Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC | 1 | Accepted-AOC lowest bidder | |
| 2 | 2₹9.2 L+₹43,065 (4.90%)Rejected-Finance | 2 | Rejected-Finance . | |
| 3 | 3₹9.6 L+₹79,050 (9.00%)Rejected-Finance | 3 | Rejected-Finance . |
Tender Value
Refer Docs
EMD Value
₹13,322
Closing Date
19 Feb 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Roads Sub Division Kalpetta
2020-21 Urgent Side Protection works in between km7/700 to 7/900 of RHS of Chennalode Oottupara Road
2021_PWD_413653_1
RdDnWYD/RD/2021/513
Open Tender
Civil Works - Roads
Item Rate
60 days
padinjarathara section
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,960
Yes
₹13,322
Yes
18 Sept 2021
10 Feb 2021
22 Feb 2021
10 Feb 2021
19 Feb 2021
10 Feb 2021
Amount
Construction of Retaining Wall
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
od21735/2020_2021 : Dry rubble masonry with good quality blasted rubble including packing to compactness to lines and levels cost conveyance of all materials labour charges etc complete as per direction of Departmental officers at site.
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification <br> Granular materialBack filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
od21746/2020_2021 : OD-Providing weep holes in Plain/Reinforced concrete abutment, wing wall/return wall, retaining wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face.Complete as per drawing and Technical Specifications
RAFEEQUE P.T
ABILASH.K.K
Bidder Name
ABILASH.K.K
P K AYOOB
RAFEEQUE P.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587727.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .