| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC Agreement03/EE/2022-23 | |
| 2 | L2₹4.7 Cr+₹4.7 Cr (10128.3%)Rejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹32,749.21 (7.06%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.2 L+₹51,545.19 (11.1%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
20 Dec 2021, 12:00 pmClosed
EXECUTIVE ENGINEER
MGCCD-3 AMROHA
LOT 20 Construction Of V.R.B at Km.0.728 of Shahbajpur Minor OF M.G.C STAGE-II
2021_UPIDC_642406_57
02/EE/2021-22
Open Tender
Civil Works - Canal
Item Rate
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹10,000
1 Sept 2022
14 Dec 2021
20 Dec 2021
14 Dec 2021
20 Dec 2021
14 Dec 2021
Amount
Earthwork in excavation in foundation in ordinary soil for structure i/c all lead and reqd. lifts as per site requirement and with proper disposal of excavated earth as per directed by engineer in charge for proper completion of work.
Earth work in filling in ordinary soil including ramming and dressing the surface upto required level and slope lead up to 30m and lift up to 1.5m and carriage 600 Km. Including power transport ie. cost of all labour, T&P etc. complete.
Centering and shuttering for form work I/c all cost of labour and T&P etc for complete for proper completion of work.
Centering and shuttering for R.C.Cwork I/c all cost of labour and T&P etc for complete for proper completion of work.
Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including cost of all material, labour T&P etc complete for proper completion of work.
Cement concrete in (1:3:6) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work.
R.C.C M-20 (1:1.5:3) with cement, coarse sand & crushed stone ballast including cost of all material, labour, mechanical vibration & mixing T&P etc. complete.
First class B/W in 1:4 cement coarse sand, mortar i/c cost of all material, labour T&P etc. complete for proper completion of work.
Struck pointing in 1:2 cement mortar including cost of all material, labour, T&P, curing etc. complete for proper completion of work
S/L of three layer tarfelt painting including cost of all material, labour T&P etc complete.
Providing and fixing of 75 mm dia P.V.C. pipe cost of all material , labour T&P etc. complete for proper completion of work.
Making 25 mm thick expension joint including cost of all material , labour T&P etc. complete for proper completion of work.
M-100 brick on edge paving I/c joints filled with sand including cost of all material labour T&P etc complete for proper completion of work.
Earth work in excavation in Removing diversion
S S CONSTRUCTION COMPANY
CHOUDHARY CONSTRUCTION
RAJ CONTRACTER
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .