shall this, constitute a reason for the delay in the
execution of the work.
viii) None of the materials supplied to the contractor will be utilized by the contractor
for manufacturing item, which can be obtained from standard manufacturer in finished
ix) The contractor shall, if desired by the Engineer-in-Charge, be required to execute
an indemnity bond for safe custody and accounting of all materials issued by the Owner.
x) The contractor shall furnish to the Engineer-in-Charge sufficiently in advance a
statement showing his requirements of the quantities of the materials to be supplied by the
Owner and the time when the same will be required by him for the works, so as to enable
the Engineer-in-Charge to make necessary arrangement for procurement and supply of the
xi) A daily account of the materials issued by the Owner shall be maintained by the
contractor indicating the daily receipt, consumption and balance in hand. This account shall
be maintained in a manner prescribed by the Engineer-in-Charge along with all connected
papers viz. requisition, issues etc. and shall be always available for inspection in the
contractor’s office at site.
xii) The contractor should see that only the required quantities of materials are got
issued. The contractor shall not be entitled to cartage and incidental charges for returning
the surplus materials, if any, to the stores/location where from they were issued or to the
place as directed by the Engineer-in-Charge.
xiii) Materials/ Equipment supplied by Owner shall not be utilized for any other
purpose(s) than issued for.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
57 MATERIALS PROCURED WITH ASSISTANCE OF OWNER:
Notwithstanding anything contained to the contrary in any or all the clause of this
document where any materials for the execution of the contract are procured with the
assistance of Owner either by issue from Owner’s stock or purchase made under orders or
permits or licences issued by Government, the contractor shall hold the said materials as
trustee for the Owner and use such materials economically and solely for the purpose of
the contract and not dispose them off without the permission of the owner and return, if
required by the Engineer-in-Charge, all surplus or unserviceable materials that may be left
with him after the completion of the contract or at its termination for any reason,
whatsoever on his being paid or credited such prices as the Engineer in-Charge shall
determine having due regard to the condition of the materials. The price allowed to the
contractor however, shall not exceed the amount charged to him excluding the storage
charges if any. The decision of the Engineer-in-Charge shall be final and conclusive in such
matters. In the event of breach of the aforesaid condition, the contractor shall in terms of
the licenses or permits, and/or for criminal breach of trust, be liable to compensate the
Owner a double rate or high rate, in the event of those materials at that time having higher
rate or not being available in the market, then any other rate to be determined by the
Engineer-in-Charge and his decision shall be final and conclusive.
58 MATERIALS OBTAINED FROM DISMANTLING:
If the contractor in the course of execution of the work is called upon to dismantle any part
for reasons other than those stipulated in clauses 64 & 68 hereunder, the materials
obtained in the work of dismantling etc. will be considered as the Owner’s property and will
be disposed off to the best advantage of the Owner.
59. ARTICLES OF VALUE FOUND:
All gold, silver and other materials, of any description and all precious stones, coins,
treasure relies, antiquities and other similar things which shall be found in, under or upon
the site, shall be property of the Owner and the contractor shall duly preserve the same to
the satisfaction of the Engineer-in-Charge and shall from time to time deliver the same to
such person or person indicated by the Owner.
60 DISCREPANCIES BETWEEN INSTRUCTIONS:
Should any discrepancy occur between the various instructions furnished to the contractor,
his agents or staff or any doubt, arise as to the meaning of any such instructions or should
there be any misunderstanding between the contractor’s staff and the Engineer-in-Charge’s
staff, the contractor shall refer the matter immediately in writing to the Engineer-in-Charge
whose decision thereon shall be final and conclusive and no claim for losses alleged to have
been caused by such discrepancies between instructions, or doubts, or misunderstanding
shall in any event be admissible.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
61 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK:
A) The Engineer-in-Charge shall have power to make any alterations in, omissions
from, additions to of substitutions for, the schedule of rates, the original specifications,
drawings, designs and instructions that may appear to him to be necessary or advisable
during the progress of the work and the contractor shall be bound to carry out such altered
/ extra / new items of work in accordance with any instructions which may be given to him
in writing signed by the Engineer-in-Charge and such alterations, omissions, additions or
substitutions shall not invalidate the contract and any altered additional or substituted
work which the contractor may be directed to do in the manner above specified as part of
the work shall be carried out by the contractor on the same conditions in all respect on
which he agree to do the main work. The time for completion of work may be extended for
the part of the particular job at the discretions of the Engineer-in-Charge, for only such
alteration, additions or substitutions of the work, as he may consider as just and
reasonable. The rates for such additional, altered or substituted work under this clause shall
be worked out in accordance with the following provisions:
a) If the rates for the additional, altered or substituted work are specified in the
contract for the work, the contractor is bound to carry out the additional, altered or
substituted work at the same rates as are specified in the contract.
b) If the rates for the additional, altered or substituted work are not specifically
provided in the contract for the work, the rates will be derived from the rates for similar
class of works as specified in the contract for the work. The opinion of the Engineer-in-
Charge as to whether the rates can be reasonably so derived from items in the contracts
will be final and binding on the contractor.
c) If the rates for the altered, additional or substituted work cannot be determined
in the manner specified in sub-clause (a) and (b) above, then the contractor shall inform the
Engineer-in-Charge of the rate which is his intension to charge for such class of work
supported by analysis of the rate or rates claimed, and the Engineer-in-Charge shall
determine the rates on the basis of the prevailing market rates of materials, labour cost at
schedule of labour plus 10% to cover contractor’s supervision, overheads and profit and pay
the contractor accordingly. The opinion of the Engineer-in-Charge as to the current market
rates of materials and the quantum of labour involved per unit of measurement will be final
and binding on the contractor.
d) Provisions, contained in sub-clause (a) to (c) above shall not, however, apply:
Where the value of alterations / additions / deletions or substitutions exceeds beyond plus
or minus 25% of the estimated contract value (i.e. quoted item rates of contractor shall
hold good for variations etc. within plus or minus 25% of estimated contract value)
B) In the event and as a result of such alternatives / additions / substitutions /
deletion, the scope of contract work exceed the value stipulated in the contract by more
than the limits given in clause (d) above, the Contractor shall claim revision of the rates
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
supported by the proper analysis in respect of such items for quantities in excess of the
above limits, notwithstanding the fact that the rates for such items exist in the tender for
the main work or can be derived in accordance with the provision of sub-clause (b) of
Clause 61 A, and the Engineer-in-Charge may revise their rates having regard to the
prevailing market rates, and the contractor shall be paid in accordance with the rates so
fixed. But, under no circumstances the contractor shall suspend / stop / slowdown the work
on the plea of non-settlement of rates of items falling under this clause.
62. ACTION WHERE NO SPECIFICATIONS ISSUED:
In case of any class of work for which there is no such specification given by the Owner in
the tender documents, such work shall be carried out in accordance with Indian Standard
Specifications and if the Indian Standard Specifications do not cover the same the work
should be carried out as per standard Engineering Practice subject to the approval of the
Engineer-in-Charge.
63. ABNORMAL RATES:
The contractor is expected to quote rate for each item after analysis of cost involved for the
completion of item/work, considering all specifications and conditions of contract. This will
avoid loss of profit or gain, in case of curtailment or change of specification for any item. In
case it is noticed that the rates for any item, quoted by the tenderer unusually are high or
unusually low it wilt be sufficient cause for the rejection of the tender unless the Owner is
convinced about the reasonableness of the rates on scrutiny of the analysis for such rate to
be furnished by the tenderer on demand.
64. INSPECTION OF WORK:
64.1 The Engineer-in-Charge will have full power and authority to inspect the works at
any time wherever in progress either on the Site or at the contractor’s premises / workshop
where situated premises /workshops of any person, firm or corporation where work in
connect with the contract may be in hand or where materials are being or are to be
supplied, and the contractor shall afford or procure for the Engineer-in-Charge every facility
and assistance to carry out such Inspection. The contractor shall at all time during the usual
working hours and at all other time for which reasonable notice of the intention of the
Engineer in-Charge or his representative to visit the works have been given to the
contractor, either himself be present to receive order and instructions or post a responsible
agent duly accredited in writing for the purpose. Orders given to the contractor’s agent
shall be considered to have the same force as if they had been given to the contractor
himself. The contractor shall give not less than seven days, notice in writing to the Engineer-
in-Charge before covering up or placing any work beyond reach of inspection and
measurement any work in order that the same may be inspected and measured. In the
event of breach of above the same shall be uncovered at contractor’s expense carrying out
such measurement or inspection.
64.2 No materials shall be dispatched by the contractor before obtaining the approval of
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Engineer-in-Charge in writing. The contractor is to provide at all times during the progress
of the work and the maintenance period, proper means of access with ladders, gangways,
etc. and the necessary attendance to move and adopt as directed for inspection or
measurement of the works by the Engine in-Charge.
65. ASSISTANCE TO THE ENGINEERS:
The contractor shall make available to the Engineer-in-Charge, free of cost necessary
instruments and assistance in checking of setting out of works and taking measurement of
66. TESTS FOR QUALITY OF WORKS:
66.1 All workmanship shall be of the respective kinds described in the contract
documents and in accordance with the instructions of the Engineer-in-Charge and shall be
subjected from time to time to such test at contractor’s cost as the Engineer-in-Charge may
direct at place of manufacture or fabrication or on the site or at all or any such places. The
contractor shall provide assistance, instruments, labour and materials as are normally
required for examining, measuring and testing any workmanship as may be selected and
required the Engineer-in-Charge.
66.2 All the tests necessary in connection with the execution of the work as decided by
Engineer-in-Charge shall be carried out at the field-testing laboratory of the Owner by
paying the charges as decided by the Owner from time to time. In case of non-availability of
test facility with the Owner, the required test shall be carried out at the cost of contractor
at government, or any other testing laboratory as directed by Engineer-in-Charge.
66.3 If any tests are required to be carried out in connection with the work or materials
workmanship not supplied by the contractor, such tests shall be carried out by the
contractor as per the instructions of Engineer-in-Charge and cost of such tests shall be
reimbursed by the Owner.
The contractor shall furnish to the Engineer-in-Charge for approval when requested or if
required by the specifications, adequate samples of all materials and finishes to be used in
the work. Such samples shall be submitted before the work is commenced and in ample
time to permit tests and examinations thereof. All materials furnished and finishing applied
in actual work shall be fully identical to the approval samples.
68. ACTION AND COMPENSATION IN CASE OF BAD WORK:
If it shall appear to the Engineer-in-Charge that any work has been executed with unsound,
imperfect or unskilled workmanship or with materials of any inferior description, or that
any materials or articles provided by the contractor for the execution of the work are
unsound or of a quality inferior to that contracted for, or otherwise not in accordance with
the contract, the contractor shall on demand in writing from the Engineer-in-Charge or his
authorised representative, specifying the work, materials or articles complained of,
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
notwithstanding that the same have been inadvertently passed, certified and paid for
forthwith shall rectify or remove and reconstruct the works specified and provide other
proper and suitable materials or articles at his own charge and cost, and in the event of
failure to do so within a period to be specified by the Engineer-in-Charge in his demand
aforesaid, the contractor shall be liable to pay compensation at the rate of one percentage
of the estimated cost of the whole work, for every week limited to a maximum of 10 per
cent of the estimated cost of the whole work, while his failure to do so shall continue and in
the case of any such failure the Engineer-in-Charge may on expiry of notice period rectify or
remove and re-execute the work or remove and replace with others, the materials or
articles complained of as the case may be at the risk and expenses of the contractors in all
respects. The decision of the Engineer-in-Charge as to any question arising under this clause
shall be final and conclusive.
69. SUSPENSION OF WORKS:
The contractor shall, if ordered in writing by the Engineer-in-Charge or his representative,
temporarily suspend the works or any part thereof for such period and such time as so
ordered and shall not, after receiving such written order, proceed with the work therein
ordered to be suspended, until he shall have received a written order to proceed therewith.
The contractor shall not be entitled to claim/ compensation for any loss or damage
sustained by him by reason of temporary suspension of the works aforesaid. An extension
of time for completion, corresponding with the delay caused by any such suspension of the
works as aforesaid will be granted to the contractor, should he apply for the same, provided
that suspension was not consequent to any default or failure on the part of the contractor.
70. OWNER MAY DO PART OF WORK:
Upon failure of the contractor to comply with any instructions given in accordance with the
provisions of the contract, the owner has the alternative right, instead of assuming charge
for entire work to place additional labour force, tools, equipments and materials on such
parts of the work, as the owner may designate or also engage another contractor to carry
out the work. In such cases, the owner shall deduct from the amount which otherwise
might become due to the contractor, the cost of such work and materials with ten percent
added to cover all departmental charges and should the total amount thereof exceed the
amount due to the contractor, the contractor shall pay the difference to the owner.
71. POSSESSION PRIOR TO COMPLETION:
The Engineer-in-Charge shall have the right to take possession of or use any completed or
partially completed work or part of the work. Such possessions or use shall not be deemed
to be an acceptance of any work completed in accordance with the contract agreement. If
such prior possession or use by the Engineer-in-Charge delays the progress of work, suitable
adjustment in the time of completion will made and contract agreement shall be deemed to
be modified accordingly.
72. PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
72.1 The contractor shall guarantee the installation/site work for a period of 06 (six)
Months from the date of completion of work, unless otherwise specified. Any damage that
may lie undiscovered at the time of issue of completion certificate, connected in any way
with the equipment or materials supplied by him or in the workmanship shall be rectified or
replaced by the contractor at his own expense as deemed necessary by the Engineer-in-
Charge or in default, the Engineer-in-Charge may cause the same made good by other
workmen and deduct expenses (for which the certificate of Engineer-in-Charge shall be
final) from any sums that may be then or at any time thereafter, become due to the
contractor or from his security deposit.
72.2 If the contractor feels that any variation in work or in quality of materials or
proportions would be beneficial or necessary to fulfill the guarantee called for, he shall
bring this to the notice of the Engineer-in-Charge in writing. The work will not be considered
as complete and taken over by the Owner until all the temporary works etc., constructed by
the contractor is removed and work site cleaned to the satisfaction of Engineer-in-Charge.
72.3 Care of Works:
From the commencement to completion of works, the contractor shall take full
responsibility for the care of all works including all temporary works, and in case any
damage, loss or injury happens to the works or to any part thereof or to any temporary
work, from any cause whatsoever, he shall at own cost repair and make good the same, so
that at completion, the work shall be in good order and in conformity in every respect with
the requirements of the contract and the Engineer-in-Charge’s instructions.
72.4 Effects prior to taking over:
If at any time, before the work is taken over, the Engineer-in-Charge shall
a) Decide that any work done or materials used by the contractor or any sub-
contractor is defective or not in accordance with the contract or that the works or any
portion thereof are defective or do not fulfill the requirements of contract (all such matters
being herein after called ‘Defects’ in this clause) and
b) As soon as reasonably practicable, notice given to the contractor in writing of the
said decisions specifying
Particulars of the defects alleged to exist or to have occurred, then the contractor shall at
his own expenses and with all speed make good the defects so specified.
In the case contractor shall fail to do so, the Owner may take, at the cost of the contractor,
such steps as may in all circumstances, be reasonable to make good such defects. The
expenditure, so incurred by the Owner shall be recovered from the amount due to the
contractor. The decision of the Engineer-in-Charge with regard to the amount be recovered
from the contractor will be final and binding on the contractor. As soon as the works have
been completed in accordance with the contract (except in minor respects that do not
affect their use for the purpose for which they are intended and except for maintenance
thereof provided in clause 72.1) and have passed the tests on completion, the Engineer-in-
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Charge shall issue a certificate (hereinafter called completion certificate) in which he shall
certify the date on which the work have been so completed and have passed the said tests
and the Owner shall be deemed to have taken over the works on the date so certified. If the
works have been divided into various groups in the contract, the Owner shall be entitled to
take over any group or groups before the other or others and thereupon the Engineer-in-
Charge shall issue a completion certificate which will however, be for such group or groups
as taken over only.
72.5 Defects after taking over:
In order that the contractor could obtain a completion certificate, he shall make good with
all possible speed, any defect arising from the defective materials supplied by the
Contractor or workmanship or any act of omission of the contract that may have been
noticed or developed after the works or group of the works has been taken over. The
period allowed for carrying out such work will be normally one month. If any defect be not
remedied within a reasonable time, the Owner may proceed to do the work at the
contractor’s risk and expense and deduct from the final bill such amount as may be decided
by the Owner. If by reason of any default on the part of the contractor a completion
certificate has not been issued in respect of every portion of the work within one month
after the date fixed by the contract for the completion of the works, the Owner shall be at
his liberty to use the works or any portion thereof in respect of which a completion
certificate has been issued provided that the works or the portion thereof so used as
aforesaid shall be afforded reasonable opportunity for completing these works for the issue
of completion certificate.
72.6 The Security Deposit/retention money deducted / furnished as per clause 18 of GCC
shall be retained for the period of liability as given in clause 72.1 above. This Retention
amount or Bank Guarantee furnished against Security Deposit/retention money shall be
released only on expiry of the period of liability and also based on the certification of the
Engineer-in-charge that no defect/damage has been reported / observed during the
stipulated period of liability for the contract.
72.7 Performance of contractor shall be evaluated on each job by Engineer-in-Charge and
recorded. Review of performance will be carried out at appropriate intervals by BPCL.
BILLS / MEASUREMENT / PAYMENT
73. SCHEDULE OF RATES AND PAYMENTS:
i) Contractor’s Remuneration
The price to be paid by the Owner to contractor for the whole of the work to be done and
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
the performance of all the obligations undertaken by the contractor under the contract
documents shall be ascertained by the application of the respective item rates (the inclusive
nature of which is more particularly defined by way of application but not of limitation, with
the succeeding sub-clause of this clause) and payment to be made accordingly for the work
actually executed and approved by the Engineer-in-Charge. The sum so ascertained shall
(excepting only as and to the extent expressly provided herein) constitute the sole and
inclusive remuneration of the contractor under the contract and no further payment
whatsoever shall be or become due or payable to the contractor under the contract.
ii) Schedule of rates to be inclusive:
The prices/rates quoted by the contractor shall remain firm till the issue of final completion
certificate and shall not be subject to escalation. Schedule of rates shall be deemed to
include and cover all costs, expense and liabilities of every description and all risk of every
kind to be taken in executing, completing and handing over the work to the Owner by the
Contractor. The Contractor shall be deemed to have known the nature, scope, magnitude
and the extent of the works and materials required, though the contract document may not
fully and precisely furnish them. He shall make such provision in the item rates as he may
consider necessary to cover the cost of such items of work and materials as may be
reasonable and necessary to complete the works. The opinion of the Engineer-in-Charge as
to the items of work which are necessary and reasonable for completion of work shall be
final and binding on the contractor, although the same may not be shown on or described
specially in contract documents.
Generality of this present provision shall not be deemed to cut down or limit in any way
because in certain cases it may and in other cases it may not be expressly stated that the
contractor shall do or perform a work or supply articles or perform services at his own cost
or without addition of payment or without extra charges or words to the same effect or
that it may be stated or not stated that the same are included in and covered by the
schedule of rates.
iii) Schedule of Rates to Cover Constructional Equipments, Materials, Labour etc.
Without in any way limiting the provisions of the preceding sub-clause the schedule of rates
shall be deemed to include and cover the cost of all constructional equipment, temporary
work (except as provided for herein), pumps, materials, labour, the insurance, fuel, stores
and appliances to be supplied by the contractor and other matters in connection with each
item in the schedule of rates and the execution of the works or any portion thereof,
finished, complete in every respect and maintained as shown or described in the contract
documents or may be ordered in writing during the continuance of this contract.
iv) Schedule of Rates to cover Royalties, Rents and Claims:
The Schedule of Rates shall be deemed to include and cover the cost of all royalties and fees
for the articles and processes, protected by letters, or otherwise incorporated in or used in
connection with the works, also all royalties, rents and other payments in connection with
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
obtaining materials of whatsoever kind for the works and shall include an indemnity to the
Owner which the contractor hereby gives against all actions, proceedings, claims damages,
costs and expenses arising from the incorporation in or use on the works of a such articles,
processes or materials, Octroi or other municipal or local Board charges levied on materials,
equipment or machineries to be brought to site for use on work shall be borne by the
v) Schedule of Rates to Cover Taxes and Duties:
No claim or exemption or reduction of customs duties, excise duties, sales tax, quarry or
any port dues, transport charges, stamp duties or Central or States Government or Local
Body or Municipal Taxes or duties, taxes or charges (from or of any other body),
whatsoever, will be granted or obtained, all of which expenses shall be deemed to be
included in and covered by the Schedule of Rates. Contractor shall also obtain and pay for
all permits, or other privileges necessary to complete work.
vi) Schedule of Rates to cover Risk of Delay:
The schedule of Rates shall be deemed to include and cover the risk of all possibilities of
delay and interference with the contractors conduct of work which occur from any cause
including orders of owner in the exercises of his powers and on account of extension of
time granted due to various reasons and for all other possible or probable cause of delay.
vii)Schedule of Rates cannot be altered:
For work under unit rate basis, no alteration will be allowed in the schedule of Rates by
reason of work or any part of them being modified, altered, extended, diminished or
omitted. The schedule of Rates are fully Inclusive rates which have been fixed by the
contractor and agreed to the Owner and cannot be altered.
For lumpsum contract, the payment will be made according to the work actually carried out
for which purpose an item wise or workwise, Schedule of rates shall be furnished, suitable
for evaluating the value of work done and preparing running account bills.
74. PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS: i)
All measurements shall be in metric system. All the works in progress will be jointly
measured by the representative of the Engineer-in-Charge and the Contractor’s authorise
agent progressively. Such measurement will be got recorded in the measurement book by
the Engineer-in-Charge or his authorised representative and signed in token of accepted by
the contractor or his authorised representative.
For the purpose of taking joint measurement the contractor’s representative shall be bound
to be present whenever required by the Engineer-in-Charge. If, however, he absents for any
reason whatsoever the measurement will be taken by the Engineer-in-Charge or his
representative and this will be deemed to be correct and binding on the contractor.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
The contractor will submit a bill to the Engineer-in-Charge of the work giving abstract and
detailed measurements for the various items executed during a month, before the expiry of
the 1st week of the succeeding month. The Engineer-in-Charge shall take or cause to be
taken the requisite measurements for the purpose of having the same verified and the
claim, as far as admissible, adjusted, if possible, before the expiry of 10 days from
presentation of the bill.
iii) Dispute in Mode of Measurements:
In case of any dispute as to the mode of measurement not covered by the contract to be
adopted for any item of work, mode of measurement as per latest Indian Standard
Specifications shall be followed.
75. LUMPSUMS IN TENDER:
For the items in tender where it includes lumpsum in respect of parts of work, the
contractor shall be entitled to payment in respect of the items at the same rates as are
payable under this contract for such items, or if part of the work in question is not In the
opinion of the Engineer-in-Charge capable of measurement of determination, the owner
may at his discretion pay the lumpsum amount entered In the tender or a percentage
thereof and the certificate In writing of the Engineer-in-Charge shall be final and conclusive
against the contractor with regards to any sum or sums payable to him under the provisions
76. RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES:
All running account payments shall be regarded as payment by way of advance against the
final payment only and not as payments for work actually done and completed and shall not
preclude the requiring of bad, unsound and imperfect, or unskilled work to be removed and
taken away and reconstructed or re-erected or be considered as an admission of the due
performance of the contract, or any part thereof in this respect, or of the accruing of any
claim by the contractor, nor shall it conclude, determine or affect in any way the powers of
the Owner under these conditions or any of them as to the final settlement and the
adjustments of the accounts or otherwise, or in any other way vary or affect the contract.
The final bill shall be submitted by the contractor within one month of the date of physical
completion of the work, and settled immediately but not later than 60 days otherwise the
Engineer-in charge’s certificate of the measurement and of total amount payable for the
work accordingly shall be final and binding on all parties. The final bill shall be presented by
the contractor along with ‘No claim certificate’ in a format acceptable to the owner or such
other documents as directed by the owner.
77. EXTRA WORK:
Should the contractor consider that he is entitled to any extra payment for extra job carried
out whatsoever in respect of the works, he shall forthwith give notice in writing to the
Engineer-in-Charge that he claims extra payment for the extra work. Such notice shall be
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
given to the Engineer-in-Charge within one week from the ordering of any extra work or
happening of any event, upon which the contractor bases such claims, and such notice shall
contain full particulars of the nature of such claim with full details and amount claimed.
Failure on part of the contractor to put forward any claim with the necessary particulars as
above within the time above specified
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
shall be an absolute waiver thereof. No omission by the owner to reject any such claim and
no delay in dealing therewith shall be waiver by the owner of any rights in respect thereof.
78. PAYMENT OF CONTRACTOR’S BILL:
Generally no payment shall be made for works estimated to cost less than Rs. 50,000/- till
the whole of the work shall have been completed. But in case of works estimate to cost
more than Rs. 50,000/- the contractor on submitting the bill thereof be entitled to receive a
monthly payment proportion to the part thereof approved and passed by the Engineer-in-
Charge, whose certificate of such approval and passing of the sum so payable shall be final
and conclusive against the contractor. This payment will be made after making necessary
deductions as stipulated elsewhere in the contract document for materials, security deposit
or any moneys due to the Owner etc.
79. MODE OF PAYMENT:
Payment will be made to the contractor normally through NEFT mode.
80. COMPLETION CERTIFICATE:
80.1 Application for Completion Certificate:
When the contractor fulfills his obligation under clause 72.4, he shall be eligible to apply for
completion certificate. The contractor may apply for separate completion certificate respect
of each such portion of the work by submitting the completion documents along with such
application for completion certificate.
The Engineer-in-Charge shall normally issue to the contractor the completion certificate
within one month after receiving an application therefore from the contractor after
verifying from the completion documents and satisfying himself that the work has been
completed in accordance with and as set out in the construction and erection drawings and
the contract documents.
The contractor, after obtaining the completion certificate is eligible to present the final bill
for the work executed by him under the terms of contract.
80.2 Completion Certificate:
The contractor shall be furnished with a certificate by the Engineer-in-Charge of such
completion, but no certificate shall be given nor shall the work be deemed to have been
executed until all scaffolding surplus materials and rubbish is cleared off the site completely
or until the work shall have been measured by the Engineer-in-Charge whose measurement
shall be binding and conclusive. The work will not be considered complete and taken over
by the Owner, until all the temporary works, labour and staff colonies etc. constructed are
removed and the work site cleaned of all debris etc., as described in clause in 80.3 below
and to the satisfaction of the Engineer-in-Charge.
If the contractor shall fail to comply with the requirements of this clause on or before the
date fixed for the completion of the work, the Engineer-in-Charge may at the expenses of
the contractor remove such scaffolding, surplus materials and rubbish and dispose off the
same as he thinks fit and clean off such dirt as aforesaid, and the contractor shall forthwith
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
pay the amount of all expenses so incurred and shall have no claim in respect of any such
scaffolding or surplus materials as aforesaid except for any sum actually realised by the sale
80.3 Clearing the site:
Cart away all debris generated from the work and dispose it off without giving rise to any
complaints from local, municipal or government authorities. Metal scraps or any other
scrap including wooden packing materials shall be disposed as instructed by the Engineer-
in-Charge or as follows:
a) All unused scrap steel bar/ structural steel sections/pipe materials etc., (Free
issue by owner) shall be the property of the owner and the same shall be returned by the
contractor category-wise at their own cost to Owner’s store. The weighment slip issued by
the Warehouse (in original) is required to be attached along with the final bill/ material
reconciliation statement. In case, the material is supplied by the contractor, as per their
scope of work, the scrap material generated out of the same should be taken out at their
own cost before the settlement of the final bill.
b) Insulation material (either issued by owner to the contractor or supplied by
contractor) shall be kept in the area allocated by owner. During the insulation activities, the
contractor should keep the work area clean on day-to-day basis. On completion of
insulation job, all debris/packing should be taken out to the designated location or as
directed by the Engineer in charge for disposal at their own cost before the settlement of
the final bill.
80.4. The financial implication of above, if any, should be taken care of in the quoted
rates; and no separate claim shall be entertained on this account. The final bill of the
contractor shall be linked with the area cleaning in all respects, including removal of
shuttering material, disposal of debris/scrap etc. to the entire satisfaction of Engineer-in-
81. FINAL DECISION AND FINAL CERTIFICATE:
Upon Expiry of the period of liability and subject to the Engineer-in-Charge being satisfied
that the works have been duly maintained by the contractor during monsoon or such period
as herein before provided in clause 72 and that the contractor has in all respect duly made
up any subsidence and performed all his obligations under the contract, the Engineer-in-
Charge shall (without prejudice to the rights of the Owner to retain the provisions of
relevant clause hereof) give a certificate herein referred to as the final certificate to that
effect. The contractor shall not be considered to have fulfilled the whole of his obligations
under the contract until Final Certificate have been given by the Engineer-in-Charge
notwithstanding any previous entry upon the work and taking possession, working or using
of the same or any part thereof by the owner.
82. CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION:
Except the final certificate, no other certificate or payments against a certificate or on
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
general account shall be taken to be an admission by the Owner of the due performance of
the contract or any part thereof or occupancy or validity of any claim by the contractor.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
TAXES/DUTIES/INSURANCE
83. TAXES, DUTIES, OCTROI ETC.:
The contractor agrees to and does hereby accept full and exclusive liability for the payment of any
and all taxes, duties, octroi etc. now in force or hereafter Imposed, increased or modified, from
time to time in respect of work and materials and all contributions and taxes for unemployment
compensation, insurance and old age pensions or annuities now or hereafter imposed by any
Central or State Government authorities which are imposed with respect to or covered by the
wages, salaries, or other compensations paid to the persons employed by the contractor and the
contractor shall be responsible for the compliance with all obligations and restrictions imposed by
the Labour Law or any other law affecting employer - employee relationship and the contractor
further agrees to comply and secure the compliance by all sub-contractors, with all applicable
Central, State, Municipal and local laws and regulations and requirements of any Central, State or
Local Government agency or authority. Contractor further agrees to defend, indemnify and hold
harmless from any liability or penalty which may be Imposed by the Central, State of Local
Authority by reason of any violation by contractor or sub-contractor of such laws, regulations or
requirements and also from all claims, suits or proceeding that may be brought against the Owner
arising under, growing out of, or by reason of the work provided for by this contract by third
parties, or by Central or State Government authority or any administrative sub-division thereof.
Contractor shall at his own expenses carry and maintain insurance with reputable insurance
companies to the satisfaction of the Owner as follows:
i) Employees State Insurance Act:
The Contractor agrees to and does hereby accept full and exclusive liability for the compliance with
all obligations imposed by the Employees State Insurance Act, 1948, and the contractor further
agrees to defend, indemnify and hold Owner harmless from any liability or penalty which may be
imposed by the Central, State or Local Authority by reason of any asserted violation by contractor
or sub-contractor, of the Employee State Act, 1948 and also from all claims suits or proceedings
that may be brought against the Owner arising under, growing out of or by reason of the work
provided for by this contract whether brought by employees of the contractor, by third parties or
by Central or State Government authority or any political sub-division thereof.
The contractor agrees to filing, with the Employees State Insurance Corporation, the Declaration
Forms and all forms which may be required in respect of the contractor’s or sub-contractor’s
employees whose aggregate remuneration as fixed by the concerned authorities and who are
employed in the work provided for or those covered by ESI Act under any amendment to the Act
from time to time. The contractor shall deduct and secure the agreement of the sub-contractor to
deduct the employee’s contribution as per the first schedule of the Employee State Insurance Act
from wages and affix the Employee’s contribution Cards at Wages payment intervals. The
contractor shall remit and secure the agreement of the sub-contractor to remit to the authorized
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
bank, Employee’s State Insurance Corporation Account, the Employee’s contribution as required by
the Act. The contractor agrees to maintain all Cards and records as required under the Act in
respect of employees and the payments and the contractor shall secure the agreement of the
subcontractor to maintain such records. Any expenses incurred for the contribution, making
contribution or maintaining records shall be to the contractor’s or sub-contractor’s account.
The Owner shall retain such sum as may necessary, from the total contract value until contractor
shall furnish satisfactory proof that all contributions as required by the Employees State Insurance
Act, 1948, have been paid.
ii) Workman’s Compensation and Employee’s Liability Insurance:
Insurance shall be effected for all the Contractor’s employees engaged in the performs of this
contract, if any of the work is sublet, the contractor shall require the sub-contractor to provide
workman’s compensation and employer’s liability Insurance for the latter’s employees if such
employees are not covered under the contractors insurance.
iii) Any other Insurance Required Under Law or Regulations or by Owner:
Owner shall cover Project Material and Equipments under and over all Marine-cum-Erection
Insurance Policy. Contractor shall carry and maintain any and all other insurance which be required
under any law or regulation from time to time. He shall also carry and main any other insurance
which may be required by the Owner.
iv) Automobile Liability Insurance:
Contractor shall take out an Automobile Liability Insurance to cover all risks to Owner for each of
his vehicles plying on works of this contract and these insurance shall be valid for the total contract
period. No extra payments will be made for this insurance. Owner shall not be liable for any
damage or loss not made good by the insurance company, should such damage or toss result from
unauthorised use of the vehicle.
85. DAMAGE TO PROPERTY:
i) Contractor shall be responsible for making good, to the satisfaction of the Owner
any loss of and any damage to all structures and properties belonging to the Owner or being
executed or procured or being procured by the Owner or of other agencies within the premise all
the work of the Owner, if such loss or damage is due to fault and/or the negligence willful acts or
omission of contractor, his employees, agents, representative or \ sub-contractor.
ii) The contractor shall indemnify and keep the Owner harmless of all claims for
damage to property other than Owner’s property arising under or by reason of this agreement if
such claims results from the fault and/or negligence or willful acts or omission of contractor, his
employees, agents, representatives or sub-contractors.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
LABOUR LAWS AND OTHER REGULATIONS
86. LABOUR LAWS:
i) No labour below the age of eighteen years shall be employed on the work.
ii) The contractor shall not pay less than what is provided under the Minimum Wages
Act for the applicable trade or category of workman to the worker engaged by him on the work and
also ensure that any sub-contractors engaged by him also pay not below the applicable minimum
wages under the Act and hold the company, indemnified in respect of any claims that may arise in
respect or non-compliance with this requirements.
iii) The contractor shall observe all the formalities required under the provisions of the
contract labour (Regulation and abolition) Act 1970 and the rules made thereunder and as may be
amended from time to time. He shall pay the required deposit under the Act Appropriate to the
number of workmen to be employed by him or through sub-contractor and get him self registered
under the Act. He shall produce the certificate of registration granted by the Govt. authority under
the Act to the company before commencement of work. The company recognises only the
contractor and not his sub-contractors under the provisions of the Act. The contractor will have to
submit daily a list of his employees, who will be entering the Company’s premises for the work
awarded. He will also keep his wage register available at all times as close to the work site as
possible and produce the same for inspection whenever required by designated Company officials.
If the company so desires, a deposit may be taken from the Contractor to be refunded only after
the Company is satisfied that all the workmen employed by the contractor have been fully paid for
the period of work in Company’s premises at least at rates equal to or better than wages provided
for under the Minimum Wages Act.
iv) The Contractor will comply with the provisions of the employee’s Provident Fund Act
and the Family Pension Fund Act as may be applicable and as amended from time to time.
Contractor shall obtain their own provident fund account number. Offer of the contractor who
does not have provident fund account will be liable for rejection.
v) The Contractor will comply with the provisions of the Payment of Gratuity Act
as may be applicable and as amended from time to time.
87. IMPLEMENTATION OF APPRENTICES ACT 1961:
The Contractor shall comply with provisions of the Apprentices Act 1961 and the Rules/orders
issued thereunder from time to time. If he fails to do so, his failure will be breach of the contract
and the Engineer-in-Charge may, at his discretion, cancel the contract. The contractor shall also be
liable for any pecuniary liability arising on account of any violation by him of the provision of the
88. CONTRACTOR TO INDEMNIFY THE OWNER:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
i) The contractor shall indemnity the owner and every member, officer and employee
of the Owner, also the Engineer-in-Charge and his staff against all actions, proceedings, claims,
demands, costs, and expenses whatsoever arising out of or in connection with the matters referred
to in clause 84 and all actions/ proceedings, claims, demands, costs and expenses which may be
made against the Owner for or in respect of or arising out of any failure by the contractor in the
performance of his obligations under the contract documents. The Owner shall not be liable for or
in respect of any demand or compensation payable by law in respect of or in consequence of any
accident or injury to any workmen or other person in the employment of the contractor or his sub-
contractor and contractor shall indemnify and keep indemnified the Owner against all such
damages and compensations and against all claims, damage, proceedings, costs, charges and
expenses whatsoever, thereof or in relation thereto.
ii) Payment of Claims and Damages:
Should the Owner have to pay any money in respect of such claims or demands as aforesaid the
amount so paid and the costs incurred by the Owner shall be charged to and paid the Contractor
and the contractor shall not be at liberty to dispute or question the rig of the Owner to make such
payments notwithstanding the same may have been made without his consent or authority or in
law or otherwise to the country.
In every case to which by virtue of the provisions of Section 12, sub-section (I) of workmen’s
compensation Act 1923 or other applicable provisions of workmen’s Compensation Act any other
Act, the Owner is obliged to pay compensation to a workmen employed by contractor in execution
of the works, the Owner will recover from the contractor the amount of compensation so paid and
without prejudice to the rights of Owner under Section 12 sub-section (2) of the said Act. Owner
shall be at liberty to recover such amount or any part thereof by deducting it from the security
deposit or from any sum due to the contractor whether under the contract or otherwise. The
Owner shall not be bound to contest any clime made under Section 12, sub-section (I) of the said
Act except on the written request of contractor and upon his giving to the Owner full security for all
costs for which the Owner might become liable on consequence of contesting such claims.
iii) Employment Liability:
a) The contractor shall be solely and exclusively responsible for engaging or
employing persons for the execution of work. All employees engaged by the contractor shall be on
his/ their payroll and paid by him/ them. All disputes or differences between the contractor and
his/ their employees shall be settled by him/ them. Owner has absolutely no liability whatsoever
concerning the employees of the contractor. The contractor shall indemnify owner against all loss
or damage or liability arising out of or in the course of his/ their employees. The contractor shall
make regular and full payment of wages without giving any complaint by any employee of the
contractor or his sub-contractor regarding non-payment of wages/ salaries or other dues. Owner
reserves the right to make such payments directly, to such employee or sub-contractor of the
contractor and recover the amount in full from the bills of Contractor, and the contractor shall not
claim any compensation or reimbursement thereof. The Contractor shall comply with the Minimum
Wages Act applicable to the area with regard to payment of wages of his employees and also of
employees of his sub-contractor.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
b) The Contractor shall advise in writing to all of his employees and the
employees of his sub-contractor as follows:
It is fully understood that your appointment and/ or deployment is only in connection with the
owner and it does not give you any right of claim for employment by owner.
89. HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS:
In respect of all labour directly employed in the works for performance of the contractor’s par this
agreement, the contractor shall comply with or cause to be complied with all the rules and
regulations of the local sanitary and other authorities or as framed by the Owner from time to time
for the protection of health and sanitary arrangements for all workers.
90. SAFETY REGULATIONS:
i) In respect of all labour, directly or indirectly employed In the work for the
performance of contractor’s part of this agreement, the contractor shall at his own expenses
arrange for all safety provisions as per safety codes of C.P.W.D. Indian Standard Institution, the
Electricity Act, The Mines Act and any such other acts as applicable.
ii) The Contractor shall ensure that he, his sub-contractor and his, or their personnel or
representatives shall comply with all Fire / Safety regulations issued from time to time by the
Company or otherwise howsoever and should any injury resulting in death or not or loss / or
damage due to Fire to any property or a portion thereof, occurred as a result of failure to comply
with such regulations, the contractor shall be held responsible for the consequences thereof and
shall keep the company harmless and indemnified.
91. ARBITRATION:
a) Any dispute or difference of any nature whatsoever, any claim, cross-claim, counter-
claim or set off of BPCL against the Contractor or regarding any right, liability, act, omission on
account of any of the parties hereto arising out of or in relation to this agreement shall be referred
to the sole Arbitration of the concerned Director (herein after named as Director) of the BPCL or of
some officer of the BPCL who may be nominated by the concerned Director. The Contractor will
not be entitled to raise any objection to any such arbitrator on the ground that the arbitrator is an
Officer of the BPCL or that he has dealt with the matters to which the contract relates or that in the
course of his duties as an Officer of the BPCL he had expressed views on all or any other matters in
dispute or difference. In the event of the arbitrator to whom the matter is originally referred being
transferred or vacating his office or being unable to act for any reason, the Director as aforesaid at
the time of such transfer, vacation of office Or inability to act may in the discretion of the Director
designate another person to act as arbitrator in accordance with the terms of the agreement to the
end and intent that the original Arbitrator shall be entitled to continue the arbitration proceedings
not withstanding his transfer or vacation or office as an Officer of the BPCL if the Director does not
designate another person to act as arbitrator on such transfer, vacation of office or inability of
original arbitrator. Such persons shall be entitled to proceed with the reference from the point at
which it was left by his predecessor. It is also a term of this contract that no person other than the
Director or a person nominated by such Director of the BPCL as aforesaid shall act as arbitrator,
hereunder. The award of the arbitrator so appointed shall be final conclusive and binding on all
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
parties to the agreement subject to the provisions of the Arbitration and Conciliation Act, 1996 or
any statutory modification or re-enactment thereof and the rules made thereunder for the time
being in force shall apply to the arbitration proceedings under this clause.
b) The arbitrator shall have power to order and direct either of the parties to abide by,
observe and perform all such directions as the arbitrator may think fit having regard to the matters
in difference i.e. dispute before him. The arbitrator shall have all summary powers and may take
such evidence oral and/ or documentary, as the arbitrator in his absolute discretion thinks fit and
shall be entitled to exercise all powers under the Arbitration and Conciliation Act, 1996 including
admission of any affidavit as evidence concerning the matter in difference i.e. dispute before him.
c) The parties against whom the arbitration proceedings have been initiated, that is to
say the Respondents in the proceedings, shall be entitled to prefer a cross-claim, counter-claim or
set off before the Arbitrator in respect of any matter an issue arising out of or in relation to the
Agreement, without seeking a formal reference of arbitration to the Director for such counter-
claim, cross or set off and the Arbitrator shall be entitled to consider and deal with the same as if
the matters arising therefrom has been referred to him originally, and deemed to form part of the
reference made by the Director.
d) The arbitrator shall be at liberty to appoint, if necessary, any accountant or
engineering or other technical person to assist him and to act by the opinion so taken.
e) The arbitrator shall have power to make one or more awards whether interim or
otherwise, in respect of the dispute and difference and in particular will be entitled to make
separate awards in respect of claims or cross-claims of the parties.
f) The arbitrator shall be entitled to direct any one of the parties to pay the costs of
the other party in such manner and to such extent as the arbitrator may in his discretion determine
and shall also be entitled to require one or both the parties to deposit funds in such proportion to
meet the arbitrators’ expenses whenever called upon to do so.
g) The parties hereby agree that the courts in the city of Mumbai/(Ernakulam-in the
case of Kochi Refinery), alone shall have jurisdiction to entertain any application or other
proceedings in respect of anything arising under this agreement and any award or awards made by
the Sole Arbitrator hereunder shall be filed in the concerned courts in the city of
Mumbai/(Ernakulam-in the case of Kochi Refinery), only.
92. JURISDICTION:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to
the jurisdiction of the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the
purpose of actions and proceedings arising out of the contract and the courts at
Mumbai/(Ernakulam-in the case of Kochi Refinery), only will have jurisdiction to hear and decide
such actions and proceedings.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
MEMORANDUM OF AGREEMENT
An agreement made this ___________day __________of ____________20___ between BHARAT
PETROLEUM CORPORATION LIMITED a Company Incorporated in India and having its registered
office at Ballard Estate, Mumbai, (herein after referred to as ‘the Company’ which expression shall
include its heirs, legal representatives, successors and permitted assignees) of the one part, and
(herein after referred to as “The Contractor” which expression shall include its heirs, legal
representatives, successors and permitted assignees) of the other part, whereby it is agreed:-
1. The Contractor shall carry out and complete the work as mentioned in the Purchase
order/Contract No._________________ dated ______________, (hereinafter referred to as “the
work”) for the Company at its specified site to its complete satisfaction in accordance with the
specifications, schedule of rates and plans attached as per Purchase order/Contract and with the
instructions given from time to time, by the Company’s authorized engineer under whose
supervision the work shall be-executed. The parties hereto agree that this agreement shall be
effective from the date of the aforesaid Purchase Order/Contract.
2. Inspection of site: The Contractor has been given an opportunity before or at the time of
the entrusting of the work to him of making an inspection of the site to set at rest any doubt he
may have had about the difficulties attending his offer, and any difficulties which may be met with
by him in the course of the execution of the work shall neither relieve him from fulfilling the terms
of this Agreement, nor entitled him to claim extra payment or an extension of the period stipulated
for the completion of the work, except where it will be agreed by the Company’s authorized
Engineer that such difficulties could not have been foreseen.
3. Supply of Labour and Materials: The Contractor shall furnish all labour, materials,
equipment or tools necessary for the construction of the work, except such materials, equipment
or tools as will be supplied by the Company and are detailed in Purchase order/Contract. The
contractor will assume full responsibility for the protection and safety of the work during its
construction. The details and dimensions shown on the said plans referred to in the Purchase
order/Contract shall be strictly adhered to by the contractor and no alterations shall be made
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
therein unless previous sanction thereto has been given in writing by the Company.
(a) The Contractor shall prepare detailed and shop drawings and any other data
(b) All materials supplied by the Contractor shall be of the best quality. The Contractor
shall at his own cost arrange for and/or carry out any test of materials, which the Company’s
authorized Engineer may require.
(c) The Contractor shall at the request of the Company’s authorized Engineer
immediately dismiss from the work any person employed thereon who, in the opinion of the
Company’s authorized Engineer, is unsuitable or incompetent or who, has been guilty of
misconduct, and such person shall not again be employed or allowed on the works without the
permission of the Company, in writing.
4. E. & O. E. No advantage is to be taken either by the Company or the Contractor of any
clerical error or mistake, which may occur in the specification, schedule of rates, plans, tender or
any other papers supplied to or by the contractor in connection with the work.
5. Damage on account of Incomplete work: The Contractor shall commence the work and shall
complete the work as mentioned in Purchase order/Contract failing which the Contractor shall pay
or allow to the Company to recover as liquidated damages, at the rate of minimum 0.5% per week
of delay or part there of up to a maximum of 5% of the total contract value, if Liquidated damages
clause is made applicable in the contract. Such damages may be deducted by the Company from
any amount due to the contractor; otherwise they shall be recoverable by lawful means.
6. a) Determination of the Agreement: The company shall, at any time, be entitled to
determine and terminate the contract, if in the opinion of the company, the cessation of the work
becomes necessary owing to paucity of funds or for any other cause whatsoever. On such
determination / termination, the cost of approved materials, brought by the contractor and lying at
the site, at current market rates as verified and approved by company’s engineer and of the value
of the work done to date by the contractor shall be paid for in full at the rate specified in the
contract. A notice in writing from the company to the contractor of such determination and
termination and reasons therefore shall be the conclusive proof of the fact that the contract has
been so determined and terminated by the company.
Should the contract be determined as above and the contractor claims payment to compensate
expenditure incurred by him in the expectation of completing the work, the company shall consider
and admit such claim as are deemed fair and reasonable and are supported by the vouchers to
satisfaction of the engineer-in-charge. The company’s decision on the necessity and propriety of
such expenditure shall be final and conclusive and binding on the contractor.
The contractor shall not be entitled to get any possible loss of profit that he could have earned had
the contract been not determined / terminated under the above clauses of this article.
7. Termination/Offloading: The contractor fully understands that timely completion of the
work as per the schedule is of paramount necessity as otherwise it would lead to adversely
affecting the schedules of other works/project with resultant financial and other losses to the
Company. In view of this, the contractor unconditionally agrees and binds himself to be liable for all
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
the consequences for non-completion of the work within the stipulated time.
In case a situation is brought about by the contractor warranting termination/off-loading of the
whole or any part of the work for any reason whatsoever, the Company shall have the liberty and
right to entrust/engage/award the work so terminated off loaded at the risk and cost of the
contractor to any other agency/contractor by adopting any mode of inviting tenders, i.e.
open/limited/single party/negotiation basis etc. in order to ensure completion of the work as per
the schedule or at the quickest possible time.
8. Defective Work / Materials: If the work done by the Contractor or any part there of shall be
found defective in workmanship or by reason of bad or inferior materials used, then in such case he
shall at his own risk and cost without delay, demolish all such defective work and rebuild or replace
the same in a satisfactory manner. The Company may, if necessary, at the cost and risk of the
Contractor, temporarily stop all other activities by the Contractor in connection with the work until
such time as the defective work has been rebuilt or replaced at the Contractor’s cost. In case of
default on the part of the contractor to remove defectives work and rebuild or replace the same
without delay and in a manner satisfactory to the Company, the Company shall be entitled to
employ another Contractor or its own workman to carry out the removal and rebuilding or
replacing at the risk and cost of the contractor.
9. Substitution of Contractor : If the Company finds it necessary to employ a person or persons
for the purposes provided in clauses 6 (b) and 7 above, then the Company may deduct and retain
from out of the sums due to the contractor all such amounts as they may require to pay or to
reimburse themselves there from in respect of the costs and expenses which they have incurred in
completing the work and or in removing defective work and rebuilding or replacing the same in a
manner satisfactory to the Company and if such amounts be more than the sums due or thereafter
becoming due to the Contractor, than the balance, shall be a debt recoverable from the Contractor
by the Company. The Contractor shall not in any manner do or cause to be done any act, matter or
things whatsoever to prevent the person or persons so employed by the Company from removing
defective work and re-building or replacing the same in a manner satisfactory to the Company
and/or from, completing the work in the manner aforesaid.
10. Removal of Material: On the Determination of the Agreement as referred to in Clause 6, the
Contractor shall at his own risk and cost remove from site within Seven days all his materials,
equipment and tools. It is agreed that in case of such determination the company shall be entitled
to purchase from the Contractor such materials as will be approved by the Authorized Engineer of
the Company at the prices then current. If the Contractor does not remove the other materials,
equipment and tools which he has been asked to remove within the time prescribed as aforesaid,
the Company may remove and sell the same holding the proceeds less the cost of storage, removal
and sale to the credit of the Contractor. Should Company incur any loss in respect of the sale, it
shall be entitled to recover same from the Contractor.
11. Inspection of work: Inspection will be made periodically during the progress of the work by
the authorized Engineer of the Company and all work performed must be of acceptable quality of
which the said Engineer-in-Charge will be the sole judge.
12. Supervision: The Contractor shall during the whole time the work is in progress, employ one
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
or more competent and technical English speaking Supervisors acceptable to the Company’s
authorized Engineer, one of whom at least shall be in constant attendance at the site while persons
are at work there. Any directions, explanations, instructions, or notices in connection with the work
given by the Company’s authorized Engineer to these Supervisors shall be deemed to have been
given to the Contractor.
13. Payment: The Company, in consideration of the contractor carrying out and completing the
said work at the Company’s said site, to the satisfaction of the Company, shall pay the contractor as
per the said schedule of Rates, subject to deductions, retentions and abatements, if any to be
made therefrom in accordance with the provisions of this Agreement. During the progress of the
work and provided the work is progressing according to the time-table laid down to the contractor,
the contractor shall be entitled once a month to receive advance payment on the above mentioned
sum proportionate to such part of the work as shall have been executed during the preceding
month but only after such part of the work as has been executed has been inspected and approved
by the Company’s authorized Engineer. From such interim payments each time 10% will be
withheld as Security deposit and this 10% will be paid to the Contractor after the defect liability
period, provided that any defects appearing during that period are corrected by him.
100% payment will be made on the basis of actual executed quantities after satisfactory
completion and due certification by BPCL Engineer-in-charge. In lieu of 10% Retention money
towards Security deposit, contractor shall submit bank guarantee of equivalent amount of
retention money (10% of contract value) before submission of 1st Running Account (RA) bill valid
for defects liability period specified. Further, the Bank Guarantee shall have a claim period of six
months beyond the date of expiry, and the same shall be mentioned clearly in the Bank Guarantee.
14. Defects after Completion: Any defects which may appear within the defect liability period
specified shall, upon the directions in writing of the Company and within such reasonable time as
shall be specified therein be amended and made good by the Contractor, at his own cost unless the
Company shall decide that the Contractor will be paid for such amending and making good, and in
case of default on the Contractor’s part, the Company may amend and make good or have
amended and made good such defects and all damages, losses and expenses consequent thereon,
incidental to those shall be borne by the Contractor and such damages, losses and expenses shall
be recoverable from him by the Company or may be deducted by the Company from any moneys
due to or thereafter becoming due to the Contractor. Alternatively, the Company may, in lieu of
such amending and making good by the Contractor elect to deduct from any moneys due or
thereafter becoming due to the Contractor a sum to be determined by the Company sufficient to
cover the cost of amending and making good such defects, and in the event of the amount
withheld in accordance with Clause 12 being insufficient, recover the balance from the Contractor
together with any expenses the Company may have incurred in connection with such recovery.
Should any defective work have been done or bad inferior materials supplied by any Sub-
Contractor employed on the work, has been approved by the Company as provided in Clause
the Contractor shall be liable to amend and make good in the same manner as if such work or
materials had been done or supplied by the Contractor. The Contractor shall remain liable under
this Clause notwithstanding the signing by the Company’s authorized Engineer of any certificate or
the passing of any account.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
15. Alterations: The Company reserves the right at any time to alter any quantities of any item
indicated in the Purchase order/Contract, in which case the total amount payable to the Contractor
shall be less or higher, proportionate with the reduction or increase in quantity of such item,
allowance for which will be made at the Contractor’s agreed rates.
16. Subletting Agreement: The Contractor shall not sublet or assign the work or any part
thereof to another party without the written consent of the company and no such subletting or
assignment shall relieve the contractor from the full and entire responsibility of his obligation
under this Agreement.
17. Cancellation: The Company shall at any and all times during the period stipulated for the
work, has the right forthwith to cancel this agreement by giving written notice thereof to the
Contractor and in such case the Contractor shall be paid for such part of the work as has been
executed by him up to the date of cancellation, on the basis of schedule of rates as per Purchase
order/Contract and shall be reimbursed by the Company for the cost and expenses incurred by him
but which would now be wasted as a direct consequence of the cancellation of the Agreement.
18. Workmen’s Compensation Liability: The Contractor shall hold the Company harmless and
indemnified from and against all claims, costs and charges for which the Company shall be liable
under the Workmen’s Compensation Act, 1923 and any amendments thereof and the expenses to
which it shall be put thereunder, both in respect of personal injuries (within the meaning of the
said Act) to the employees and servants of the Contractor or Sub-Contractors, (if any), arising out
of, or occasioned during the currency of this agreement through the acts or omissions, whether
due to negligence or not of the Contractor, Sub-Contractor and/or Company and/or their
respective servants and employees and also in respect of the personal injuries (within the meaning
of the said Act) to the servants and employees of the Company arising out of, or occasioned
through the acts and omissions whether due to negligence or not of the Contractor, Sub-Contractor
and or their servants and employees in carrying out any of the provisions of this Agreement. This
indemnity shall be in addition to and not in lieu of any indemnity to which the Company shall be
entitled in law. The Contractor shall at his own expense effect and maintain, until the completion of
the work, with an approved office a Policy of Insurance in the joint names of the Company and the
Contractor, against such risks and deposit such Policy or policies with the Company from time to
time during the currency of this Agreement. The Contractor shall be responsible for anything not
included in the Insurance Policies above referred to and also for all other damage to person or
property arising out of or incidental to the negligent or defective carrying out of this agreement
and shall keep the Company harmless and indemnified. He shall also indemnify the Company in
respect of any costs, charges or expenses arising out of any claim or proceedings and also in
respect of any award of compensation or damages arising therefrom. The Company shall be
entitled to deduct the amount of any damages compensation costs, charges and expenses arising
or accruing from or in respect of any such claim or damages from any sum or sums due or
thereafter becoming due to the Contractor.
19. Safety Regulation: The Contractor shall ensure that he/his Sub-Contractor and his, or their
personnel or representatives shall comply with all safety regulations issued from time to time by
the Company or otherwise howsoever and should any injury resulting in death or not or damage to
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
any property occur as result of failure to comply with such regulations the Contractor shall be held
responsible for the consequences thereof, shall keep the Company harmless and indemnified.
20. Arbitration
a) Any dispute or difference of any nature whatsoever, any claim, cross-claim, counter-
claim or set off of BPCL against the Contractor or regarding any right, liability, act, omission on
account of any of the parties hereto arising out of or in relation to this agreement shall be referred
to the sole Arbitration of the concerned Director (herein after named as Director) of the BPCL or of
some officer of the BPCL who may be nominated by the concerned Director. The Contractor will
not be entitled to raise any objection to any such arbitrator on the ground that the arbitrator is an
Officer of the BPCL or that he has dealt with the matters to which the contract relates or that in the
course of his duties as an Officer of the BPCL he had expressed views on all or any other matters in
dispute or difference. In the event of the arbitrator to whom the matter is originally referred being
transferred or vacating his office or being unable to act for any reason, the Director as aforesaid at
the time of such transfer, vacation of office Or inability to act may in the discretion of the Director
designate another person to act as arbitrator in accordance with the terms of the agreement to the
end and intent that the original Arbitrator shall be entitled to continue the arbitration proceedings
not withstanding his transfer or vacation or office as an Officer of the BPCL if the Director does not
designate another person to act as arbitrator on such transfer, vacation of office or inability of
original arbitrator. Such persons shall be entitled to proceed with the reference from the point at
which it was left by his predecessor. It is also a term of this contract that no person other than the
Director or a person nominated by such Director of the BPCL as aforesaid shall act as arbitrator,
hereunder. The award of the arbitrator so appointed shall be final conclusive and binding on all
parties to the agreement subject to the provisions of the Arbitration and Conciliation Act, 1996 or
any statutory modification or re-enactment thereof and the rules made thereunder for the time
being in force shall apply to the arbitration proceedings under this clause.
b) The arbitrator shall have power to order and direct either of the parties to abide by,
observe and perform all such directions as the arbitrator may think fit having regard to the matters
in difference i.e. dispute before him. The arbitrator shall have all summary powers and may take
such evidence oral and/ or documentary, as the arbitrator in his absolute discretion thinks fit and
shall be entitled to exercise all powers under the Arbitration and Conciliation Act, 1996 including
admission of any affidavit as evidence concerning the matter in difference i.e. dispute before him.
c) The parties against whom the arbitration proceedings have been initiated, that is to
say the Respondents in the proceedings, shall be entitled to prefer a cross-claim, counter-claim or
set off before the Arbitrator in respect of any matter an issue arising out of or in relation to the
Agreement, without seeking a formal reference of arbitration to the Director for such counter-
claim, cross or set off and the Arbitrator shall be entitled to consider and deal with the same as if
the matters arising therefrom has been referred to him originally, and deemed to form part of the
reference made by the Director.
d) The arbitrator shall be at liberty to appoint, if necessary, any accountant or
engineering or other technical person to assist him and to act by the opinion so taken.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
e) The arbitrator shall have power to make one or more awards whether interim or
otherwise, in respect of the dispute and difference and in particular will be entitled to make
separate awards in respect of claims or cross-claims of the parties.
f) The arbitrator shall be entitled to direct any one of the parties to pay the costs of
the other party in such manner and to such extent as the arbitrator may in his discretion determine
and shall also be entitled to require one or both the parties to deposit funds in such proportion to
meet the arbitrators’ expenses whenever called upon to do so.
g) The parties hereby agree that the courts in the city of Mumbai/(Ernakulam-in the
case of Kochi Refinery), alone shall have jurisdiction to entertain any application or other
proceedings in respect of anything arising under this agreement and any award or awards made by
the Sole Arbitrator hereunder shall be filed in the concerned courts in the city of
Mumbai/(Ernakulam-in the case of Kochi Refinery), only.
20. Jurisdiction:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to
the jurisdiction of the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the
purpose of actions and proceedings arising out of the contract and the courts at
Mumbai/(Ernakulam-in the case of Kochi Refinery), only will have jurisdiction to hear and decide
such actions and proceedings.
21. Minimum Wages:
The Contractor, his executors and administrators (and in the case of a Limited Company, its
successors and assigns) shall hold the Company harmless and indemnified from and against all
claims, costs and charges, for which the Company shall be liable under the Minimum Wages Act,
1948, the Contract Labour (Regulation and Abolition) Act, 1970 and any amendments or
modifications thereof, and all expenses it shall be put thereunder through the acts or omissions
whether willful or not on the part of the Contractor. This indemnity shall be in addition to and not
in lieu of, any indemnity to which the Company shall be entitled in law.
22. Employees State Insurance: This Contractor hereby admits that he is fully aware of his
responsibilities under the Employees State Insurance Act, 1948, as an immediate employer of the
employees engaged by him for the execution of this contract which he agrees to discharge. The
Contractor acknowledge the statutory right of the company (as a Principle Employer) to recover the
amount of the contributions, paid by it in the first instance in respect of the employees employed
by or through him (the Contractor), as well as the employee’s contribution, if any, either by
deduction from any amount payable to him by the Company under any contract or as debt payable
by him to the Company.
In witness where of the said contracting parties have set their hands.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
For Bharat Petroleum Corporation Ltd. For Bharat Petroleum Corporation Ltd.
Contractor’s witness - Signature Contractor’s Signature
Name & Address:- Name & Address:-
PROFORMA OF BANK GUARANTEE
(On non-judicial paper of appropriate value)
FOR EARNEST MONEY / SECURITY DEPOSIT TOWARDS PERFORMANCE
Bharat Petroleum Corporation Ltd.
M/s. ________________________________________________have taken tender for the work
________________________________________ for Bharat Petroleum Corporation Ltd.
The tender Conditions of Contract provide that the Contractor shall pay a sum of
(Rupees___________________________________________) as earnest money/security deposit in
the form therein mentioned. The form of payment of earnest money/security deposit includes
guarantee executed by Scheduled Bank, undertaking full responsibility to indemnify Bharat
Petroleum Corporation Ltd. in case of default.
The said_________________________________________ have approached us and at their request
and in consideration of the premises
____________have agreed to give such guarantee as hereinafter mentioned.
undertake and agree with you that if default shall be made by M/s.
_____________________________________ in performing any of the terms and conditions of the
tender or in payment of any money payable to Bharat Petroleum Corporation Ltd. We shall on
demand pay to you in such matter as to you may direct the said amount of Rupees
_______________________________only or such portion thereof not exceeding the said sum as
you may from time to time require.
2. You will have the full liberty without reference to us and without effecting this guarantee
postpones for any time or from time to time the exercise of any of the powers and rights conferred
on you under the contract with the said _____________and to enforce or to for bear from
endorsing any power of rights or by reason of time being given to the said which under law relating
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
to the sureties would but for provision have the effect of releasing us.
3. Your right to recover the said sum of Rs.__________________(Rupees__________________
____________________) from us in manner aforesaid will not be affected or suspended by reason
of the fact that any dispute or disputes have been raised by the said M/s.__________________
_________________and/or that any dispute or disputes are pending before any officer, tribunal or
4. The guarantee herein contained shall not be determined or affected by the liquidation or
winding up, dissolution or change of constitution or insolvency of the said______________
____________________but shall in all respects and for all purposes be binding operative units
payment of all money due to you in respect of such liabilities is paid.
5. Our liability under this guarantee is restricted to
Rupees__________________________________ Our guarantees shall remain in force
until_____________________________________________ unless a suit or action to enforce a
claim under_________________________________________ Guarantee is filed against us within
six months from
_____________________________(which is date of expiry of guarantee) all our rights under the
said guarantee shall be forfeited and shall be relieved and discharged from all liabilities thereunder.
6. We have power to issue this guarantee in your favour under Memorandum and Articles of
Association and the undersigned has full power to do under the Power of Attorney dated
__________________granted to him by the Bank.
Yours faithfully
______________________________ Bank by its Constituted Attorney Signature of a person duly
authorized to sign on behalf of the bank.
BHARAT PETROLEUM CORPORATION LTD
ACKNOWLEDGEMENT
_______________________________ received the copy of GENERAL CONDITIONS OF CONTRACT
and confirm our acceptance to all the terms and conditions as mentioned herein in this General
Conditions of Contract and we are hereby returning this copy of Acknowledgement duly signed.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
( Seal / Stamp )
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
BHARAT PETROLEUM CORPORATION LIMITED
Bharat Petroleum Corporation Limited (BPCL) hereinafter referred to as "The Principal",
M/s ___________________ hereinafter referred to as "The Bidder/ Contractor/ Supplier"
The Principal intends to award, under laid down organization procedures, contract/s for
“PROVIDING SECURITY SERVICES AT BPCL SRINAGAR DEPOT” The Principal values
full compliance with all relevant laws and regulations, and the principles of economic use of
resources, and of fairness and transparency in its relations with its Bidder/s, Contractor/s
and Supplier/s.
In order to achieve these goals, the Principal cooperates with the renowned international
Non-Governmental Organization "Transparency International" (TI). Following TI's national
and international experience, the Principal will appoint Independent External Monitor(s)
(IEM) as detailed in Annexure who will monitor the tender process and the execution of the
contract for compliance with the principles mentioned above.
Section 1 – Commitments of the Principal
1) The Principal commits itself to take all measures necessary to preven t corruption and to
observe the following principles:
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
a) No employee of the Principal, personally or through family members, will in connection
with the tender, or the execution of the contract, demand, take a promise for or
accept, for himself/herself or third person, any material or immaterial benefit which
he/she is not legally entitled to.
b) The Principal will, during the tender process, treat all Bidders with equity and reason.
The Principal will, in particular, before and during the tender process, provide to all
Bidders the same information and will not provide to any Bidder confidential /
additional information through which the Bidder could obtain an advantage in relation
to the tender process or the contract execution.
c) The Principal will exclude from the process all known prejudiced persons.
2) If the Principal obtains information on the conduct of any of its employees which is a
criminal offence under the relevant Anti-Corruption Laws of India, or if there be a
substantive suspicion in this regard, the Principal will inform its Vigilance Office and in
addition can initiate disciplinary actions.
Section 2 – Commitments of the Bidder / Contractor / Supplier
1) The Bidder / Contractor / Supplier commits itself to take all measures necessary to prevent
corruption. He commits himself to observe the following principles during his participation
in the tender process and during the contract execution.
a) The Bidder / Contractor/Supplier will not, directly or through any other person or firm,
offer, promise or give to any of the Principal's employees involved in the tender
process or the execution of the contract or to any third person, any material or
immaterial benefit which he/she is not legally entitled to, in order to obtain in
exchange, any advantage of any kind whatsoever during the tender process or during
the execution of the contract.
b) The Bidder / Contractor / Supplier will not enter with other Bidders into any
undisclosed agreement or understanding, whether formal or informal. This applies in
particular to prices, specifications, certifications, subsidiary contracts, submission or
non-submission of bids or any other actions to restrict competitiveness or to introduce
cartelisation in the bidding process.
c) The Bidder / Contractor / Supplier will not commit any offence under the relevant Anti-
Corruption Laws of India; further the Bidder / Contractor / Supplier will not use
improperly, for purposes of competition or personal gain, or pass on to others, any
information or document provided by the Principal as part of the business relationship,
regarding plans, technical proposals and business details, including information
contained or transmitted electronically.
d) The Bidder / Contractor / Supplier will, when presenting his bid, disclose any and all
payments he has made, is committed to, or intends to make to agents, brokers or any
other intermediaries in connection with the award of the contract.
e) The Bidder / Supplier / Contractor shall make sure that the terms of this Integrity pact are also
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
adopted by its Sub-Contractors / Sub -Sub-Contractors, etc., if any and submit such adoption
confirmation proof to the Principal
2) The Bidder / Contractor / Supplier will not instigate third persons to commit offences
outlined above or be an accessory to such offences.
Section 3 – Disqualification from tender process and exclusion from future contracts
If the Bidder, before contract award, has committed a transgression through a violation of
Section 2 or in any other form such as to put his reliability or credibility as Bidder into
question, the Principal is entitled to disqualify the Bidder from the tender process or to
terminate the contract, if already signed, for such reason.
1) If the Bidder/Contractor/Supplier has committed a transgression through a violatio n of
Section 2 such as to put his reliability or credibility into question, the Principal is also
entitled to exclude the Bidder / Contractor / Supplier from future Contract award
process. The imposition and duration of the exclusion will be determined by the severity
of the transgression. The severity will be determined by the circumstances of the case,
in particular the number of transgressions, the position of the transgressors within the
company hierarchy of the Bidder and the amount of the damage. The exclusion will be
imposed for a minimum of 6 months and maximum of 3 years.
2) A transgression is considered to have occurred if the Principal after due consideration of
the available evidences, concludes that no reasonable doubt is possible.
3) The Bidder accepts and undertakes to respect and uphold the Principal's absolute right
to resort to and impose such exclusion and further accepts and undertakes not to
challenge or question such exclusion on any ground, including the lack of any hearing
before the decision to resort to such exclusion is taken. This undertaking is given freely
and after obtaining independent legal advice.
4) If the Bidder / Contractor / Supplier can prove that he has restored / recouped the
damage caused by him and has installed a suitable corruption prevention system, the
Principal may revoke the exclusion prematurely.
Section 4 – Compensation for Damages
1) If the Principal has disqualified the Bidder from the tender process prior to the award
according to Section 3, the Principal is entitled to demand and recover from the Bidder
liquidated damages equivalent to Earnest Money Deposit/Bid Security.
2) If the Principal has terminated the contract according to Section 3, or if the Principal is
entitled to terminate the contract according to Section 3, the Principal shall be entitled to
demand and recover from the Contractor/Supplier liquidated damages equivalent to
Security Deposit / Performance Bank Guarantee.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
3) The Bidder agrees and undertakes to pay the said amounts without protest or demur subject only
to condition that if the Bidder / Contractor / Supplier can prove and establish that the exclusion of
the Bidder from the tender process or the termination of the contract after the contract award has
caused no damage or less damage than the amount of the liquidated damages, the Bidder /
Contractor/Supplier shall compensate the Principal only to the extent of the damage in the
Section 5 – Previous Transgression
1) The Bidder declares that no previous transgression occurred in the last 3 years with any other
Company in any country conforming to the TI approach or with any other Public Sector Enterprise
in India that could justify his exclusion from the tender process.
2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender
process or the contract, if already awarded, can be terminated for such reason.
Section 6 – Equal treatment of all Bidders /Contractors /Suppliers/Subcontractors
1) The Bidder/Contractor/Supplier undertakes to demand from all subcontractors a commitment in
conformity with this Integrity Pact, and to submit it to the Principal before contract signing.
2) The Principal will enter into agreements with identical conditions as this one with all Bidders,
Contractors/Suppliers and Subcontractors.
3) The Principal will disqualify from the tender process all Bidders who do not sign this Pact or
violate its provisions.
Section 7 – Punitive Action against violating Bidders /Contractors /
Suppliers/Subcontractors
If the Principal obtains knowledge of conduct of a Bidder, Contractor, Supplier or Subcontractor, or of
an employee or a representative or an associate of a Bidder, Contractor, Supplier or Subcontractor
which constitutes corruption, or if the Principal has substantive suspicion in this regard, the Principal
will inform the Vigilance Office.
Section 8 – Independent External Monitors
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
1) The CVC has appointed competent and credible Independent External Monitors for this Pact. The
task of the Monitor is to review independently and objectively, whether and to what extent the
parties comply with the obligations under this agreement.
2) The Monitor is not subject to instructions by the representatives of the parties and performs his
functions neutrally and independently. He reports to the Chairperson of the Board of the Principal.
3) The Bidder/Contractor/Supplier accepts that the Monitor has the right to access without restriction
to all Project documentation of the Principal including that provided by the
Bidder/Contractor/Supplier. The Bidder/Contractor/Supplier will also grant the Monitor, upon his
request and demonstration of a valid interest, unrestricted and unconditional access to this project
documentation. The same is applicable to Subcontractors. The Monitor is under contractual
obligation to treat the information and documents of the Bidder/Contractor/Supplier/Subcontractor
with confidentiality.
4) The Principal will provide to the Monitor sufficient information about all meetings among the
parties related to the Project provided such meetings could have an impact on the contractual
relations between the Principal and the Bidder/Contractor/Supplier. The parties offer to the Monitor
the option to participate in such meetings.
5) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he will so
inform the Management of the Principal and request the Management to discontinue or heal the
violation, or to take other relevant action. The Monitor can in this regard submit non-binding
recommendation. Beyond this, the Monitor has no right to demand from the parties that they act in
a specific manner, refrain from action or tolerate action. However, the Independent External
Monitor shall give an opportunity to the Bidder/Contractor/Supplier to present its case before
making its recommendations to the Principal.
6) The Monitor will submit a written report to the Chairperson of the Board of the Principal within 8 to
10 weeks from the date of reference or intimation to him by the 'Principal' and, should the occasion
arise, submit proposals for correcting problematic situations.
7) If the Monitor has reported to the Chairperson of the Board a substantiated suspicion of an
offence under relevant Anti-Corruption Laws of India, and the Chairperson has not, within
reasonable time, taken visible action to proceed against such offence or reported it to the
Vigilance Office, the Monitor may also transmit this information directly to the Central Vigilance
Commissioner, Government of India.
8) The word 'Monitor' would include both singular and plural.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
9) The IEMs appointed for this contract are :
Shri Ganesh Vishwakarma Shri Atanu Purkayastha Shri Pradeep Kumar
Email id: Emai id: Email Id:
ganesh_vishwakarma@yahoo. [email protected] [email protected]
Section 9 – Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier
months after the last payment under the respective contract, and for all other Bidders 6 months after
the contract has been awarded.
If any claim is made / lodged during this time, the same shall be binding and continue to be valid
despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson
of the Principal.
Section 10 - Other provisions
1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the Registered
Office of the Principal, i.e. Mumbai. The Arbitration clause provided in the main tender document /
contract shall not be applicable for any issue / dispute arising under Integrity Pact.
2) Changes and supplements as well as termination notices need to be made in writing. Side
agreements have not been made.
3) If the Bidder/Contractor/Supplier is a partnership or a consortium, this agreement must be signed
by all partners or consortium members.
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
4) Should one or several provisions of this agreement turn out to be invalid, the remainder of this
agreement remains valid. In this case, the parties will strive to come to an agreement to their
original intentions.
5) Any Bidder / Supplier / Contractor entering into Integrity Pact, aggrieved by any decision / action of
the Principal, shall approach the IEM(s) and await their decision before pursuing any other remedy
available to him in law.
riaz Digitally signed by riaz turi
For the Principal For the Bidder/Contractor/Supplier
Place- Srinagar Witness
(Signature/Name/Address)
Date: 05.03.2025 (Signature/Name/Address)
NIT-Providing Security Services at BPCL Srinagar Depot CRFQ No.-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20242.pdf
pdf • 1.35 MB
BUDGETDOC_20242.pdf
pdf • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .