| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 CrAccepted-AOC | ₹38.7 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC fulfil the criteria and L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical not fullfilling the criteria as per bid document |
| 3 | Rejected-Technical | - | - | Rejected-Technical not fullfilling the criteria as per bid document |
| 4 | Rejected-Technical | - | - | Rejected-Technical not fullfilling the criteria as per bid document |
| 5 | Rejected-Technical | - | - | Rejected-Technical not fullfilling the criteria as per bid document |
Tender Value
Refer Docs
Closing Date
3 Dec 2019, 2:30 pmClosed
Managing Director, ASWC
Assam State Warehousing Corporation, Amarawati Path, Christianbasti, Guwahati05
Architectural consultancy service (under PMC mode) for Establishment of 5000 MT Capacity Multi commodity Cold Storage at Pachim Boragaon ( under district Kamrup (M)) and Hojai (under district Hojai) under single package.
2019_CD_14932_1
AWC.Engg.507/2019/CS /NABARD/WIF/36 DTD 25/11/2019
Open Tender
Consultancy
45 days
Please refer Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Managing Director, ASWC
Exempted
ASWC H/O Christian basti
5 Sept 2020
25 Nov 2019
3 Dec 2019
25 Nov 2019
3 Dec 2019
25 Nov 2019
28 Nov 2019
Amount
Topographical survey of the site, preparation of preliminary Master Plan and site planning in respect of adjoining road , HFL etc and Sub-soil investigation report.
Preparation of Preliminary Architectural Drawings for approval of the authority and submission of Modified ( if any) drawing on basis of approved Master Plan.
Preparation of Detailed Architectural and Structural drawing indicating all the positions of machineries, equipment etc.
Preparation of Detailed specifications of Machineries insulation, electrical work, BoQ for Civil works obtaining at least 3 (three) quotations for PEB and preparation and submission of estimate for approval of authority.
Preparation of on line Bid document, supporting authority for invitation of Bid, evaluation of Bid document and any other works related to Bid process for engagement of contractor to implementation of the Project.
Submission of all drawing for services like water supply, sanitary, external electrification, and landscaping drain, culvert, roads and any other drawing as per site requirement to complete the project.
Supervision and Monitoring of work at site
a) After handing over the site to the contractor and Mobilization of site Engineer to the site.
b) After completion of foundation of all structure on site.
c) After completion of super structures of all structure on site.
d) On completion of all the services works.
e) On successful completion of the project, trial run of Cold Storage and certification of machineries installation
Quality control of executed works & evaluation of contractor's bill
Submission of " Revised Drawing", design etc incorporating modification required during construction including visiting site
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid