Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | ₹3.5 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s PANDEY CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00 | Desilting/cleaning of existing effluent/ storm water carrying drainage system (all types of section of drains) of concerned Industrial area. The scope of work includes cleaning of drains, approaches & cross drainage works up to bed level of the drain/ culvert/ CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes the proper disposal of Sludge/ Silt /Garbage etc. and transportation of the same with all due care to a suitable ultimate disposal to a designated place or outside the Industrial area with all lead & lift, as per the direction of Engineer in-charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/ Silt /Garbage etc. | 11,000 | Per running metre per year | 32 ₹3.5 L |
Tender Value
₹3.9 L
EMD Value
₹7,700
Closing Date
25 May 2026, 6:00 pmClosed
Unit head Kota
Road no. 5 IPIA, near Gobariya babri circle Kota
as per boq
2026_RIICO_558907_2
10/2026-27(4)/781-785
Open Tender
Civil Works
365 days
RIICO Areas Transferred Area, Electronic Complex
as per tender document
3 documents required · 3 mandatory
₹590
RIICO HO payment Gateway
₹7,700
5 Jun 2026
14 May 2026
26 May 2026
15 May 2026
25 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting/cleaning of existing effluent/ storm water carrying drainage system (all types of section of drains) of concerned Industrial area. The scope of work includes cleaning of drains, approaches & cross drainage works up to bed level of the drain/ culvert/ CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes the proper disposal of Sludge/ Silt /Garbage etc. and transportation of the same with all due care to a suitable ultimate disposal to a designated place or outside the Industrial area with all lead & lift, as per the direction of Engineer in-charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/ Silt /Garbage etc. | - | Per running metre per year | 1.25 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TDarea.pdf
Tender Documents • 2.62 MB
desiltofdrainspecialtermsandconditions.pdf
Other Document • 0.31 MB
Paymenttocontractorviaassociation.pdf
Additional Documents • 0.68 MB
BOQ_995263.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid