| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹11.9 L (7.93%)Admitted-Finance | ₹1.6 Cr+₹11.9 L (7.93%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹50.7 L (33.7%)Admitted-Finance | ₹2.0 Cr+₹50.7 L (33.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹73.9 L (49.2%)Admitted-Finance | ₹2.2 Cr+₹73.9 L (49.2%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹75.7 L (50.4%)Admitted-Finance | ₹2.3 Cr+₹75.7 L (50.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VAKRTUND ENTERPRISES L5 | TDFM FACILITIES PVT LTD L4 | KHURANA ENGINEERING WORKS PVT LTD L2 | ONIX ENCLAVES PVT LTD L1 | V DIVINE CONSTRUCTIONS L3 | NOPS INFRASTRUCTURE PVT. LTD. L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations | |||||||||
| 1.10 | 1” OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A) | 400 | RM | 850 ₹4,01,200 | 800 ₹3,77,600 | 220 ₹1,03,840 Lowest | 280 ₹1,32,160 | 300 ₹1,41,600 | 900 ₹4,24,800 |
| 1.20 | ¾” OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A) | 11,510 | RM | 800 ₹1,08,65,440 | 800 ₹1,08,65,440 | 255 ₹34,63,359 Lowest | 280 ₹38,02,904 | 350 ₹47,53,630 | 1,350 ₹1,83,35,430 |
| 1.30 | ½” OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A) | 1,190 | RM | 850 ₹11,93,570 | 800 ₹11,23,360 | 200 ₹2,80,840 Lowest | 280 ₹3,93,176 | 375 ₹5,26,575 | 1,125 ₹15,79,725 |
| 1.40 | Erection rates of following items (Refer TS Section III - A): Ball Valves ¾” Size | 412 | Nos. | 300 ₹1,45,848 | 250 ₹1,21,540 | 340 ₹1,65,294.4 | 300 ₹1,45,848 | 150 ₹72,924 Lowest | 900 ₹4,37,544 |
| 1.50 | Erection rates of following items (Refer TS Section III - A): Ball Valves ½” Size(2 way/3 way) | 464 | Nos. | 300 ₹1,64,256 | 250 ₹1,36,880 | 340 ₹1,86,156.8 | 300 ₹1,64,256 | 100 ₹54,752 Lowest | 900 ₹4,92,768 |
| 1.60 | Erection rates of following items (Refer TS Section III - A): Ferrule Fittings 1” (if to be changed) | 5 | Nos. | 100 ₹590 | 100 ₹590 | 100 ₹590 | 300 ₹1,770 | 250 ₹1,475 | 45 ₹265.5 Lowest |
| 1.70 | Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ¾” (if to be changed) | 59 | Nos. | 100 ₹6,962 | 100 ₹6,962 | 120 ₹8,354.4 | 300 ₹20,886 | 100 ₹6,962 | 45 ₹3,132.9 Lowest |
| 1.80 | Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ½” (if to be changed) | 59 | Nos. | 100 ₹6,962 | 100 ₹6,962 | 120 ₹8,354.4 | 300 ₹20,886 | 75 ₹5,221.5 | 45 ₹3,132.9 Lowest |
| 2.00Dismantaling of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submitting to Company's Stores from CNG site. | |||||||||
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
1 Oct 2021, 3:00 pmClosed
Chief Manager (C and P)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
RATE CONTRACT FOR A PERIOD OF 2 YEARS FOR WORKS CONTRACT FOR MECHANICAL WORKS IN CNG STATIONS AT NASHIK, SINDHUDURG AND RAMANAGARA GEOGRAPHICAL AREA
2021_MNGL_89411_1
MNGL/CP/2021-22/116
Open Tender
Miscellaneous Services
Works
730 days
Nashik, Sindhudurg, Ramnagara
As per tender document.
15 documents required · 15 mandatory
₹0
₹2 L
Yes
3 Nov 2021
24 Sept 2021
4 Oct 2021
24 Sept 2021
1 Oct 2021
24 Sept 2021
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations
1” OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾” OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½” OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A): Ball Valves ¾” Size
Erection rates of following items (Refer TS Section III - A): Ball Valves ½” Size(2 way/3 way)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings 1” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ¾” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ½” (if to be changed)
Dismantaling of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submitting to Company's Stores from CNG site.
SS 316 tube of 3/4" OD/ 1/2" OD / SS 304 tube of 1/2" OD (Refer TS Section III - A)
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½” OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.:
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51-100) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (101-150) Km
SECTION-B (ii) : UNLOADING & LOADING OF MECHANICAL EQUIPMENT (CASCADE) Unloading from existing position (including Compressed natural Gas venting from cascade if necessary) at Ground level or on roof at 3.5 m above ground level, lifting & erecting on foundation at ground level in the same CNG stations. Again the same cascade is to be shifted to new foundation within the same CNG station. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity (Refer TS Section III - B)
SECTION-B (iii) : UNLOADING, TRANSPORTAION & LOADING OF BOOSTER COMPRESSOR Unloading from existing position (including dismantaling of connection, packaging of booster Compressor package), handling including lifting and transportation from CNG stations to Company's store / erecting on civil foundation at or above ground level in other CNG station site if necessary. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, wire rope, gasket, nut bolts, etc. :
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (0-50Km)
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (51-100Km)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM:- Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C) :- DCP -75 Kg
Fire fighting Equipments (Refer TS Section III - C) :- DCP -9 Kg
Fire fighting Equipments (Refer TS Section III - C) :- CO2 – 4.5 Kg
Fire fighting Equipments (Refer TS Section III - C) :- Sand Bucket Set (6 Nos. on each stand)
Note: The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may increase or decrease at site at the time of actual execution and as per the discretion of Owner/ Engineer-in-charge. The unit rate shall be operated to work out the final payment due to Contractor.
Description of Work / Item(s)
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations
1” OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾” OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½” OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A): Ball Valves ¾” Size
Erection rates of following items (Refer TS Section III - A): Ball Valves ½” Size(2 way/3 way)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings 1” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ¾” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ½” (if to be changed)
Dismantaling of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submitting to Company's Stores from CNG site.
SS 316 tube of 3/4" OD/ 1/2" OD / SS 304 tube of 1/2" OD (Refer TS Section III - A)
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½” OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.:
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51 -100) Km
SECTION-B (ii) : UNLOADING & LOADING OF MECHANICAL EQUIPMENT (CASCADE) Unloading from existing position (including Compressed natural Gas venting from cascade if necessary) at Ground level or on roof at 3.5 m above ground level, lifting & erecting on foundation at ground level in the same CNG stations. Again the same cascade is to be shifted to new foundation within the same CNG station. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity (Refer TS Section III - B)
SECTION-B (iii) : UNLOADING, TRANSPORTAION & LOADING OF BOOSTER COMPRESSOR Unloading from existing position (including dismantaling of connection, packaging of booster Compressor package), handling including lifting and transportation from CNG stations to Company's store / erecting on civil foundation at or above ground level in other CNG station site if necessary. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, wire rope, gasket, nut bolts, etc. :
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (0-50Km)
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (51-100Km)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM: Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C) : DCP -75 Kg
Fire fighting Equipments (Refer TS Section III - C) : DCP -9 Kg
Fire fighting Equipments (Refer TS Section III - C) : CO2 – 4.5 Kg
Fire fighting Equipments (Refer TS Section III - C) : Sand Bucket Set (6 Nos. on each stand)
Note: The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may increase or decrease at site at the time of actual execution and as per the discretion of Owner/ Engineer-in-charge. The unit rate shall be operated to work out the final payment due to Contractor.
Description of Work / Item(s)
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations
1” OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾” OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½” OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A): Ball Valves ¾” Size
Erection rates of following items (Refer TS Section III - A): Ball Valves ½” Size(2 way/3 way)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings 1” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ¾” (if to be changed)
Erection rates of following items (Refer TS Section III - A): Ferrule Fittings ½” (if to be changed)
Dismantaling of SS tubes along with all fittings (i.e. unions, reducers, elbows, Tees, Front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submitting to Company's Stores from CNG site.
SS 316 tube of 3/4" OD/ 1/2" OD / SS 304 tube of 1/2" OD (Refer TS Section III - A)
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½” OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.:
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51 -100) Km
SECTION-B (ii) : UNLOADING & LOADING OF MECHANICAL EQUIPMENT (CASCADE) Unloading from existing position (including Compressed natural Gas venting from cascade if necessary) at Ground level or on roof at 3.5 m above ground level, lifting & erecting on foundation at ground level in the same CNG stations. Again the same cascade is to be shifted to new foundation within the same CNG station. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity (Refer TS Section III - B)
SECTION-B (iii) : UNLOADING, TRANSPORTAION & LOADING OF BOOSTER COMPRESSOR Unloading from existing position (including dismantaling of connection, packaging of booster Compressor package), handling including lifting and transportation from CNG stations to Company's store / erecting on civil foundation at or above ground level in other CNG station site if necessary. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, wire rope, gasket, nut bolts, etc. :
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (0-50Km)
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (51-100Km)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM: Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C) : DCP -75 Kg
Fire fighting Equipments (Refer TS Section III - C) : DCP -9 Kg
Fire fighting Equipments (Refer TS Section III - C) : CO2 – 4.5 Kg
Fire fighting Equipments (Refer TS Section III - C) : Sand Bucket Set (6 Nos. on each stand)
Note: The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may increase or decrease at site at the time of actual execution and as per the discretion of Owner/ Engineer-in-charge. The unit rate shall be operated to work out the final payment due to Contractor.
KHURANA ENGINEERING WORKS PVT LTD
V DIVINE CONSTRUCTIONS
TDFM FACILITIES PVT LTD
VAKRTUND ENTERPRISES
NOPS INFRASTRUCTURE PVT. LTD.
KHURANA ENGINEERING WORKS PVT LTD
V DIVINE CONSTRUCTIONS
NOPS INFRASTRUCTURE PVT. LTD.
VAKRTUND ENTERPRISES
TDFM FACILITIES PVT LTD
V DIVINE CONSTRUCTIONS
KHURANA ENGINEERING WORKS PVT LTD
NOPS INFRASTRUCTURE PVT. LTD.
VAKRTUND ENTERPRISES
TDFM FACILITIES PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .