| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance Qualified for the award of contract |
| 2 | L2₹1.9 Cr+₹69.3 L (59.9%)Rejected-Finance 11 13 39 RD NO 3 GREEN HILLS COLONY SAROORNAGAR HYDERABAD TELANGANA 500035 | RANGA REDDY | TELANGANA | 500035 | ₹1.9 Cr+₹69.3 L (59.9%) | L2 | Rejected-Finance Not Qualified for the award of contract |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
11 Dec 2024, 3:00 pmClosed
The Senior Manager, Project Purchase
The Senior Manager, Project Purchase, ICSR, IIT Madras, Chennai - 600036
LAND AND MARINE GEOTECHNICAL INVESTIGATION AT PRATAPUR, PARADIP, ODISHA
2024_IITM_214248_1
OE/MURA/096/2024/LANDMARI
Open Tender
Miscellaneous Services
Supply
21 days
NTCPWC, IIT Madras
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.7 L
Yes
13 Jan 2025
12 Nov 2024
12 Dec 2024
12 Nov 2024
11 Dec 2024
13 Nov 2024
1. Mobilisation: Mobilisation of Jackup patform/Pontoons/ marine crafts / Boats/ Staging patform/and all related accessories/ Soil Boring/ drilling rigs including all its accessories, field/insitu Soil test equipment and all its accessories for carrying out Soil Investigation in all types of Soil , suitable survey vessel and Survey equipment’s and its accessories at site for identifying borehole positions, taking levels and coordinates before commencement of drilling/boring etc including tripod, pulley, winches, hydraulic power pack, pumps, drilling accessories, generator, safety provisions, taxes, permissions and approvals, men and material, consumables including all.
2. De -mobilisation : De -mobilisation of Jackup patform/Pontoons/ marine spreads / Boats/ Staging patform/and all related accessories/ Soil Boring/ drilling rigs including all its accessories, field/insitu Soil test equipment and all its accessories for carrying out Soil Investigation in all types of Soil , survey vessel, survey equipment’s and its accessories at site for identifying borehole positions, taking levels and coordinates before commencement of drilling/boring etc including tripod, pulley, winches, hydraulic power pack, pumps, drilling accessories, generator, safety provisions, taxes, permissions and approvals, men and material, consumables including all.
3. LAND BOREHOLES - 10 Nos
3 (a) Shifting and positioning of drilling equipment along with all accessories from one Borehole location to another including assembly and erecting the rig at location, includes equipment etc all complete
3 (b) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 20m CD below exisitng ground level (BGL) or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc.
3 (c) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 20m CD or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants. Note: During advancement /drilling of boreholes, incase, Sand layer is encountered and continuing below 5m, drilling shall be continued below 5m with SPTs/UDSs with 1m interval. In this regard the termination of borehole shall 10m or till encountering of sand layer, whichever is earlier.
3 (d) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants
4. MARINE BOREHOLES - SAND TRAP AREA - 14 Nos
4 (a) Shifting and positioning of Jackup barge/Jackup patform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete
4 (b) Shifting and positioning of floating pontoon / Marine crafts from one Borehole location to another including assembly and erecting rig at location, mooring the craft, includes equipment etc all complete
4 (c) Shifting and positioning the staging platform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete
4 (d) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc
4 (e) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants
4 (f) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5 m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants
5. MARINE BOREHOLES - HARBOUR BASIN & OUTER CHANNEL AREA - 16 Nos
5 (a) Shifting and positioning of Jackup barge/Jackup patform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete
5 (b) Shifting and positioning of floating pontoon / Marine crafts from one Borehole location to another including assembly and erecting rig at location, mooring the craft, includes equipment etc all complete
5 (c) Shifting and positioning the staging platform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete
5 (d) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 20m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc
5 (e) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants
5 (f) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5 m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants
6. CONDUCTING LABORATORY TESTS Conducting Laboratory tests as per relevant IS codes of practice on the test samples collected in field, furnishing the test results, etc., complete as directed by the Engineer all includes
(a) Sieve Analysis / Hydrometer analysis and preparation of GSA curves
(b) Natural Moisture content
(c) Bulk density
(d) Relative density
(e) Specific gravity
(f) Consolidation tests
(g) Strength tests ( Triaxial tests / Direct shear)
(h) Chemical analysis on Soil for chloride, Sulphate and pH
7. SUBMISSION OF REPORTS
7 (a) DRAFT REPORT - Preparation and Submission of DRAFT report of geotechnical investigation after analysis, processing and compilation of field and laboratory data/ results and report shall consist of field photographs, field investigation data, laboratory test results, soil sectional profiles, no of layers encountered, recommendations etc including all except GST. The recommendations specifically with layers encountered along with percentages of sand, silt and clay and dredgeability recommendations. 6 hard and 3 soft copies - original
7 (b) FINAL REPORT - After taking in to the observations of Employer and concerned, and by including the clarifications and Preparing and Submission of FINAL report of geotechnical investigation after analysis, processing and compilation of field and laboratory data/ results and report shall consist of field photographs, field investigation data, laboratory test results, soil sectional profiles, no of layers encountered, recommendations etc including all except GST. The recommendations specifically with layers encountered along with percentages of sand, silt and clay and dredgability recommendations. 6 hard and soft copies -original
Manglam Consultancy Services Hyderabad (BID ID -781806)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .