ADDL. CHIEF ENGINEER (M)-4
ADDL. CHIEF ENGINEER (M)-4
Repairing/ Renovation of Pump Sets No. 2 and 4 foundation at Kewal Park Booster Pumping Station.
2022_DJB_217744_1
NIT No. 12 Item No. 6 EE (T)/ACE( M)-4
Open Tender
Miscellaneous Works
Works
15 days
ADDL. CHIEF ENGINEER (M)-4
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Account No SB 50448339804
₹11,200
9 Mar 2022
28 Feb 2022
7 Mar 2022
28 Feb 2022
7 Mar 2022
28 Feb 2022
Disconnection of electric connection from motor & removing of foundation bolts of motor and removing of coupling of both pump and motor, taking out electric motor from its frame to outside to safer side in the pump house by HOT crane and manual labour.
Closing of sluice valve, dismantling the pump and motor by cutting of nut bolts with gas cutter and removing of all nut bolts connected with pump set and taking out with the foundation frame with the help of HOT crane to safer side of pump house. The job i/c providing the temporary blank flange for suction and delivery side during execution of work.
Breaking of RCC by concrete breaker for foundation bolt pocket upto 2 ft. deep and removing of melba of CC from the foundation side by manual labour from the depth of approximate 13 mtrs. from ground floor to outside of pump house.
Removing of foundation bolt by manual labour to clean by hammering of chisel to make the bolt free from the RCC foundation bolt.
Making of M.S. foundation bolt of size approximate 32mm dia x 450mm @14 Nos.
Fixing of M.S. foundation bolt as in pocket by proper welding with the existing M.S. jaal of RCC with proper support etc. @14 Nos.
Fabrication/supply of m.s base frame as per existing.
Casting the pockets after fixing the foundation bolts.
Levelling of M.S. base frame on R.C.C. foundation.
Supply of nut bolts as per sample/as per site requirement.
Supply of rubber packing of suitable thickness.
Fixing of pump set on foundation frame with the help of EOT crane and making of proper alignment of suction line as well delivery line with required hardware goods.
Testing and commissioning charges of complete pump set with delivery lines.
Painting the complete delivery vertical line with two coats of anti corrosive paint.
Gupta Brothers
Raj Engineering Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .