Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | REJAKUMAR L1 |
|---|---|---|---|---|
| 1.00ROOF COVERING & TOILET BLOCK | ||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.44 | cum | 3,600 ₹5,184 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.24 | cum | 2,100 ₹504 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.13 | cum | 13,400 ₹15,182.2 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 15.11 | sqm | 760 ₹11,479.8 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 226.57 | kilogram | 112 ₹25,376.4 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 7.63 | cum | 7,700 ₹58,789.5 Lowest |
| 1.01 | 6.47:Providing and laying Autoclaved Aerated concrete (AAC) blocks masonry
150mm/230mm/300 mm thick with Grade- I AAC blocks in super structure
above plinth level up to floor V level with RCC band at sill level and lintel
level with approved block laying polymer modified adhesive mortar all
complete as per direction of Engineer-in-Charge. (The payment of RCC band
and reinforcement shall be made for seperately). | 1.38 | cum | 9,040 ₹12,493.28 Lowest |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 461.56 | kilogram | 130 ₹60,002.41 Lowest |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,842.23 | kg | 145 ₹2,67,123.35 Lowest |
Tender Value
₹14.2 L
EMD Value
₹35,588
Closing Date
30 Jul 2026, 5:00 pmClosed
Executive Engineer
O/O THE EXECUTIVE ENGINEER,LSGD DIVISION CIVIL
RE TENDER LAC ADS LAC ADS 22093 P P Chitharanjan Hon MLA Maintenance works to Deshabhimani Library in Mannancherry GP SF General Civil Work
2026_LSGD_861913_5
JP/JULY/FRESH/LIDEW/ALPY/26-27
Open Tender
Civil Works - Buildings
Item Rate
300 days
ALAPPUZHA DP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹35,588
Yes
1 Aug 2026
22 Jul 2026
1 Aug 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROOF COVERING & TOILET BLOCK | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.003 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.006 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.007 | 6.47:Providing and laying Autoclaved Aerated concrete (AAC) blocks masonry
150mm/230mm/300 mm thick with Grade- I AAC blocks in super structure
above plinth level up to floor V level with RCC band at sill level and lintel
level with approved block laying polymer modified adhesive mortar all
complete as per direction of Engineer-in-Charge. (The payment of RCC band
and reinforcement shall be made for seperately). | 1 | cum | - | - |
| 1.008 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 0.8 | kilogram | - | - |
| 1.009 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | - | - |
stage.html
html • 0.02 MB
finance_1457744.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 0.26 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.29 MB
SBD.pdf
Tender Documents • 2.08 MB
BOQ_1457744.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .