Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC Accepted wide resolution no 1 dated 02/07/2024 of Thrissur DP |
| Sl No | Description | Qty | Unit | DAVIS P.P L1 |
|---|---|---|---|---|
| 1.00LIFT IRRIGATION | ||||
| 1.00 | OD169882/2023-2024:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m:
Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia | 33 | cum | 583.31 ₹19,249.23 Lowest |
| 1.00 | OD169881/2023-2024:Providing and fixing PVC pipes including jointingof pipes with one step solvent cement & testing of joints complete as per direction of Engineer in charge.200mm dia 6kgf/cm2 | 52 | metre | 1,672.44 ₹86,966.88 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 3.85 | cum | 224.73 ₹865.66 Lowest |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 5.2 | cum | 3,666.04 ₹19,070.74 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.23 | cum | 7,155.62 ₹1,610.01 Lowest |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.97 | cum | 6,549.5 ₹6,366.11 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 13.86 | sqm | 329.81 ₹4,571.17 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.39 | cum | 8,390.39 ₹3,230.3 Lowest |
| 1.01 | OD171450/2023-2024:Providing and fixing PVC pipes including jointingof pipes with one step solvent cement &
testing of joints complete as per direction of Engineer in charge.150mm dia 6kgf/cm2 | 11 | metre | 801.58 ₹8,817.38 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,227
Closing Date
23 Feb 2024, 3:00 pmClosed
ASSISTANT ENGINEER,LID AND EW ,ARIMPUR GP
ASSISTANT ENGINEER,LID AND EW ,ARIMPUR GP
PRO. NO127/2023-24 MARATH KADAVU LIFT IRRRIGATION MAINTENANCE
2024_LSGD_651301_19
10/AE/LID EW/AMPR/2023-24
Open Tender
Civil Works - Others
Item Rate
180 days
ARIMPUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,227
Yes
22 Jul 2026
16 Feb 2024
24 Feb 2024
16 Feb 2024
23 Feb 2024
16 Feb 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1020366.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .