Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹14.8 L
EMD Value
₹37,000
Closing Date
11 Mar 2025, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
HANUMANTHA RAO K
Preparation of Detailed Project Report (DPR) for Construction of Proposed Ring road for Pavagada Town in Pavagada Taluk
PWD/2024-25/SE0289
PWD/2024-25/SE0289
Open
Two Tender Document System(Two Cover)
PWD Division Office Madhugiri
8 documents required · 8 mandatory
The Consultants Should have a minimum of 3 years of Experience as a Consultants Company conducting similar assignments of Govt. Work.
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 Achieved in at least two financial years a minimum financial turnover in all classes of Consultancy Services works only of Rs.15.00 Lakhs
The Consultants Should have experience in Preparation of DPR and Structural Design of any Government road work costing minimum Rs.15.00 Crores within previous five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24
The Consultants Company should have and deploy the following key personnel / manpower for the assignment. Bio data of individual key personnel signed by the individual member shall be furnished.(General Qualifications, Adequacy for the project, Experience in region & language of key personal should be furnished). as given in Tender Document. Team leader-20 years' experience - 1No., Senior Structural Engineer - 10 years' experience - 1 No., Structural Engineer - 5 years' experience - 1 No, ,Surveyor - 5 years' experience 2 No., CAD Draughtsman - 2 years' experience - 2 Nos. and Computer Operator - 2 years' experience - 1 Nos. Others
Company Registration Certificate
The approach and methodology shall clearly define the Consultants approach to complete the assignment within the time frame and methodology adopted. Adequacy of the proposed work plan and methodology in responding to the terms of reference (TOR)
₹500
₹37,000
3 Mar 2025
3 Mar 2025
12 Mar 2025
7 Mar 2025
Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps, area calculation, preparation of proposal, printing,binding, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. (For new alignment) (Vol-1, Addendum VI Surveying, I.No.39, Page No. 129)
Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW, taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line, encroachments, structures etc(Vol-1, Addendum VI Surveying, I.No.41, Page No. 129)01
Providing detailed geological reports of proposed site by maintaining geotechnical investigation of structure stratification collecting soil, rock and ground water samples for laboratory tests to arrive the foundation design parameters. Rock properties such as type of rock, jointing fractures, etc. complete with suggestion about the site foundation and remedies (Vol-1, Addendum VI Surveying, I.No.56, Page No. 132)
Survey of C.D. works including taking L-Section of road, catchment area plan by Traverse method and taking trial pits of size 1.50 x 1.50 x 1.50 m including preparation of detailed plans and estimates in 5 copies and all types of compliance if required from the department. (Vol-1, Addendum VI Surveying, I.No.61, Page No. 133)
Design of junctions including detail layout of traffic signs, informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete. b) Minor Junction (Vol-1, Addendum VI Surveying, I.No.63, Page No. 133)
Preparation of draft / Final Report comprising of technical, financial economic feasibility and environmental aspects of the project including executive summary and detailed chapters on necessity and introduction of project existing and future traffic, design philosophy scope of work, summary of available cost estimates(Vol-1, Addendum VI Surveying, I.No.65, Page No. 133)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Doc - SE0289 (1) (2).doc
Tender Document • 0.37 MB
LOI dtd.01.08.2024 (2).pdf
Instructions to Tenderers • 2.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .