GE Palampur
Holta Camp Palampur Kangra (H.P) 176061
REPAIR/MAINTENANCE AND REPLACEMENT OF GI WATER SUPPLY DISTRIBUTION LINES WITH GI FITTING AND OTHER MISC WORKS AT ALHILAL AND PALAMPUR MIL STN
2020_MES_408449_1
GEP-/2020-21
Open Tender
Civil Works
Item Rate
180 days
Palampur
As per tender documents
8 documents required · 8 mandatory
₹500
Yes
GE Palampur
₹17,000
Yes
23 Mar 2021
31 Dec 2020
25 Jan 2021
31 Dec 2020
23 Jan 2021
8 Jan 2021
Amount
Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in deep for foundation, taking up/down or laying of GI tubing/CI pipe etc or for shaft, wells, cesspits, manholes, pier holes etc not exceeding 10 sqm on plan and getting out in hard dense soil complete all as specified & directed.
Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified & directed.
Removing excavated soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified & directed.
Taking up or down old GI tubing 15 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 20 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 25 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 32 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 40 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 50 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 65 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 80 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Taking up or down old GI tubing 100 mm bore and connections (including fittings) from trenches/walls /floors and connections including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed.
Supplying, laying, jointing and testing 15 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 20 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 25 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 32 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 40 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 50 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 65 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 80 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
Supplying, laying, jointing and testing 100 mm bore galvanised steel water tubing medium grade (ISI marked) laid in trenches with medium grade galvanised iron fitting (ISI marked) such as bends, tees, sockets, nipples & unions, flanges etc complete all as specified and directed.
S&F in replacement ,65 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,50 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,40 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,32 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,25 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,20 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
S&F in replacement ,15 mm bore gun metal, globe or gate valve, heavy duty confirming to IS -778 with iron wheel head, screwed both ends for iron pipe complete all as specified and directed.
Supply only alum sulphate best quality from approved chemical manufacturer complete all as specified and directed.
Supply only calcium hydrochloride in granual form on 45 kg drum having minimum 65-70% of available chlorine with anti-corrosive and anti scaling properties suitable for human consumption chemical manufacturer complete all as specified and directed.
S&F in replacement ball valve high pressure of PTMT with epoxy coated aluminium rod and highdensity plastic ball screwed for 15mm bore GI tubing (minimum weight 142 gms ) complete all as specified and directed.
S&F in replacement ball valve high pressure of PTMT with epoxy coated aluminium rod and highdensity plastic ball screwed for 20mm bore GI tubing (minimum weight 210 gms ) complete all as specified and directed.
S&F in replacement ball valve high pressure of PTMT with epoxy coated aluminium rod and highdensity plastic ball screwed for 25mm bore GI tubing (minimum weight 455 gms ) complete all as specified and directed.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 15mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tank nipple (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 15mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 20mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tank nipple (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 20mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 25mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tank nipple (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 25mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 32mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 32mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 40mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 40mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 50mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Three way elbow (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 50mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 65mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 65mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 65mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 65mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 65mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 65mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 80mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 80mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 80mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 80mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 80mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 80mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting nipple (ISI marked) 25mm to 200mm long suitable for 100mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Tee (ISI marked) suitable for 100mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Elbow (ISI marked) suitable for 100mm bore GI tubing, including excavation and earth work if requiredcomplete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Socket (ISI marked) suitable for 100mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Union (ISI marked) suitable for 100mm bore GI tubing, including excavation and earth work complete all as specified and directed by Engineer-in-Charge.
Detecting the leakage of UG GI pipe line and rectifying the leakage by means of cutting , screwing and re-aliging the pipe line by insearting Plug of any type (ISI marked) suitable for 100mm bore GI tubing, including excavation and earth work if required complete all as specified and directed by Engineer-in-Charge.
M/s Sheetal Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .