Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance FIRST FLOOR 44 DDA SHOPPING COMPLEX BUDH BAZAR SIDE 42 KALKAJI NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical PLOT NO 234 BBN ENERGY SYSTEMS PRIVATE LIMITED 234 SECTOR 37 PHASE VI UDYOG VIHAR GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | Not Admitted-Fee/PreQual/Technical Blank Documents uploaded |
Tender Value
₹2.8 L
EMD Value
₹5,670
Closing Date
20 Jan 2020, 3:30 pmClosed
Airport Director, Calicut Airport
O/o JGM (CNS), Airports authority of India, Calicut International airport Calicut airport Po-673647
REVAMPING OF LIGHTNING PROTECTION SYSTEM AT ATS BLOCK, CALICUT INTERNATIONAL AIRPORT.
2020_AAI_39653_1
AAI/SR/CL/CNS/ LPS/NIT-10/2019-20
Open Tender
Electrical Works
Turn-key
60 days
Calicut Airport
Please refer Tender documents.
5 documents required · 5 mandatory
₹560
Yes
GM AAI
₹5,670
Yes
18 Jul 2022
7 Jan 2020
23 Jan 2020
7 Jan 2020
20 Jan 2020
7 Jan 2020
7 Jan 2020 - 20 Jan 2020
Amount
Supply of 50 sq.mm flexible copper wire for LPS down conductor (Cable Make: Polycab, Unicab, Havells, Finolex)
Supply of 25mmx3mm Galvanized Iron Strip for Laying on top exterior border of Parapet wall
Supply of 25mm x 3mm, 99.9% pure electrolytic Copper strip
Supply of. FRP Pipe (Length: 4 meters, Diameter: 2" & Thickness: 4mm)
Supply of 1/2" Rigid PVC Pipe
Supply of Lightning rod as per given specifications
Supply of 25x6mm, 99.9% pure electrolytic Copper strip, Length 02 feet for Equipotential Bar
Supply of Detachable Metallic enclosure (90cm X 15cm x15cm) for Equipotential Bar*
Installation of Lightning rod on FRP Pipe of length 4meter with Stainless steel Nuts and Bolts and mounting it on the existing GI mast using Stainless Steel Clamps/ connectors with Stainless Steel Nuts and Bolts.Both ends of the 50sq.mm flexible copper cable to be connected with Copper Lugs and one end to be terminated to the Lightning Rod with SS Nuts and Bolts and other End to the Equipotential Bar at ground level with SS nut and Bolts. . The cable to be laid through PVC pipe.The FRP pipe to be supported by minimum of Qty 3 Fiber Guy wire support.*
Laying of Copper strip from Equipotential Bar to Earth Pit (Distance: 5 metre)and between Equipotential Bars( Distance : 40 metres)*
Laying of 270 meters, 25mmx3mm Galvonised Iron Strip on top exterior border of Parapet wall with GI Clamp at 1m spacing (Layout Diagram attached)*
Welding of GI to GI at 20 points*
Copper to Copper brazing at 70 points*
Making of Qty.02 Nos. Conventional Earth Pit with inspection chamber as per given specifications#
The Quantity mentioned in the Bill of Materials towards the Items Number 10, 11, 12 and 13 may vary as per requirement. The payment will be made on the basis of actuals only.
Unex Power Point Pvt Ltd
Secom Services India Pvt.Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .