| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance NA | PALWAL | HARYANA | 121004 | -2.00% | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹5.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹5.7 L
EMD Value
₹17,200
Closing Date
21 Jul 2026, 2:00 pmClosed
EE Mdda
Mdda office Transport Nagar dehradun
CONSTRUCTION OF RATINING WALL AT KULDI MUSSOORIE.
2026_MDDA_97705_1
MDDA/CIVIL/13/915/2026-2
Open Tender
Civil Works
Percentage
30 days
Dehradun
Please refer Tender documents.
1 document required · 1 mandatory
₹1,180
SECRETARY MDDA
₹17,200
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)Cement Concrete Grade M-15 & M-20 | 11.25 | Cum | 852.1 | ₹9,586.13 |
| 2 | 11-1 Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
11-1-1 Ordinary soil | 7.5 | Cum | 441.4 | ₹3,310.5 |
| 3 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 4.25 | Cum | 4,872.1 | ₹20,706.43 |
| 4 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, inbreast walls, retaining walls, parapets, scuppers, etc. including supply of allmaterial, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Specifiction | 136.5 | Cum | 3,786.1 | ₹5,16,802.65 |
| 5 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) owards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | 18 | Rmt | 191.4 | ₹3,445.2 |
| 6 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 18.75 | Cum | - | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
BOQ_115357.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].