| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.7 LAccepted-Finance | ₹42.7 L | L1 | Accepted-Finance accept |
| 2 | L2₹43.0 L+₹29,334 (0.69%)Rejected-Finance | ₹43.0 L+₹29,334 (0.69%) | L2 | Rejected-Finance reject |
| 3 | L3₹44.7 L+₹1.9 L (4.55%)Rejected-Finance | ₹44.7 L+₹1.9 L (4.55%) | L3 | Rejected-Finance reject |
| 4 | L4₹44.8 L+₹2.1 L (4.94%)Rejected-Finance | ₹44.8 L+₹2.1 L (4.94%) | L4 | Rejected-Finance reject |
| 5 | L5₹49.6 L+₹6.9 L (16.2%)Rejected-Finance | ₹49.6 L+₹6.9 L (16.2%) | L5 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | Sooranad Labour Contract Co-Operatiive Society LTD No. Q1343 L1 | aseebashraf L3 | M R BINU L5 | SHEREEF K A L2 | saaj constructions L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00estimate | ||||||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.52 | cum | 2,328 ₹5,866.56 Lowest | 2,504.09 ₹6,310.31 | 2,743.45 ₹6,913.49 | 2,409 ₹6,070.68 | 2,500 ₹6,300 |
| 1.00 | OD298203/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. The cement content as per mix design has to be used at site. Excess cement used as per design mix not payable separately as per Circular No. CE/BL/GL/6541/2015 dated 30/8/2017 of CE buildings PWD. All work above plinth level up to floor V level | 65.03 | cum | 12,924 ₹8,40,499.42 | 12,858.15 ₹8,36,216.93 | 14,087.23 ₹9,16,148.92 | 12,373 ₹8,04,665.68 Lowest | 13,000 ₹8,45,442 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 201.72 | sqm | 889 ₹1,79,333.53 Lowest | 956.34 ₹1,92,917.69 | 1,047.75 ₹2,11,357.37 | 920 ₹1,85,587 | 1,000 ₹2,01,725 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 132.85 | sqm | 705 ₹93,660.66 Lowest | 758.99 ₹1,00,833.34 | 831.54 ₹1,10,471.75 | 730 ₹96,981.96 | 750 ₹99,639 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 113.4 | sqm | 932 ₹1,05,688.8 Lowest | 1,003.41 ₹1,13,786.69 | 1,099.32 ₹1,24,662.89 | 965 ₹1,09,431 | 1,000 ₹1,13,400 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 51.84 | sqm | 762 ₹39,502.08 Lowest | 820.6 ₹42,539.9 | 899.04 ₹46,606.23 | 789 ₹40,901.76 | 820 ₹42,508.8 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 49.41 | sqm | 945 ₹46,692.45 Lowest | 1,016.73 ₹50,236.63 | 1,113.91 ₹55,038.29 | 978 ₹48,322.98 | 1,000 ₹49,410 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 85.7 | metre | 211 ₹18,082.7 Lowest | 226.97 ₹19,451.33 | 850 ₹72,845 | 218 ₹18,682.6 | 230 ₹19,711 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 8,103.24 | kg | 103 ₹8,34,633.72 Lowest | 111.86 ₹9,06,428.43 | 122.55 ₹9,93,052.06 | 107 ₹8,67,046.68 | 108 ₹8,75,149.92 |
Tender Value
₹44.9 L
EMD Value
₹50,000
Closing Date
14 Jul 2026, 2:00 pmClosed
Executive Engineer PWD Building Divsion,EKM
Executive Engineer PWD Building Divsion,EKM
Construction of First floor building for BTS LP School at Edappally
2026_PWD_855429_2
PWD/BLDG/TR/17315/2025_5_2_1/1
Open Tender
Civil Works - Buildings
Item Rate
270 days
Edapplly
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
11 Sept 2026
4 Jul 2026
16 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1estimate | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.002 | OD298203/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. The cement content as per mix design has to be used at site. Excess cement used as per design mix not payable separately as per Circular No. CE/BL/GL/6541/2015 dated 30/8/2017 of CE buildings PWD. All work above plinth level up to floor V level | 0.6 | cum | - | - |
| 1.003 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.8 | sqm | - | - |
| 1.005 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.006 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | - | sqm | - | - |
| 1.007 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 1 | sqm | - | - |
| 1.008 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1452393.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1452393.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 1.95 MB
viewnit.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .