Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹24,300
Closing Date
5 Oct 2026, 3:30 pm
Assistant Executive Engineer
Line Maintenance Sub Division,Alappuzha
Replacing of porcelain disc insulators with composite polymer insulators of 1CNPU feeder
2026_KSEB_870710_1
TENDER/2026-27/3239/9 DATED 17-09-2026
Open Tender
Electrical Works
Percentage
120 days
Punnapra-Pallom-Chengalam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,360
₹24,300
22 Sept 2026
22 Sept 2026
9 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
22 Sept 2026 - 5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacing 110kV Suspension insulator | |||||
| 1.01 | Dismantling of one set suspension clamp with line conductor from 66 kV/110 kV suspension string after lifting the conductor using special
appliances, placing the conductor with suspension clamp on tower cross
arm, dismantling the string and lowering the string using rope and pulley, then lifting new composite polymer insulator and placing it to the existing U bolt at cross arm using rope and pulley then lifting the line conductor
with suspension clamp and connecting the same to the bottom of composite polymer insulator, then releasing the conductor load to the suspension insulator, etc. as per the direction of department staff | 174 | Set | 1,552.92 | ₹2,70,208.08 |
| 2Replacing 110kV Tension insulator | |||||
| 2.01 | Dismantling one set tension string from the 110 kV tension tower and conductor after tensioning the conductor and holding the conductor with the cross arm using special appliances then bringing down the tension
string carefully, lifting new composite polymer insulator, connecting new insulator to the U bolt at tower end and tension clamp with conductor at other end, then releasing the conductor load to the tension insulator, etc.complete as per the direction of department staff | 69 | Set | 3,606.07 | ₹2,48,818.83 |
| 2.02 | Dismantling one set tension string from the 110 kV tension tower and conductor aftertensioning the conductor and holding the conductor with the cross arm using special appliances then bringing down the tension string carefully, lifting new composite polymer insulator, connecting new insulator to the U bolt at tower end and tension clamp with conductor at other end, then releasing the conductor load to the tension insulator, etc.complete as per the direction of department staff direction of departmental staff. Special tools if available will be supplied at free of cost. (cost index(e) : 1.3132 included in Rate) | 27 | Set | 7,212.13 | ₹1,94,727.6 |
| 3Transporting materials | |||||
| 3.01 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by
head load and initial lift of 1.5m at each end etc. - By lorry over 9km and upto 10km for Insulators and accessories, power conductor accessories and earth conductor accessories etc | 11.87 | MT | 1,140.23 | ₹13,528.77 |
| 3.02 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By lorry for every additional km or part there of over 10km, for Insulators and accessories, power conductor accessories and earth conductor accessories | 593.25 | MT-KM | 22.29 | ₹13,220.58 |
| 3.03 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by
head load and initial lift of 1.5m at each end etc. - By Boat over 9km and upto 10km for Insulators and accessories, power conductor accessories and earth conductor accessories etc | 11.87 | MT | 857.09 | ₹10,169.33 |
| 3.04 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By Boat for every additional km or part thereof over 10km for Insulators and accessories, power conductor accessories and earth conductor accessories etc | 118.65 | MT-KM | 31.2 | ₹3,702.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.26 MB
GCC.pdf
Tender Documents • 0.93 MB
BoundenAgreement.pdf
Tender Documents • 0.40 MB
FormofTender.pdf
Tender Documents • 0.97 MB
Declarations.pdf
Other Document • 0.32 MB
SpecialConditions.pdf
Tender Documents • 0.34 MB
Technicalspec.pdf
Tender Documents • 0.30 MB
BOQ_1477695.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .